Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

108 Brooklyn Ave

The City of Toronto has 6 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Permit for interior alterations to ground floor.

    Applied Oct 16, 2015 · issued Oct 21, 2015 · completed Apr 15, 2019 · Permit 15 178510 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to underpin the basement of the existing single family dwelling.

    Applied Oct 16, 2015 · issued Nov 6, 2015 · completed Apr 15, 2019 · Permit 15 238664 PLB

    Closed
  • Small residential project · Underpinning

    Proposal to underpin the basement of the existing single family dwelling.

    Applied Oct 16, 2015 · issued Nov 6, 2015 · completed Apr 15, 2019 · Permit 15 238664 BLD

    Closed
  • Drains and site services

    Drain - Proposal to underpin the basement of the existing single family dwelling.

    Applied Oct 16, 2015 · issued Nov 6, 2015 · completed Apr 15, 2019 · Permit 15 238664 DRN

    Closed
  • Plumbing

    Plumbing - Permit for interior alterations to ground floor.

    Applied Jun 22, 2015 · issued Jun 30, 2015 · completed Apr 16, 2019 · Permit 15 178510 PLB

    Closed
  • Small residential project · Interior alterations

    Permit for interior alterations to ground floor.

    Applied Jun 22, 2015 · issued Jun 30, 2015 · completed Apr 15, 2019 · Permit 15 178510 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 27 Brooklyn Ave · Minor variance

    190 m away · filed Aug 21, 2026 · Postponed

  • 12 Audley Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a rear ground floor addition and a rear deck with stairs.

    110 m away · filed Jun 17, 2026 · Approved

  • 64 Brooklyn Ave · Minor variance

    To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).

    90 m away · filed Apr 23, 2026 · Approved

  • 188 Pape Ave · Minor variance

    To construct a new one-storey detached ancillary building (containing a two-car garage), in the rear yard, abutting the laneway.

    160 m away · filed Mar 2, 2026 · Approved

  • 137 Boston Ave · Minor variance

    To construct a two-storey ancillary building (one-car garage and elevator on the main level, and one laneway suite on the second level), in the rear yard, abutting the laneway.

    230 m away · filed Jul 17, 2025 · Approved

  • 188 Pape Ave · Minor variance

    To alter the existing two-storey detached dwelling by reconstructing a side (south) basement walkout, and to construct a rear two-storey addition with basement (replaces the existing one-storey). There will be a total of two residential dwelling units on the lot (one unit occupying the main dwelling and one unit occupying the laneway suite proposed as of right/not part of this application). The existing rear detached garage will be demolished.

    160 m away · filed Jun 5, 2025 · Approved

  • 75 Badgerow Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch with stairs.

    200 m away · filed May 27, 2025 · Approved

  • 14 Blong Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.

    140 m away · filed Apr 22, 2025 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.