Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

11 Eleanor Ave

The City of Toronto has 1 building permit since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Garage

    Proposal to construct new rear detached garage.

    Applied Mar 29, 2018 · issued Oct 3, 2018 · completed Jun 6, 2019 · Permit 18 136789 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a new detached garage in the rear of the property.

    Decision: Approved (hearing Aug 30, 2018)

    Filed Jul 6, 2018 · File A0502/18NY

    Approved

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 74 Amherst Ave · Minor variance

    230 m away · filed Jul 20, 2026 · Postponed

  • 44 Amherst Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a side (east) fire shutter, and a front second storey canopy covering the existing balcony.

    110 m away · filed Jul 7, 2026 · Approved

  • 636 Vaughan Rd · Minor variance

    To construct a new patio (for the existing eating establishment) in the rear yard of the existing two-storey mixed-use building. Also, to construct a canopy for the new patio in the rear yard.

    90 m away · filed Oct 21, 2025 · Postponed

  • 22 Strader Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a front one-storey addition (including a walkout basement), and a complete second floor addition with a front balcony. Also, to reconstruct the covered front porch with stairs. There will be a total of two residential dwelling units on this lot.

    240 m away · filed Jun 11, 2025 · Approved

  • 327 Robina Ave · Minor variance

    To construct a new two-storey detached dwelling with a covered front porch, an integral garage, a front second storey balcony, a rear ground floor deck with stairs, and a rear basement walkout.

    220 m away · filed Nov 18, 2024 · Approved

  • 26 Glenora Ave · Minor variance

    To alter the existing two-storey, two-unit, detached dwelling by constructing a front second storey addition as well as a rear second storey cantilevered addition. Also, to reconstruct the existing rear basement walkout stairs and front porch. The two existing residential dwelling units will be maintained (one unit within the basement and one unit occupying both first and second levels).

    190 m away · filed Aug 20, 2024 · Approved

  • 60 Belvidere Ave · Minor variance

    To construct a new two-storey detached ancillary building (garden suite), in the rear yard of a three-storey detached triplex dwelling (currently under construction).

    190 m away · filed Jan 12, 2024 · Approved

  • 31 Bansley Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front one-storey addition with a front porch, a front second storey addition with a front deck, a rear one-storey addition, and a rear second storey deck. The existing rear ground floor sunroom will be demolished.

    100 m away · filed May 12, 2023 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.