Toronto address · Ward 14, Toronto-Danforth
12 Brighton Ave
The City of Toronto has 6 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
Revision01: Changes to the layout.HVAC - Construct basement underpinning and interior alterations
Applied Oct 7, 2022 · issued Oct 20, 2022 · completed Mar 9, 2023 · Permit 22 101524 HVA (revision 01)
- Closed
Small residential project · Multiple projects
Revision 01: Changes to the windows.Construct basement underpinning and interior alterations
Applied Oct 7, 2022 · issued Oct 21, 2022 · completed Mar 9, 2023 · Permit 22 101524 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Construct basement underpinning and interior alterations
Applied Apr 6, 2022 · issued Apr 13, 2022 · completed Mar 9, 2023 · Permit 22 101524 HVA
- Closed
Plumbing
Plumbing - Construct basement underpinning and interior alterations
Applied Jan 7, 2022 · issued Mar 31, 2022 · completed Mar 9, 2023 · Permit 22 101524 PLB
- Closed
Small residential project · Multiple projects
Construct basement underpinning and interior alterations
Applied Jan 7, 2022 · issued Mar 31, 2022 · completed Mar 9, 2023 · Permit 22 101524 BLD
- Closed
Drains and site services · Back water valve (Sewer only)
install a BWV in existing sfd
Applied Mar 29, 2021 · issued Mar 30, 2021 · completed Apr 4, 2023 · Permit 21 133678 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
9 storeys · 78 homes · Mixed use
480 m away · Site plan · Approved · filed May 3, 2023
Neighbours’ Committee of Adjustment files within 250 m
27 Brooklyn Ave · Minor variance
180 m away · filed Aug 21, 2026 · Postponed
12 Audley Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a rear ground floor addition and a rear deck with stairs.
120 m away · filed Jun 17, 2026 · Approved
64 Brooklyn Ave · Minor variance
To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).
80 m away · filed Apr 23, 2026 · Approved
188 Pape Ave · Minor variance
To construct a new one-storey detached ancillary building (containing a two-car garage), in the rear yard, abutting the laneway.
100 m away · filed Mar 2, 2026 · Approved
137 Boston Ave · Minor variance
To construct a two-storey ancillary building (one-car garage and elevator on the main level, and one laneway suite on the second level), in the rear yard, abutting the laneway.
190 m away · filed Jul 17, 2025 · Approved
188 Pape Ave · Minor variance
To alter the existing two-storey detached dwelling by reconstructing a side (south) basement walkout, and to construct a rear two-storey addition with basement (replaces the existing one-storey). There will be a total of two residential dwelling units on the lot (one unit occupying the main dwelling and one unit occupying the laneway suite proposed as of right/not part of this application). The existing rear detached garage will be demolished.
100 m away · filed Jun 5, 2025 · Approved
75 Badgerow Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch with stairs.
230 m away · filed May 27, 2025 · Approved
14 Blong Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.
90 m away · filed Apr 22, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.