Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

9 South Kingslea Dr

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - To construct a partials second storey addition, front covered porch, interior alterations and detached rear shed

    Applied Feb 4, 2022 · issued Feb 7, 2022 · completed Apr 1, 2022 · Permit 21 207948 DRN

    Closed
  • Heating and ventilation

    HVAC - To construct a partial second storey addition, front covered porch, interior alterations and detached rear shed

    Applied Sep 2, 2021 · issued Nov 16, 2021 · completed Aug 26, 2022 · Permit 21 207948 HVA

    Closed
  • Plumbing

    Plumbing - To construct a partials second storey addition, front covered porch, interior alterations and detached rear shed

    Applied Sep 2, 2021 · issued Nov 16, 2021 · completed Aug 26, 2022 · Permit 21 207948 PLB

    Closed
  • Small residential project · Multiple projects

    To construct a partials second storey addition, front covered porch, interior alterations and detached rear shed

    Applied Sep 2, 2021 · issued Nov 16, 2021 · completed Jul 23, 2024 · Permit 21 207948 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · NR addition

    To construct a partial second storey above the existing dwelling, a new covered front porch and a new rear shed.

    Decision: Approved (hearing May 20, 2021)

    Filed Apr 1, 2021 · File A0179/21EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 17 Kirk Bradden Rd E · Minor variance

    To construct a new detached dwelling with an attached garage.

    200 m away · filed Jan 20, 2026 · Approved

  • 9 Kirk Bradden Rd E · Minor variance

    To construct a partial second storey addition on the existing dwelling.

    220 m away · filed Dec 24, 2025 · Approved

  • 28 Sunnylea Ave E · Minor variance

    To maintain the altered dwelling currently under construction, including the existing detached garage. A previous Committee of Adjustment application (A0212/22EYK) approved variances related to side yard setback, flat roof height, and setback encroachments.

    230 m away · filed Oct 16, 2025 · Approved

  • 7 Kirk Bradden Rd E · Minor variance

    To construct a new detached dwelling with an attached garage.

    240 m away · filed Aug 6, 2025 · Approved

  • 49 Glenellen Dr E · Minor variance

    To construct a new detached dwelling with an attached garage.

    190 m away · filed Jun 19, 2025 · Approved

  • 32 Bernice Ave · Minor variance

    To construct rear two-storey addition and second storey addition above the existing dwelling along with a cabana in the rear yard.

    250 m away · filed Sep 12, 2024 · Approved

  • 19 South Kingslea Dr · Minor variance

    To construct a basement addition to connect an existing detached dwelling to an existing detached garage and a proposed deck above an existing garage.

    80 m away · filed Jul 14, 2023 · Approved

  • 3 Kirk Bradden Rd E · Minor variance

    To construct two-storey rear and north side additions and a second storey addition above the existing dwelling.

    250 m away · filed Aug 25, 2022 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.