Toronto address · Ward 9, Davenport
980 Bloor St W
The City of Toronto has 12 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
New building
A201 (ground floor) - 2-hr fire rated enclosures added at the west and east exit vestibule/corridor ceilings to all mechanical and electrical that do not serve the exit corridor. A209 (9th floor) - Unit 903 revised layout (changed from a 3-bedroom unit to 2-bedrooms unit). A212 (MPH) - 2-hr fire rated enclosure added to the MPH stair A ceiling to all mechanical and electrical. A208 (8th floor) - Unit 801 revised layout to 3-bedroom unit to comply with zoning.Proposal for new construction of a 12-storey mixed-use building over 2-levels of underground parking.
Applied Jan 9, 2026 · issued Feb 11, 2026 · completed Jul 3, 2026 · Permit 23 126556 BLD (revision 01)
- Closed
Partial permit · Partial permit - structural framing
Part Permit - Proposal for new construction of a 12-storey mixed-use building over 2-levels of underground parking.
Applied Jul 12, 2024 · issued Nov 13, 2024 · completed Nov 25, 2024 · Permit 23 126556 STR
- Cancelled
Partial permit · Partial permit - foundation
Part Permit - Proposal for new construction of a 12-storey mixed-use building over 2-levels of underground parking.
Applied Mar 20, 2024 · completed Nov 13, 2024 · Permit 23 126556 FND
- Closed
Drains and site services
Drain - Proposal for new construction of a 12-storey mixed-use building over 2-levels of underground parking.
Applied Mar 1, 2024 · issued Apr 22, 2024 · completed May 26, 2026 · Permit 23 126556 DRN
- Cancelled
Drains and site services · Inside and outside drains
Drain - Proposal for new construction of a 12-storey mixed-use building over 2-levels of underground parking.
Applied Jan 15, 2024 · completed Dec 18, 2024 · Permit 23 126556 STS
- Superseded
Partial permit · Partial permit - shoring
Part Permit - Proposal for new construction of a 12-storey mixed-use building over 2-levels of underground parking.
Applied Jun 19, 2023 · completed Apr 19, 2024 · Permit 23 126556 SHO
- Closed
Demolition
Demolition of existing 3-storey buildings to facilitate new construction.
Applied Jun 1, 2023 · issued Nov 28, 2023 · completed Feb 7, 2024 · 8 homes removed · Permit 23 154356 DEM
- Cancelled
Development charges deferral
Deferred Fees from folder 23 126556 (RSN-5245526) ZoningProcess RSN 72453443
Applied May 11, 2023 · completed Oct 31, 2023 · Permit 23 126556 BLD
- Closed
Plumbing
Plumbing - Proposal for new construction of a 12-storey mixed-use building over 2-levels of underground parking.
Applied May 2, 2023 · issued Dec 17, 2024 · completed May 26, 2026 · Permit 23 126556 PLB
- Closed
Heating and ventilation
HVAC - Proposal for new construction of a 12-storey mixed-use building over 2-levels of underground parking.
Applied Mar 27, 2023 · issued Dec 17, 2024 · completed May 29, 2026 · Permit 23 126556 HVA
- Closed
New building
Proposal for new construction of a 12-storey mixed-use building over 2-levels of underground parking.
Applied Mar 24, 2023 · issued Nov 25, 2024 · completed Jul 3, 2026 · 116 homes added · Permit 23 126556 BLD
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposal to install back flow prevention device into existing bakery.
Applied Jan 5, 2015 · issued Jan 7, 2015 · completed Oct 22, 2020 · Permit 15 100666 PSA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the development standards for a mixed-use building (as approved under Site Specific Zoning By-law 604-2022 ), by increasing the overall building height, density, and number of storeys from 11 to 13 storeys. Also, to reduce the development standards for required amenity space from 468 m2 to 453 m2, to reduce the required number of resident parking spaces from 52 to 42, and to alter the required dimensions of bicycle parking spaces.
Decision: Approved (hearing Mar 27, 2024)
Filed Jan 15, 2024 · File A0044/24TEY
What’s planned nearby
Development sites within 500 m
- Approved
Neighbours’ Committee of Adjustment files within 250 m
800 Dovercourt Rd · Consent
To obtain consent for the technical severance of the property for the purpose of re-establishing two residential lots which merged on title.
180 m away · filed Jul 13, 2026 · Hearing scheduled
388 Rusholme Rd · Minor variance
To construct a new four-storey detached building (houseplex) with front and rear covered porches with stairs, front and rear basement walkouts, two side (south) covered entrances with stairs, front and rear second and third storey balconies, and front and rear fourth storey terraces (on the third storey roof). Also, to construct a new rear two-storey detached ancillary building (containing one garden suite, cantilevered at the east and west sides of the building). There will be two parking spaces in the rear yard. There will be a total of seven residential dwelling units on this lot (six dwel…
170 m away · filed Mar 31, 2026 · Approved
386 Rusholme Rd · Minor variance
To construct a new four-storey detached building (houseplex) with front and rear covered porches with stairs, front and rear basement walkouts, two side (north) covered entrances with stairs, front and rear second and third storey balconies, and front and rear fourth storey terraces (on the third storey roof). Also, to construct a new rear two-storey detached ancillary building (containing one garden suite, cantilevered at the east and west sides of the building). There will be two parking spaces in the rear yard. There will be a total of seven residential dwelling units on this lot (six dwel…
180 m away · filed Mar 19, 2026 · Approved
942 Bloor St W · Minor variance
To construct a new three-storey mixed-use building (the foundation of the existing building will be maintained), with eight third storey side (west) juliet balconies. There will be three commercial units that will occupy the ground floor and basement, and four residential dwelling units that will occupy the second and third storeys of the building on the lot.
150 m away · filed Dec 1, 2025 · Approved
225 Delaware Ave · Minor variance
To convert the existing four-storey detached dwelling from a fourplex into a six unit apartment building by constructing a front and a rear fourth storey addition with balconies, and two enclosed rooftop stair access structures leading to private rooftop terraces, along with interior alterations. The existing rear ancillary building (garden suite) will be maintained and unaltered. There will be a total of seven residential dwelling units on this lot (six units within the main apartment building and one unit within the ancillary building).
180 m away · filed Jun 12, 2025 · Deferred
238 Delaware Ave · Minor variance
To construct a new one-storey ancillary building (detached garage) in the rear yard of the property, abutting the private laneway.
190 m away · filed May 13, 2025 · Approved
681 Dovercourt Rd · Minor variance
To alter the existing one-storey ancillary building (detached garage abutting the laneway), in the rear yard of the existing three-storey detached dwelling (fourplex currently under construction), by constructing a complete second storey addition for the purpose of one laneway suite. There will be a total of five residential dwelling units on this lot (one unit within the ancillary building and four units within the main dwelling).
220 m away · filed Oct 11, 2024 · Approved
172 Delaware Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing one and two-storey front additions and a rear one-storey addition. The existing front walkout stairs, and the rear ground level raised wood deck will be demolished. There will be a total of three dwelling units (triplex) on this lot. The existing one-storey ancillary building (detached garage) will be maintained and unaltered.
180 m away · filed Nov 16, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.