Toronto address · Ward 3, Etobicoke-Lakeshore
10 Queen Elizabeth Blvd
The City of Toronto has 8 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing · Backflow prevention devices (Water only)
Replacement of existing 3/4" backflow preventor device to existing building
Applied Apr 20, 2021 · issued May 31, 2021 · completed Sep 29, 2021 · Permit 21 143475 PSA
- Cancelled
Addition or alteration · Interior alterations
FILE BY PICK UP AREA..................ldTo install new Racking System to an existing warehouse for a Vifloor Canada Ltd.
Applied Sep 22, 2015 · completed May 8, 2020 · Permit 15 226637 BLD
- Closed
Plumbing
Revision 01: revision to water meter layoutPlumbing - Demolition of all interior partitions and modification of the exterior walls, plus raising of the existing roof on the existing industrial building.
Applied Jun 10, 2015 · issued Jul 8, 2015 · completed Sep 13, 2021 · Permit 14 175517 PLB (revision 01)
- Closed
Plumbing
Plumbing - Interior alterations to an existing Office/Warehouse Industrial Building.
Applied Mar 19, 2015 · issued May 15, 2015 · completed Sep 13, 2021 · Permit 15 129552 PLB
- Closed
Heating and ventilation
HVAC - Interior alterations to an existing Office/Warehouse Industrial Building.
Applied Mar 19, 2015 · issued May 15, 2015 · completed Sep 14, 2021 · Permit 15 129552 HVA
- Closed
Heating and ventilation
HVAC - Demolition of all interior partitions and modification of the exterior walls, plus raising of the existing roof on the existing industrial building.
Applied Jun 17, 2014 · issued Oct 16, 2014 · completed Sep 14, 2021 · Permit 14 175517 HVA
- Closed
Plumbing
Plumbing - Demolition of all interior partitions and modification of the exterior walls, plus raising of the existing roof on the existing industrial building.
Applied Jun 17, 2014 · issued Oct 16, 2014 · completed Sep 13, 2021 · Permit 14 175517 PLB
- Closed
Drains and site services · Inside and outside drains
Drain - Demolition of all interior partitions and modification of the exterior walls, plus raising of the existing roof on the existing industrial building.
Applied Jun 17, 2014 · issued Oct 16, 2014 · completed Sep 13, 2021 · Permit 14 175517 STS
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
506-522 Royal York Road, 2-10 Queen Elizabeth Boulevard and 3-15 Sinclair Street
Mixed use
40 m away · Rezoning · Under appeal · filed May 10, 2022
- Under review
12 storeys · Residential
240 m away · Site plan · Under review · filed Dec 18, 2025
- Under review
8 storeys · 54 homes · Mixed use
370 m away · Site plan · Under review · filed Mar 3, 2023
- Under review
8 storeys · 26 homes · Mixed use
390 m away · Site plan · Under review · filed Mar 6, 2023
- Approved
9 storeys · 200 homes · Mixed use
430 m away · Condominium · Approved · filed Jan 12, 2024
Neighbours’ Committee of Adjustment files within 250 m
530 Royal York Rd · Minor variance
To construct a third floor addition and a three-storey rear addition to accommodate a proposed fourplex.
140 m away · filed Jul 31, 2024 · Tentatively scheduled
35 Dayton Ave · Minor variance
To maintain the existing enclosed front porch.
130 m away · filed Oct 12, 2022 · Approved
544 Royal York Rd · Minor variance
To construct a two storey rear addition, second storey side addition, and to construct a second secondary suite.
190 m away · filed Oct 11, 2022 · Approved
35 Dayton Ave · Minor variance
To maintain the existing enclosed front porch.
130 m away · filed May 6, 2022 · Application withdrawn
759 Oxford St · Minor variance
To construct a detached dwelling.
220 m away · filed Nov 22, 2019 · Approved
22 Distin Ave · Minor variance
To construct a new detached dwelling with an attached garage.
250 m away · filed Mar 5, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.