Toronto address · Ward 3, Etobicoke-Lakeshore
122 Seventh St
The City of Toronto has 7 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Proposal for basement underpinning and renovations including plumbing and electrical rough-ins for future interior alterations/finishes.
Applied Jul 15, 2021 · issued Aug 4, 2021 · completed Apr 18, 2023 · Permit 21 184826 PLB
- Closed
Small residential project · Multiple projects
Proposal for basement underpinning and renovations including plumbing and electrical rough-ins for future interior alterations/finishes.
Applied Jul 15, 2021 · issued Aug 4, 2021 · completed Apr 18, 2023 · Permit 21 184826 BLD
- Closed
Drains and site services
Drain - Proposal for basement underpinning and renovations including plumbing and electrical rough-ins for future interior alterations/finishes.
Applied Jul 15, 2021 · issued Aug 4, 2021 · completed Apr 18, 2023 · Permit 21 184826 DRN
- Closed
Drains and site services · Back water valve (Sewer only)
Proposed installation of Back Water Valve and Sump Pump in an existing single family dwelling.
Applied Feb 12, 2020 · issued Feb 12, 2020 · completed Feb 19, 2020 · Permit 20 115036 DRN
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to ground floor, addition to second floor with a full dormer along the north side of the roof.
Applied Oct 15, 2015 · issued Nov 12, 2015 · completed Jan 22, 2019 · Permit 15 193367 HVA
- Closed
Plumbing
Plumbing - Proposal for interior alterations to ground floor, addition to second floor with a full dormer along the north side of the roof.
Applied Oct 14, 2015 · issued Oct 14, 2015 · completed Jan 22, 2019 · Permit 15 193367 PLB
- Closed
Small residential project · Multiple projects
Proposal for interior alterations to ground floor, addition to second floor with a full dormer along the north side of the roof.
Applied Jul 20, 2015 · issued Aug 25, 2015 · completed Jan 22, 2019 · Permit 15 193367 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
99 Birmingham Street and 210 Islington Avenue
26 storeys · 352 homes · Mixed use
370 m away · Rezoning · Under appeal · filed Nov 23, 2023
- Under review
4 storeys · Not stated in the file
370 m away · Site plan · Under review · filed Mar 13, 2026
Neighbours’ Committee of Adjustment files within 250 m
115 Tenth St · Minor variance
To legalize and to maintain an enclosed second storey front platform, to construct a second storey rear addition, and to convert the existing dwelling into a duplex.
230 m away · filed Oct 14, 2025 · Approved
62 Seventh St · Minor variance
To construct a new duplex with an attached garage.
240 m away · filed Apr 11, 2025 · Refused
150 Sixth St · Minor variance
To construct a new laneway house in the rear yard.
250 m away · filed Sep 18, 2024 · Approved
72 Seventh St · Minor variance
To legalize and to maintain the existing building that is currently under construction by constructing a two-storey rear addition, a one-storey rear addition and to create a secondary suite.
210 m away · filed May 29, 2024 · Approved
62 Seventh St · Minor variance
To construct a two-storey rear addition, a second storey addition above the existing dwelling and a second storey rear platform. A previous Committee of Adjustment application (A0119/23EYK) approved a variance related to floor space index.
240 m away · filed May 21, 2024 · Approved
72 Eighth St · Minor variance
To construct a new detached garage in the rear yard.
180 m away · filed Dec 21, 2023 · Approved
118 Fifth St · Minor variance
To legalize and to maintain the garden suite that is currently under construction.
190 m away · filed Dec 4, 2023 · Refused
69 Ninth St · Minor variance
To construct an ancillary structure in the rear yard which will contain a detached garage and a garden suite.
230 m away · filed May 29, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.