95 Gamble Ave

The City of Toronto has 22 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    REV - 01for new HVAC system.HVAC - Applicant proposed interior alteration on the ground floor (unit 108) of the existing apartment building

    Applied Sep 18, 2019 · issued Oct 24, 2019 · completed Oct 28, 2019 · Permit 16 125619 HVA (revision 01)

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Revision # 01 - To install a 3" D.C.V.A. Back Flow Prevention Device in the existing apartment building.Install new backflow prevention device.

    Applied Jul 16, 2019 · issued Aug 14, 2019 · completed Aug 26, 2019 · Permit 18 260967 PSA (revision 01)

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Install new backflow prevention device.

    Applied Nov 26, 2018 · issued Dec 24, 2018 · completed Aug 26, 2019 · Permit 18 260967 PSA

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to convert ground floor storage room to a dwelling unit (Unit 114) total 94 dwelling units.

    Applied Sep 26, 2018 · issued Oct 31, 2018 · completed Feb 11, 2019 · Permit 18 226572 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to convert ground floor storage room to a dwelling unit (Unit 114) totally 94 dwelling units.

    Applied Sep 26, 2018 · issued Oct 31, 2018 · completed Aug 26, 2019 · Permit 18 226572 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to convert ground floor storage room to a dwelling unit (Unit 114) total 94 dwelling units. (see cofa dec A0376 which allowed for a total of 94 units which corrected previous records that referred to it as 93)

    Applied Sep 17, 2018 · issued Oct 31, 2018 · completed Oct 31, 2019 · 1 home added · Permit 18 226572 BLD

    Closed
  • Addition or alteration · Interior alterations

    Revision to floor and storage walls. The ramp from existing hallway to new hallway has been replaced by Stairs. The floor height of the new dwelling unit has been lowered by 3 inches.

    Applied Jan 22, 2018 · issued Mar 5, 2018 · completed Jun 4, 2018 · Permit 16 241935 BLD (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Revision to unit 103 layout.I.The suite kitchen layout and configuration of the bedroom door and entry closet were revised during construction phase to better accommodate the existing services.II.The layout of the washing machines and dryers was revised during construction to better suit the existing drainage in the parking garage below.

    Applied Jan 22, 2018 · issued Mar 8, 2018 · completed Sep 21, 2018 · Permit 15 249550 BLD (revision 02)

    Closed
  • Heating and ventilation

    HVAC Revision - to unit 103 and laundry room.

    Applied Jan 22, 2018 · issued Feb 15, 2018 · completed May 25, 2018 · Permit 15 249550 HVA (revision 01)

    Closed
  • Heating and ventilation

    Revision to add heating system.HVAC - Proposal to alter the existing six-storey apartment building by converting existing ground floor storage space (garage) into two dwelling units (#112 + 114), resulting in a total of 94 dwelling units within the building.

    Applied Jul 20, 2017 · issued Aug 18, 2017 · completed Sep 6, 2018 · Permit 16 241935 HVA (revision 01)

    Closed
  • Plumbing

    Plumbing - Proposal to alter the existing six-storey apartment building by converting existing ground floor storage space (garage) into two dwelling units (#112 + 114), resulting in a total of 94 dwelling units within the building.

    Applied Nov 3, 2016 · issued Dec 23, 2016 · completed Jul 13, 2018 · Permit 16 241935 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal to alter the existing six-storey apartment building by converting existing ground floor storage space (garage) into two dwelling units (#112 + 114), resulting in a total of 94 dwelling units within the building.

    Applied Nov 3, 2016 · issued Dec 23, 2016 · completed Sep 6, 2018 · Permit 16 241935 HVA

    Closed
Show 10 more permits
  • Addition or alteration · Interior alterations

    Proposal to alter the existing six-storey apartment building by converting existing ground floor storage space (garage) into one dwelling units (STE 112) , resulting in a total of 93 dwelling units within the building. [CALL: Carleen Blissett at 5-7064 in Property Standards when Permit ready for issuance].

    Applied Oct 24, 2016 · issued Dec 23, 2016 · completed Jun 4, 2018 · Permit 16 241935 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposed interior alterations to the ground floor parking area to add 5 windows but to maintain area as parking

    Applied Oct 6, 2016 · issued Oct 19, 2016 · completed Oct 10, 2019 · Permit 16 233946 BLD

    Closed
  • Heating and ventilation

    HVAC - Applicant proposed interior alteration on the ground floor (unit 108) of the existing apartment building

    Applied Mar 15, 2016 · issued Apr 14, 2016 · completed Oct 28, 2019 · Permit 16 125619 HVA

    Closed
  • Plumbing

    Plumbing - Applicant proposed interior alteration on the ground floor (unit 108) of the existing apartment building

    Applied Mar 15, 2016 · issued Apr 14, 2016 · completed Jul 5, 2017 · Permit 16 125619 PLB

    Closed
  • Addition or alteration · Interior alterations

    Applicant proposed interior alteration on the ground floor (unit 108) of the existing apartment building

    Applied Mar 9, 2016 · issued Mar 22, 2016 · completed Oct 31, 2019 · Permit 16 125619 BLD

    Closed
  • Heating and ventilation

    HVAC - To convert the existing 6-storey apartment building containing 90 units into a 91 unit apartment building by constructing one new dwelling units on the ground floor, and converting the existing vestibule into a laundry room.

    Applied Nov 10, 2015 · issued Feb 28, 2017 · completed May 25, 2018 · Permit 15 249550 HVA

    Closed
  • Plumbing

    Plumbing - To convert the existing 6-storey apartment building containing 90 units into a 91 unit apartment building by constructing one new dwelling units on the ground floor, and converting the existing vestibule into a laundry room.

    Applied Nov 10, 2015 · issued Feb 28, 2017 · completed Jul 5, 2017 · Permit 15 249550 PLB

    Closed
  • Addition or alteration · Interior alterations

    To convert the existing 6-storey apartment building containing 90 units into a 91 unit apartment building by constructing one new dwelling unit on the ground floor, and converting the existing vestibule into a laundry room. (revisions to plans reduced number of units added from 3 to 1. applicant didn't want to pay additional development fees)

    Applied Nov 10, 2015 · issued Jan 27, 2016 · completed Sep 21, 2018 · Permit 15 249550 BLD

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install 1 backflow prevention device and a booster pump in an existing apartment building.

    Applied Oct 22, 2014 · issued Nov 18, 2014 · completed Dec 28, 2018 · Permit 14 241229 PSA

    Cancelled
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install one backflow prevention device in existing apartment building.

    Applied Dec 14, 2009 · issued Jan 12, 2010 · completed Dec 28, 2018 · Permit 09 196390 PSA

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 148 Gamble Ave · Minor variance

    To construct a new two-storey detached ancillary building (garden suite), in the rear yard. The existing two-and-one-half storey detached dwelling will be maintained and unaltered.

    240 m away · filed Mar 3, 2023 · Approved

  • 185 Gowan Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a detached ancillary building (gazebo) in the rear yard.

    250 m away · filed Oct 11, 2022 · Approved

  • 70 Torrens Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing second storey additions to the east and west sides of the dwelling. There will be two residential dwelling units within this dwelling (one primary unit and one secondary suite).

    190 m away · filed Sep 5, 2022 · Approved

  • 101 Cosburn Ave · Minor variance

    To alter the existing nine-storey apartment building by converting a three bedroom unit and superintendent office into two one-bedroom units.

    110 m away · filed Jun 3, 2019 · Withdrawn

  • 85 Torrens Ave · Minor variance

    To construct a new three-storey detached dwelling with a front third storey deck and an east side third storey courtyard.

    140 m away · filed Dec 20, 2018 · Refused

  • 1018 Pape Ave · Minor variance

    To convert the existing one-storey commercial building into a mixed use building by constructing a second storey addition containing one dwelling unit, a rear one-storey addition, and converting a portion of the basement to commercial use.

    120 m away · filed Dec 3, 2018 · Approved

  • 1052 Pape Ave · Minor variance

    To demolish the existing gas station and single storey retail space. To re-develop the site by constructing a single storey commercial building with 10 parking spaces and one loading space at the rear.

    50 m away · filed Oct 26, 2018 · Approved

  • 140 Gowan Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition.

    200 m away · filed May 12, 2017 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.