Toronto address · Ward 14, Toronto-Danforth
11 Brighton Ave
The City of Toronto has 5 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install a backwater valve on the sanitary line in existing SFD-detached dwelling.
Applied Nov 6, 2019 · issued Nov 6, 2019 · completed Nov 11, 2019 · Permit 19 245826 DRN
- Inspections under way
Small residential project · Solar domestic hot water (Res)
Installation of 2 solar collectors in the rear yard (accessory building) for solar hot water heating system. Refer to related plumbing application for connection to potable water heating system.
Applied Aug 4, 2009 · issued Nov 18, 2009 · Permit 09 153159 BLD
- Inspections under way
Plumbing
Plumbing - plumbing application for connection to potable water heating system for 2 solar collector panels to be ground mounted in the rear yard of the existing dwelling
Applied Aug 4, 2009 · issued Nov 18, 2009 · Permit 09 153159 PLB
- Closed
Plumbing · Fixtures/Roof Drains: SFD
Plumbing - Install fixtures - 1 new w.c., 1 new w.b. on 1st floor at rear.(NO PLANS)Cost included in BP01-196378-bld(990)
Applied Nov 20, 2001 · issued Nov 20, 2001 · completed Feb 23, 2026 · Permit 01 196378 PLB
- Closed
Small residential project · Addition(s)
Construct one storey rear addition.
Applied Nov 20, 2001 · issued Nov 20, 2001 · completed Feb 23, 2026 · Permit 01 196378 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
9 storeys · 78 homes · Mixed use
440 m away · Site plan · Approved · filed May 3, 2023
Neighbours’ Committee of Adjustment files within 250 m
27 Brooklyn Ave · Minor variance
160 m away · filed Aug 21, 2026 · Postponed
12 Audley Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a rear ground floor addition and a rear deck with stairs.
160 m away · filed Jun 17, 2026 · Approved
64 Brooklyn Ave · Minor variance
To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).
60 m away · filed Apr 23, 2026 · Approved
188 Pape Ave · Minor variance
To construct a new one-storey detached ancillary building (containing a two-car garage), in the rear yard, abutting the laneway.
90 m away · filed Mar 2, 2026 · Approved
137 Boston Ave · Minor variance
To construct a two-storey ancillary building (one-car garage and elevator on the main level, and one laneway suite on the second level), in the rear yard, abutting the laneway.
200 m away · filed Jul 17, 2025 · Approved
188 Pape Ave · Minor variance
To alter the existing two-storey detached dwelling by reconstructing a side (south) basement walkout, and to construct a rear two-storey addition with basement (replaces the existing one-storey). There will be a total of two residential dwelling units on the lot (one unit occupying the main dwelling and one unit occupying the laneway suite proposed as of right/not part of this application). The existing rear detached garage will be demolished.
90 m away · filed Jun 5, 2025 · Approved
14 Blong Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.
50 m away · filed Apr 22, 2025 · Approved
53 Bertmount Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition.
210 m away · filed Apr 14, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.