Toronto address · Ward 9, Davenport
957 Dovercourt Rd
The City of Toronto has 7 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Plumbing
Plumbing - Proposed interior alterations, additions at 1st, 2nd, and 3rd floor, additions over existing two storey, patio, basement entrance & metal stairs at rear
Applied Aug 25, 2023 · completed May 15, 2025 · Permit 23 193943 PLB
- Cancelled
New house · New building - by renovation
Proposed new 4-unit building by demolition with patio, basement entrance & metal stairs at rear
Applied Aug 25, 2023 · completed Sep 8, 2025 · 3 homes added · Permit 23 193943 BLD
- Cancelled
Drains and site services
Drain - Proposed interior alterations, additions at 1st, 2nd, and 3rd floor, additions over existing two storey, patio, basement entrance & metal stairs at rear
Applied Aug 25, 2023 · completed May 15, 2025 · Permit 23 193943 DRN
- Cancelled
Heating and ventilation
HVAC - Proposed interior alterations, additions at 1st, 2nd, and 3rd floor, additions over existing two storey, patio, basement entrance & metal stairs at rear
Applied Aug 25, 2023 · completed May 15, 2025 · Permit 23 193943 HVA
- Cancelled
Plumbing
Plumbing - Proposed interior alterations, additions at 1st, 2nd, and 3rd floor, additions over existing two storey, patio, basement entrance & metal stairs at rear
Applied Aug 9, 2023 · completed Sep 1, 2023 · Permit 23 186421 PLB
- Cancelled
Heating and ventilation
HVAC - Proposed interior alterations, additions at 1st, 2nd, and 3rd floor, additions over existing two storey, patio, basement entrance & metal stairs at rear
Applied Aug 9, 2023 · completed Sep 1, 2023 · Permit 23 186421 HVA
- Cancelled
Small residential project · Multiple projects
Proposed interior alterations, additions at 1st, 2nd, and 3rd floor, additions over existing two storey, patio, basement entrance & metal stairs at rear
Applied Aug 9, 2023 · completed Sep 1, 2023 · 3 homes added · Permit 23 186421 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To alter the existing two-storey detached building (for five dwelling units) by constructing a third storey addition, a rear three-storey addition, a front third storey balcony, a rear first floor patio, rear second and third storey decks, and a fire escape staircase reaching all three floors. Also, to construct a two-storey detached house (for one dwelling unit), in the rear yard of the property.
Decision: Approved (hearing Oct 12, 2022)
Filed Jun 28, 2022 · File A0746/22TEY
What’s planned nearby
Development sites within 500 m
- Approved
- Approved
- Under review
19 storeys · 251 homes · Residential
490 m away · Site plan · Under review · filed Aug 31, 2021
Neighbours’ Committee of Adjustment files within 250 m
975 Dovercourt Rd · Minor variance
To convert the existing two-storey mixed-use building into a residential building (fourplex) by constructing a rear two-storey addition with a ground floor deck and stairs, and second and third storey balconies. Also, to construct a complete third storey addition. In addition, to construct a two-storey ancillary building to contain one garden suite. There will be a total of five residential dwelling units on this lot (four dwelling units within the main house and one dwelling unit within the ancillary building).
50 m away · filed Jan 20, 2025 · Deferred
205 Westmoreland Ave · Minor variance
To convert the existing two-and-one-half-storey semi-detached dwelling into a duplex by constructing a rear two-storey addition, a rear ground floor deck, a covered front porch with a second storey balcony. Also, to construct a new two-storey ancillary building (one car lift from a basement level and one laneway suite with a second storey balcony), in the rear yard, abutting the laneway. There will be a total of three residential dwelling units on this lot (two units within the main dwelling and one unit within the ancillary building).
110 m away · filed Apr 2, 2024 · Approved
181 Hallam St · Minor variance
To alter the existing two-storey townhouse dwelling by reconstructing and enlarging the rear one-storey addition with a rear ground floor deck and reconstructing the rear basement walkout.
190 m away · filed Jan 23, 2024 · Approved
216 Westmoreland Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear third storey addition with a rear third storey deck.
150 m away · filed Nov 16, 2023 · Approved
157 Hallam St · Minor variance
To construct a new three-storey triplex dwelling with side entrances and third storey balconies for Units A and B and a rear entrance and ground floor deck for Unit C. Also, to construct a two-storey ancillary building (two-car garage and one laneway suite) in the rear yard, abutting the laneway.
110 m away · filed Oct 21, 2022 · Approved
412 Delaware Ave · Minor variance
To convert the existing two-storey semi-detached dwelling from a triplex into a duplex by constructing a rear second storey addition and to extend the front verandah.
150 m away · filed Oct 17, 2022 · Approved
145 Westmoreland Ave · Minor variance
To construct a new two-storey ancillary building (detached garage with studio space above), in the rear yard abutting the laneway. The existing garage will be demolished.
160 m away · filed Sep 17, 2022 · Approved
322 Delaware Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a second storey rear addition.
190 m away · filed Feb 11, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.