Toronto address · Ward 3, Etobicoke-Lakeshore
94 Yorkview Dr
The City of Toronto has 6 building permits since 2017 (6 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation
HVAC - Proposal to demolish the existing dwelling and construct a new two storey, two unit dwelling with integral garage, basement walkout, first floor rear deck and a front porch.
Applied Mar 31, 2026 · issued Apr 17, 2026 · Permit 26 106876 HVA
- Revision issued
New house · New building
Revision 01: Revision to permit to include revision to front elevation and 2nd floor plan layoutProposal to demolish the existing dwelling and construct a new two storey, two unit dwelling with integral garage, basement walkout, first floor rear deck and a front porch.
Applied Mar 10, 2026 · issued Mar 27, 2026 · Permit 26 106876 BLD (revision 01)
- Inspections under way
New house · New building
Proposal to demolish the existing dwelling and construct a new two storey, two unit dwelling with integral garage, basement walkout, first floor rear deck and a front porch.
Applied Jan 20, 2026 · issued Feb 26, 2026 · 2 homes added · Permit 26 106876 BLD
- Permit issued
Plumbing
Plumbing - Proposal to demolish the existing dwelling and construct a new two storey, two unit dwelling with integral garage, basement walkout, first floor rear deck and a front porch.
Applied Jan 20, 2026 · issued Feb 26, 2026 · Permit 26 106876 PLB
- Inspections under way
Drains and site services
Drain - Proposal to demolish the existing dwelling and construct a new two storey, two unit dwelling with integral garage, basement walkout, first floor rear deck and a front porch. BACKWATER VALVE INCLUDED
Applied Jan 20, 2026 · issued Feb 26, 2026 · Permit 26 106876 DRN
- Permit issued
Demolition
Proposed demolition of existing SFD detached for new construction of 2 unit detached
Applied Jan 20, 2026 · issued Feb 26, 2026 · 1 home removed · Permit 26 106939 DEM
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
72 Edgecroft Rd · Minor variance
To construct a new detached dwelling with an attached garage.
120 m away · filed Dec 17, 2025 · Approved
44 Ambleside Ave · Minor variance
To construct a new detached dwelling with a secondary suite and an attached garage
190 m away · filed Sep 30, 2025 · Approved
70 Edgecroft Rd · Minor variance
To construct a new detached dwelling with an attached garage.
130 m away · filed Jun 19, 2025 · Approved
60 Athol Ave · Minor variance
To construct a new detached dwelling with an attached garage.
200 m away · filed Nov 5, 2024 · Approved
65 Edgecroft Rd · Minor variance
To construct a new detached dwelling with an attached garage.
170 m away · filed Feb 22, 2023 · Approved
59 Edgecroft Rd · Minor variance
To construct a new rear yard deck. A previous Committee of Adjustment application (A0323/20EYK) approved variances relating to floor space index, dwelling length, soffit height and driveway width.
200 m away · filed Aug 24, 2022 · Approved
80 Edgecroft Rd · Minor variance
To construct a two-storey rear addition, a two-storey east side addition and a second storey addition above the existing dwelling.
100 m away · filed Apr 14, 2022 · Approved
75 Edgecroft Rd · Minor variance
To construct a two-storey east side and rear addition that will include an attached garage, two one-storey front additions, a second storey addition above the existing dwelling, a new front porch and a rear yard deck. The existing shed in the rear yard will be maintained.
150 m away · filed Jan 13, 2022 · Application withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.