Toronto address · Ward 3, Etobicoke-Lakeshore
91 Lake Promenade
The City of Toronto has 7 building permits since 2017 (3 still open) and 3 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
REVISION 02: Front and small side addition with integral garage. Driveway size reduction and resurfacing. The existing structure will be gutted and all services, cladding, windows and finishes to be replaced.Proposal to construct a roof and wall for second floor loggia, remove east elevation bump out, interior alterations to the basement that include below grade plumbing and the replacement of rear deck with a smaller deck. Proposal to construct a roof and wall for second floor loggia, remove east elevation bump out, interior alterations to the basement that include below grade plumbing and t…
Applied Jun 8, 2023 · issued Jul 21, 2023 · Permit 22 159745 BLD (revision 02)
- Closed
Heating and ventilation
HVAC - Proposal to construct a roof and wall for second floor loggia, remove east elevation bump out, interior alterations to the basement that include below grade plumbing and the replacement of rear deck with a smaller deck. Proposal to construct a roof and wall for second floor loggia, remove east elevation bump out, interior alterations to the basement that include below grade plumbing and the replacement of rear deck with a smaller deck. Proposal to construct a roof and wall for second floor loggia, remove east elevation bump out, interior alterations to the basement that include below g…
Applied May 18, 2023 · issued Jun 9, 2023 · completed Sep 29, 2025 · Permit 22 159745 HVA
- Inspections under way
Small residential project · Multiple projects
Proposal to construct a roof and wall for second floor loggia, remove east elevation bump out, interior alterations to the basement that include below grade plumbing and the replacement of rear deck with a smaller deck. Proposal to construct a roof and wall for second floor loggia, remove east elevation bump out, interior alterations to the basement that include below grade plumbing and the replacement of rear deck with a smaller deck. Proposal to construct a roof and wall for second floor loggia, remove east elevation bump out, interior alterations to the basement that include below grade pl…
Applied Jun 9, 2022 · issued Nov 16, 2022 · Permit 22 159745 BLD
- Inspections under way
Drains and site services
Drain - Proposal to construct a roof and wall for second floor loggia, remove east elevation bump out, interior alterations to the basement that include below grade plumbing and the replacement of rear deck with a smaller deck.
Applied Jun 9, 2022 · issued Nov 16, 2022 · Permit 22 159745 DRN
- Closed
Plumbing
Plumbing - Proposal to construct a roof and wall for second floor loggia, remove east elevation bump out, interior alterations to the basement that include below grade plumbing and the replacement of rear deck with a smaller deck.
Applied Jun 9, 2022 · issued Nov 16, 2022 · completed Sep 29, 2025 · Permit 22 159745 PLB
- Closed
Small residential project · Pool fence enclosure
Proposal to install a pool and enclosure at the rear of an existing SFD-detached dwelling.
Applied Feb 18, 2021 · completed Feb 18, 2021 · Permit 21 117646 BLD
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install back water valve.
Applied Oct 31, 2018 · issued Oct 31, 2018 · completed Nov 6, 2018 · Permit 18 250435 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To construct a two-storey front addition and a new rear deck.
Decision: Refused (hearing Mar 10, 2022)
Filed Jan 4, 2022 · File A0015/22EYK
- TLAB appeal
Minor variance · R addition
To construct a two-storey front addition and a new rear deck.
Decision: Refused (hearing Nov 30, 2021)
Filed Oct 16, 2021 · File A0526/21EYK
- Closed
Minor variance · R addition
To construct a two-storey front addition and a new rear deck.
Decision: Refused (hearing Aug 26, 2021)
Filed Apr 17, 2021 · File A0222/21EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
31 Elton Cres · Minor variance
To construct a new detached garage in the rear yard.
240 m away · filed Dec 8, 2025 · Approved
12 Twenty Fifth St · Minor variance
To construct a two-storey south side addition, a partial second storey addition, a new front porch and a rear yard deck.
220 m away · filed Nov 19, 2025 · Approved
99 Lake Promenade · Minor variance
To construct a new detached dwelling with an attached garage.
20 m away · filed Nov 7, 2023 · Approved
7 Elton Cres · Minor variance
To construct a new detached dwelling with an attached garage.
130 m away · filed Oct 6, 2023 · Deferred
7 Elton Cres · Minor variance
To construct a new detached dwelling with an attached garage.
130 m away · filed Oct 6, 2023 · Deferred
7 Elton Cres · Consent
To obtain consent to sever the property into two undersized lots.
130 m away · filed Sep 15, 2023 · Deferred
1 Twenty Seventh St · Minor variance
To construct a second storey addition above the existing dwelling.
140 m away · filed Aug 22, 2023 · Approved
126 Lake Promenade · Minor variance
To construct an in-ground pool and a garage in the rear yard.
160 m away · filed Nov 7, 2022 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.