Toronto address · Ward 10, Spadina-Fort York
93 Bellwoods Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Garage
Proposal to construct a detached garage in the rear yard of an existing SFD-semi dwelling.
Applied Apr 12, 2017 · issued Apr 13, 2017 · completed Jan 28, 2019 · Permit 17 143197 BLD
- Closed
Plumbing
Plumbing - Underpin portion of wall in connection with work at 91 Bellwoods Av.
Applied Nov 20, 2006 · issued Mar 1, 2007 · completed Jan 20, 2022 · Permit 06 192551 PLB
- Closed
Small residential project · Underpinning
Underpin portion of wall in connection with work at 91 Bellwoods Av.
Applied Nov 20, 2006 · issued Mar 1, 2007 · completed Jan 20, 2022 · Permit 06 192551 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
86 Bellwoods Ave · Minor variance
To legalize and to maintain the rear second storey deck with stairs of the existing two-and-one-half-storey semi-detached dwelling, that was constructed without an authorized building permit.
50 m away · filed Jan 23, 2026 · Postponed
119 Bellwoods Ave · Minor variance
To alter the existing rear one-storey ancillary building (detached garage) by constructing a complete second storey addition (cantilevered on the west side with a balcony), for one laneway suite. There will be a total of two residential dwelling units on this lot (one unit occupying the main dwelling and one unit occupying the ancillary building). The existing parking space, within the ancillary building, will be maintained.
60 m away · filed Sep 16, 2025 · Approved
177 Manning Ave · Minor variance
To construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
230 m away · filed Jun 25, 2025 · Approved
181 Manning Ave · Minor variance
To construct a new two-storey ancillary building (containing one parking space on the ground level, and one laneway suite on the second level) with a cantilevered second storey, located in the rear yard of the property, abutting the laneway. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).
240 m away · filed Apr 17, 2025 · Approved
113 Bellwoods Ave · Minor variance
To permit the front basement walkout of the existing two-storey townhouse dwelling, which is currently under construction (under Building Permit 20 24 174134 BLD). The existing rear one-storey ancillary building (detached garage) will be demolished.
50 m away · filed Apr 17, 2025 · Approved
104 Manning Ave · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a complete third storey addition (cantilevered on the west side) with a front third storey covered balcony. Also, to reconstruct the front second storey balcony.
110 m away · filed Dec 30, 2024 · Approved
176 Manning Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a front balcony, and a front basement walk out.
190 m away · filed Aug 29, 2024 · Approved
16 Crocker Ave · Minor variance
To legalize and to maintain the new three-storey detached dwelling (containing three dwelling units) currently under construction, as approved under TLAB Decision Order 22 202596 S45 10, which was constructed beyond the limits of an approved building permit.
240 m away · filed Jul 7, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.