Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

95 Langley Ave

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Carport

    Demolition of garage, will have parking pad instead

    Applied Sep 7, 2017 · issued Sep 8, 2017 · completed Aug 15, 2019 · Permit 17 229029 BLD

    Closed
  • Small residential project · Deck

    Proposed rear third floor roof top deck

    Applied May 10, 2017 · issued May 18, 2017 · completed Jun 5, 2017 · Permit 17 157562 BLD

    Closed
  • Plumbing · Fixtures/Roof Drains: SFD

    Proposal for installing (2) new plumbing fixtures to 3rd floor bathroom and rolcation of plumbing fixtures on ground floor

    Applied Apr 25, 2017 · issued Apr 26, 2017 · completed Jun 5, 2017 · Permit 17 149088 PSA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 415 Broadview Avenue

    51 homes · Residential

    400 m away · Site plan · Under review · filed Apr 24, 2024

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 60 Withrow Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a third storey east side (dormer) addition, and a rear third storey addition.

    240 m away · filed Apr 30, 2026 · Approved

  • 130 Riverdale Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition (above a portion of the existing two-storey addition).

    200 m away · filed Apr 20, 2026 · Approved

  • 121 Victor Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a partial rear third storey addition and a side (east) third floor roof deck (partially located on the roof of the second storey below and partially cantilevered).

    90 m away · filed Apr 9, 2026 · Approved

  • 119 Victor Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey dormer addition.

    90 m away · filed Mar 2, 2026 · Approved

  • 52 Riverdale Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a side (west) two-storey addition, a rear second storey addition (above the existing rear one-storey addition), a third storey attic extension (for habitable space), and a rear basement walkout.

    180 m away · filed Aug 11, 2025 · Approved

  • 32 Howland Rd · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition with a deck, a side (south) third storey dormer addition, and a roof over the existing front porch.

    110 m away · filed Jul 10, 2025 · Approved

  • 99 Langley Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey addition and a rear third storey balcony (Juliet).

    20 m away · filed May 8, 2025 · Approved

  • 74 Langley Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a one-storey side (west) addition with an integral garage, partial rear additions on the second and third storeys, and an oversized driveway.

    50 m away · filed May 21, 2024 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.