The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - Porposal to finish the basement in existing semi-detached SFD.
Applied Apr 11, 2013 · issued Apr 11, 2013 · Permit 13 148648 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal to finish the basement in existing semi-detached SFD.
Applied Apr 11, 2013 · issued Apr 11, 2013 · Permit 13 148648 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
59 Blake St · Minor variance
150 m away · filed Aug 28, 2026 · Postponed
416 Jones Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition (front porch enclosure) with a bay window, a front porch with stairs, a rear two-storey addition (partially cantilevered on the west side) and a one-storey addition with a rear ground floor deck with stairs.
190 m away · filed Nov 21, 2024 · Approved
68 Wroxeter Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition.
220 m away · filed Sep 12, 2024 · Approved
80 Wroxeter Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition, and a front third storey dormer.
210 m away · filed Sep 20, 2023 · Approved
287 Withrow Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a partial front second storey addition, partial front and rear third storey additions (with front second and third storey juliette balconies), and a rear third storey balcony.
210 m away · filed Aug 16, 2023 · Approved
76 Dingwall Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a partial rear third storey addition.
50 m away · filed Mar 28, 2023 · Approved
515 Pape Ave · Minor variance
To alter the existing one-storey ancillary building by constructing a complete second storey with a roof terrace. This building will be converted into a garden suite.
180 m away · filed Jan 17, 2023 · Approved
42 Dingwall Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition.
120 m away · filed Dec 1, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.