Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 15, Don Valley West

10 Parkhurst Blvd

The City of Toronto has 3 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal for new 2 storey rear addition, new third floor, new roof assembly, new siding where needed, new softscaping and interior alteration of existing (new floor assemblies, new HVAC, new plumbing, new electrical) and relocate the existing garage

    Applied Jan 15, 2025 · issued Jan 27, 2025 · Permit 24 230937 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Proposal for new 2 storey rear addition, new third floor, new roof assembly, new siding where needed, new softscaping and interior alteration of existing (new floor assemblies, new HVAC, new plumbing, new electrical) and relocate the existing garage

    Applied Oct 25, 2024 · issued Nov 7, 2024 · Permit 24 230937 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for new 2 storey rear addition, new third floor, new roof assembly, new siding where needed, new softscaping and interior alteration of existing (new floor assemblies, new HVAC, new plumbing, new electrical) and relocate the existing garage

    Applied Oct 25, 2024 · issued Nov 7, 2024 · Permit 24 230937 PLB

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To add rear addition and a partial 3rd floor addition to an existing detached dwelling and relocate the existing garage (The application was deferred on the hearing of 29 August 2024)

    Decision: Approved (hearing Sep 26, 2024)

    Filed Jul 19, 2024 · File A0363/24NY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 73 Fleming Cres · Minor variance

    To alter the existing two-storey detached dwelling by constructing a two-storey rear addition and a second storey addition above the existing integral garage, which is proposed to be converted into habitable space.

    120 m away · filed Aug 31, 2026 · Hearing scheduled

  • 60 Fleming Cres · Minor variance

    To alter the existing two-storey detached dwelling by converting a portion of the garage into liveable area.

    90 m away · filed Jan 23, 2026 · Approved

  • 1710 Bayview Ave · Minor variance

    To alter the previously approved 9-storey mixed-use building, which is currently under construction. The variances are being requested to allow for a 0.3 metre increase in building height, to alter the permitted location of functional building elements on the roof and to reduce the supply of visitor parking. Cross-reference City of Toronto By-law No. 1184-2022 (Ontario Land Tribunal).

    110 m away · filed Jan 6, 2025 · Approved

  • 596 Soudan Ave · Minor variance

    To construct a new three-storey detached dwelling.

    200 m away · filed Oct 4, 2024 · Approved

  • 22 Mann Ave · Minor variance

    To permit a parking pad in the front yard of the subject property. Please note this application was previously deferred Thursday, February 1, 2024.

    200 m away · filed Nov 27, 2023 · Refused

  • 37 Fleming Cres · Minor variance

    To construct a new dwelling.

    200 m away · filed Jan 11, 2023 · Approved

  • 63 Fleming Cres · Minor variance

    Proposal for a rear addition. Proposed interior expansion into existing integrated garage, single parking spot to be relocated from garage to exterior driveway parking.

    120 m away · filed Oct 20, 2022 · Approved

  • 19 Parkhurst Blvd · Minor variance

    To construct a new dwelling.

    80 m away · filed Oct 19, 2022 · Approved

Everything planned in Don Valley West

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.