Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

105 Thompson Ave

The City of Toronto has 6 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Accessory Building(s)

    Proposed Gazebo at rear of property 18.21m²

    Applied Aug 18, 2026 · completed Aug 21, 2026 · Permit 26 221461 BLD

    Cancelled
  • Drains and site services · Back water valve (Sewer only)

    Proposal to install a back water valve

    Applied May 14, 2018 · issued May 14, 2018 · completed Feb 28, 2020 · Permit 18 158121 DRN

    Closed
  • Plumbing

    REVISION - to add extra fixturesPlumbing - Proposed 2 storey addition and small 1 storey addition plus rebuild exterior walls of existing partial second storey to create a full second storey, new concrete porch.

    Applied Oct 15, 2015 · issued Oct 21, 2015 · Permit 15 164072 PLB (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposed 2 storey addition and small 1 storey addition plus rebuild exterior walls of existing partial second storey to create a full second storey, new concrete porch.

    Applied Oct 5, 2015 · issued Oct 22, 2015 · Permit 15 164072 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Proposed 2 storey addition and small 1 storey addition plus rebuild exterior walls of existing partial second storey to create a full second storey, new concrete porch.

    Applied May 27, 2015 · issued Jun 11, 2015 · Permit 15 164072 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposed 2 storey addition and small 1 storey addition plus rebuild exterior walls of existing partial second storey to create a full second storey, new concrete porch.

    Applied May 27, 2015 · issued Jun 11, 2015 · Permit 15 164072 PLB

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 74 Brentwood Rd S · Minor variance

    To construct a new rear deck with a second storey addition above.

    230 m away · filed Apr 20, 2026 · Approved

  • 32 Orchard Cres · Minor variance

    To convert the existing attached garage into habitable space.

    60 m away · filed Apr 17, 2026 · Approved

  • 95 Thompson Ave · Minor variance

    To construct a second storey addition above the existing dwelling and a new one-storey front addition.

    100 m away · filed Sep 16, 2025 · Approved

  • 118 Thompson Ave · Minor variance

    To convert the basement into a second unit and to construct a new covered front porch and a rear yard deck.

    130 m away · filed Jul 14, 2025 · Approved

  • 142 Thompson Ave · Minor variance

    To construct a second storey addition above the existing dwelling, a new covered front platform, and a new deck in the rear yard.

    230 m away · filed Jul 11, 2025 · Approved

  • 137 Thompson Ave · Minor variance

    To construct a one-storey east side addition above the existing attached garage and a covered deck in the rear yard.

    170 m away · filed Apr 15, 2025 · Approved

  • 50 Orchard Cres · Minor variance

    To construct a new detached dwelling with an attached garage, a rear covered deck, and an in ground pool and cabana in the rear yard.

    160 m away · filed Jan 17, 2025 · Approved

  • 1 Orchard Cres · Minor variance

    To construct a new detached dwelling with an attached garage.

    160 m away · filed Oct 9, 2024 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.