Toronto address · Ward 9, Davenport
1138 Queen St W
The City of Toronto has 12 building permits since 2017 (6 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Refusal notice
Addition or alteration · Multiple projects
REV 02: revised drawing and engineer sign off letter for referenceRevision 01: Review RequestProposal for a front addition on the second floor and interior alterations - commercial to remain on the ground floor and 2 residential units on second floor.
Applied Mar 26, 2026 · Permit 25 174642 BLD (revision 02)
- Revision issued
Addition or alteration · Multiple projects
Revision 01: Review RequestProposal for a front addition on the second floor and interior alterations - commercial to remain on the ground floor and 2 residential units on second floor.
Applied Nov 24, 2025 · issued Dec 5, 2025 · Permit 25 174642 BLD (revision 01)
- Inspections under way
Addition or alteration · Multiple projects
Proposal for a front addition on the second floor and interior alterations - commercial to remain on the ground floor and 2 residential units on second floor.
Applied Jun 10, 2025 · issued Sep 9, 2025 · Permit 25 174642 BLD
- Inspections under way
Plumbing
Plumbing - Proposal to add a front extension on the second floor and separate the second floor into two small residential units.
Applied Jun 10, 2025 · issued Sep 9, 2025 · Permit 25 174642 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposal to add a front extension on the second floor and separate the second floor into two small residential units.
Applied Jun 10, 2025 · issued Sep 9, 2025 · Permit 25 174642 HVA
- Cancelled
Plumbing
Plumbing - Add a front extension on the second floor and separte the second floor into two smaill residential units.
Applied Apr 28, 2025 · completed May 22, 2025 · Permit 25 150151 PLB
- Cancelled
Addition or alteration · Multiple projects
Add a front extension on the second floor and separate the second floor into two small residential units.
Applied Apr 28, 2025 · completed May 22, 2025 · 2 homes added · Permit 25 150151 BLD
- Cancelled
Heating and ventilation
HVAC - Add a front extension on the second floor and separte the second floor into two smaill residential units.
Applied Apr 28, 2025 · completed May 22, 2025 · Permit 25 150151 HVA
- Closed
Addition or alteration · Re-Roofing/Re-Cladding
Proposal to repair and reinforce existing roof, re-shingle as necessary
Applied Oct 4, 2019 · issued Nov 18, 2019 · completed Feb 6, 2025 · Permit 19 231963 BLD
- Revision issued
Addition or alteration · Interior alterations
Revision 01: Revision for underpinning (approx 5m).Admin party wall permit related to 18-156384 (1140-1144 Queen St W) for reinforcement and re cladding of existing party wall between 1138-1140 Queen St W - Refer to related admin permit at 1140 Queen St W
Applied Aug 29, 2018 · issued Sep 5, 2018 · Permit 18 177321 BLD (revision 01)
- Inspections under way
Addition or alteration · Interior alterations
Admin party wall permit related to 18-156384 (1140-1144 Queen St W) for reinforcement and re cladding of existing party wall between 1138-1140 Queen St W - Refer to related admin permit at 1140 Queen St W
Applied Jun 13, 2018 · issued Jun 19, 2018 · Permit 18 177321 BLD
- Closed (dormant)
Heating and ventilation · Install/Alter HVAC - only
Install kitchen exhaust system. see 00 - 333950 cost incl. 397601
Applied Sep 21, 2000 · issued Oct 11, 2000 · completed Jun 8, 2026 · Permit 00 339566 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
29 storeys · 272 homes · Mixed use
50 m away · Rezoning · Under appeal · filed Oct 3, 2023
- Under appeal
27 storeys · 367 homes · Mixed use
100 m away · Rezoning · Under appeal · filed Nov 13, 2024
- Under review
3 storeys · 2 homes · Residential
160 m away · Condominium · Under review · filed Jan 19, 2024
- Under review
6 storeys · 28 homes · Residential
250 m away · Site plan · Under review · filed Dec 10, 2021
- Under review
29 storeys · 768 homes · Mixed use
420 m away · Site plan · Under review · filed Aug 31, 2022
- Approved
27 storeys · 362 homes · Mixed use
460 m away · Site plan · Approved · filed Apr 21, 2023
Neighbours’ Committee of Adjustment files within 250 m
61 Northcote Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition with a cantilevered side (north) bay window, and a rear balcony. Also, to alter the existing rear one-storey semi-detached ancillary building (one-car garage abutting the laneway) by constructing a complete second storey addition (containing storage space).
220 m away · filed Jul 29, 2026 · Hearing scheduled
18 Beaconsfield Ave · Minor variance
To legalize and to maintain the existing rear two-storey ancillary building (containing a one-car garage, and one laneway suite), abutting the laneway. This building was constructed without an authorized building permit. There is a total of two residential dwelling units on this lot (one unit within the main building, and one unit within the ancillary building).
110 m away · filed Jul 8, 2026 · Hearing scheduled
144 Dovercourt Rd · Minor variance
To alter the existing rear two-storey ancillary building (containing two laneway suites), as approved by Minor Variance Decision Number A0641/25TEY, by constructing a second storey landing and stairs on the east side of this building. There will be a total of five residential dwelling units on this lot (three dwelling units within the main house and two dwelling units within the ancillary building).
200 m away · filed Feb 25, 2026 · Approved
11 Northcote Ave · Minor variance
To construct a new three-storey detached dwelling (fourplex), with side (south) cantilevered second and third storeys, a rear covered ground floor deck with stairs, a front second storey balcony, front third storey balcony, a rear second storey balcony, front and rear basement walkouts with patios and a side (north) basement level patio. Also, to construct a new two-storey ancillary building (containing one Laneway suite) with a rear (east) cantilevered second storey, in the rear yard abutting the laneway There will be a total of five residential dwelling units on this lot (four units within…
140 m away · filed Dec 29, 2025 · Approved
131 Dovercourt Rd · Minor variance
To construct a new rear two-storey ancillary building (containing two laneway suites), with exterior stairs and a platform providing access to the second unit, abutting the laneway. The existing one-storey detached garage will be demolished. The existing three-storey semi-detached dwelling containing four residential dwelling units is currently under construction. There will be a total of six residential dwelling units on this lot.
210 m away · filed Dec 2, 2025 · Approved
1100 Queen St W · Minor variance
To permit a place of assembly use (private art gallery) on the second floor of the existing two-storey commercial building. The existing ground floor restaurant use, as well as the retail use, will be maintained and unaltered. There will be no parking spaces provided on-site.
110 m away · filed Sep 2, 2025 · Approved
144 Dovercourt Rd · Minor variance
To alter the existing two-storey ancillary building (containing one laneway suite) by constructing one additional laneway suite, for a total of two laneway suites. There will be a total of five residential dwelling units on this lot (three dwelling units within the main house and two dwelling units within the laneway suite).
200 m away · filed Aug 19, 2025 · Approved
20 Beaconsfield Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a front one-car carport structure and to permit a new front yard parking space, abutting Beaconsfield Avenue (within the new front one-car carport structure). Also, to reduce the rear yard soft landscaping approved in Minor Variance Decision A0130/24TEY by constructing a rear ground floor deck, a rear walkway, and a hot tub in the rear yard. There will be a total of two residential dwelling units on this lot (one unit occupying the main dwelling, and one unit occupying the ancillary building containing one laneway…
120 m away · filed Aug 7, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.