Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

96 Bellevue Ave

The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Other

    make interior alterations, build 3rd floor dormer addition and also basement entrance

    Applied Sep 6, 2001 · issued Oct 19, 2001 · Permit 01 174699 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 309 Augusta Avenue

    6 storeys · Residential

    160 m away · Rezoning · Under review · filed Jul 22, 2026

    Under review
  • 333 College Street

    20 storeys · Residential

    210 m away · Site plan · Approved · filed Dec 23, 2025

    Approved
  • 452 Bathurst Street

    6 storeys · 49 homes · Mixed use

    300 m away · Site plan · Under review · filed Oct 15, 2021

    Under review
  • 502-508 Spadina Avenue

    9 storeys · 109 homes · Mixed use

    410 m away · Site plan · Under review · filed Apr 20, 2022

    Under review
  • MRKT

    Dundas Street West & Spadina Avenue

    450 m away · pre-construction

    Now selling

Neighbours’ Committee of Adjustment files within 250 m

  • 6 Croft St · Minor variance

    210 m away · filed Aug 25, 2026 · Postponed

  • 423 College St · Minor variance

    To permit the existing entertainment place of assembly (nightclub) use within the two-storey attached building.

    220 m away · filed Apr 1, 2026 · Approved

  • 280 Augusta Ave · Minor variance

    To permit the partial conversion of the ground floor garages into amenity and storage space, which will reduce the number of on-site parking spaces from 8 spaces to 3 spaces.

    130 m away · filed Mar 5, 2026 · Approved

  • 81 Lippincott St · Minor variance

    To alter the existing two-storey townhouse by constructing a rear two-storey addition and a rear ground floor deck with stairs. Also, interior alterations to construct a new dwelling unit in the basement of the townhouse. There will be a total of two dwelling units on this lot (one dwelling unit occupying the first and second storeys, and one dwelling unit occupying the basement level).

    220 m away · filed Oct 14, 2025 · Approved

  • 14 Lippincott St · Minor variance

    To construct a new three-storey detached dwelling with front and rear basement walkouts with stairs, a front porch with stairs, a rear ground floor deck with stairs, and second and third floor rear balconies. This current application is necessitated to correctly identify Variance No.1 below, from the approved Minor Variance Decision A0435/25TEY.

    180 m away · filed Aug 29, 2025 · Approved

  • 465 Bathurst St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition (including a third storey rooftop terrace above) and a rear ground level deck. Also, to construct a new one-storey detached ancillary building (one-car garage), abutting the laneway.

    220 m away · filed Aug 12, 2025 · Approved

  • 230 Augusta Ave · Minor variance

    180 m away · filed Jun 30, 2025 · Postponed

  • 14 Lippincott St · Minor variance

    To construct a new three-storey detached dwelling with front and rear basement walkouts with stairs, a front porch with stairs, a rear ground floor deck with stairs, and second and third floor rear balconies.

    180 m away · filed Jun 10, 2025 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.