Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

995 Lansdowne Ave

The City of Toronto has 7 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC Revision - Proposal for multiple projects to an existing 2 1/2 storey artist's studio building. Scope of work includes 4 storey rear addition, 3rd amd 4th floor additions and interior alterations to convert to 8 residential units.

    Applied Sep 12, 2016 · issued Oct 3, 2016 · completed Mar 29, 2017 · Permit 14 268627 HVA (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal for multiple projects to an existing 2 1/2 storey artist's studio building. Scope of work includes 4 storey rear addition, 3rd amd 4th floor additions and interior alterations to convert to 8 residential units.

    Applied Dec 30, 2014 · issued Feb 25, 2016 · completed Mar 29, 2017 · Permit 14 268627 HVA

    Closed
  • Addition or alteration · Multiple projects

    Proposal for multiple projects to an existing building. Scope of work includes 4 storey rear addition, 3rd and 4th floor additions and interior alterations to convert to 8 residential units.

    Applied Dec 30, 2014 · issued Feb 25, 2016 · completed Feb 13, 2017 · 7 homes added · Permit 14 268627 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for multiple projects to an existing 2 1/2 storey artist's studio building. Scope of work includes 4 storey rear addition, 3rd amd 4th floor additions and interior alterations to convert to 8 residential units.

    Applied Dec 30, 2014 · issued Feb 25, 2016 · completed Mar 28, 2017 · Permit 14 268627 PLB

    Closed
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposed conversion of residential dwelling to artist studios (eight units) with storage in basement from an existing 2 storey SFD. Proposal includes interior alterations, basement underpinning, front and rear basement walkout, front and rear decks, two storey addition over existing, four storey rear addition, exterior stair and fire alram system. Sprinlker and standpipe systems under file 12-157586,

    Applied May 1, 2012 · completed Feb 6, 2018 · Permit 12 131883 FSU

    Cancelled
  • Demolition

    Proposal to remove single family residential dwelling USE from existing two-storey building (155.8m2). See related building permit file 12-131883.

    Applied Apr 4, 2012 · completed Aug 13, 2019 · Permit 12 149348 DEM

    Cancelled
  • Addition or alteration · Multiple projects

    Proposed conversion of residential dwelling to artist studios (eight units) with storage in basement from an existing 2 storey SFD. Proposal includes interior alterations, basement underpinning, front and rear basement walkout, front and rear decks, two storey addition over existing, four storey rear addition, exterior stair and fire alram system. Sprinlker and standpipe systems under file 12-157586,

    Applied Mar 5, 2012 · issued May 30, 2012 · completed Feb 13, 2017 · Permit 12 131883 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 71 Ward St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition (including a basement extension below) with access stairs. The existing side (south) basement walkout and ground floor deck with stairs will be demolished.

    230 m away · filed Jun 11, 2026 · Approved

  • 656 St Clarens Ave · Minor variance

    To legalize and to maintain the conversion of the existing two-storey mixed-use building into a houseplex, without an authorized building permit. There is a total of five residential dwelling units on this lot.

    190 m away · filed Nov 14, 2025 · Approved

  • 227 Emerson Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition (above the existing one-storey portion of the dwelling).

    190 m away · filed May 1, 2025 · Approved

  • 730 St Clarens Ave · Minor variance

    To permit three additional residential dwelling units (which were constructed without an authorized building permit) within the existing 17-storey apartment building (municipally known as 730 St. Clarens Avenue (East Tower)).

    110 m away · filed Oct 11, 2024 · Approved

  • 1341 Dupont St · Minor variance

    To permit the existing rear second storey deck (above the one-storey portion) of the two-storey semi-detached dwelling.

    100 m away · filed Aug 19, 2024 · Postponed

  • 233 Emerson Ave · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a front basement walkout, and a front covered porch.

    190 m away · filed Jun 5, 2023 · Approved

  • 900 Lansdowne Ave · Minor variance

    To reduce the width and length of 28 parking spaces provided for small vehicles. There will be a total of 827 parking spaces provided on-site.

    240 m away · filed Jan 25, 2023 · Approved

  • 749 St Clarens Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition with a ground floor deck, and a rear second and third storey addition with a third storey terrace.

    90 m away · filed Sep 12, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.