Toronto address · Ward 3, Etobicoke-Lakeshore

1226 Islington Ave

Islington Station

The City of Toronto has 25 building permits since 2017 (15 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Temporary structure · Other temporary tents

    Construct temporary tent (40'x100') structure on opening for future subway entrance

    Applied Jun 11, 2024 · issued Oct 11, 2024 · Permit 24 163128 TPS

    Permit issued
  • New building

    Revision 01 - Change of methodology for a portion of shoring design from lagging to secant piles.TTC's redevelopment of the Islington Bus Terminal and Subway west Entrance

    Applied Feb 22, 2024 · issued Apr 2, 2024 · Permit 22 188330 BLD (revision 01)

    Revision issued
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - TTC's redevelopment of the Islington Bus Terminal and Subway west Entrance

    Applied Jan 29, 2024 · issued Jun 24, 2026 · completed Jun 24, 2026 · Permit 22 188330 FSU

    Closed
  • Alternative solution

    To permit the use of Measure `N¿ vestibules, located on the concourse level, as protected routes to mitigatethe increased travel distance to station entrances/exits such that a maximum 4 min platform clearance timeis not exceeded due to the redevelopment of Islington Station

    Applied Dec 20, 2023 · completed Jan 15, 2024 · Permit 23 237490 ALT

    Approved
  • Partial permit · Partial permit - structural framing

    Part Permit - TTC's redevelopment of the Islington Bus Terminal and Subway west Entrance

    Applied Nov 9, 2023 · issued Nov 16, 2023 · completed Jan 31, 2024 · Permit 22 188330 STR

    Closed
  • Alternative solution

    Alternative Solution to permit sprinklering in lieu of rating the roof assembly and supporting structure of the proposed new west entrance

    Applied Apr 6, 2023 · completed Oct 18, 2023 · Permit 23 131625 ALT

    Approved
  • Alternative solution

    Omission of sprinklers serving the escalator steel truss enclosures.

    Applied Feb 6, 2023 · completed Oct 18, 2023 · Permit 23 110654 ALT

    Approved
  • Partial permit · Partial permit - foundation

    Part Permit - TTC's redevelopment of the Islington Bus Terminal and Subway west Entrance

    Applied Nov 9, 2022 · issued Nov 10, 2023 · completed Nov 16, 2023 · Permit 22 188330 FND

    Closed
  • Partial permit · Partial permit - shoring

    Part Permit - TTC's redevelopment of the Islington Bus Terminal and Subway west Entrance

    Applied Nov 3, 2022 · issued Nov 10, 2023 · completed Nov 10, 2023 · Permit 22 188330 SHO

    Closed
  • New building

    TTC's redevelopment of the Islington Bus Terminal and Subway west Entrance

    Applied Aug 9, 2022 · issued Jan 31, 2024 · Permit 22 188330 BLD

    Inspections under way
  • Drains and site services · Site service

    Site Services - TTC's redevelopment of the Islington Bus Terminal and Subway west Entrance

    Applied Aug 9, 2022 · issued Jan 31, 2024 · Permit 22 188330 STS

    Inspections under way
  • Plumbing

    Plumbing - TTC's redevelopment of the Islington Bus Terminal and Subway west Entrance

    Applied Aug 9, 2022 · issued Nov 16, 2023 · Permit 22 188330 PLB

    Inspections under way
Show 13 more permits
  • Heating and ventilation

    HVAC - TTC's redevelopment of the Islington Bus Terminal and Subway west Entrance

    Applied Aug 9, 2022 · issued Jan 31, 2024 · Permit 22 188330 HVA

    Permit issued
  • Drains and site services

    Drain - TTC's redevelopment of the Islington Bus Terminal and Subway west Entrance

    Applied Aug 9, 2022 · issued Nov 15, 2023 · Permit 22 188330 DRN

    Permit issued
  • Addition or alteration · Multiple projects

    Proposal for alterations and structural repair of the Islington Station Bus Transfer Facility Platform. Scope of work includes bus bay 6 and platforms 7-9

    Applied Dec 3, 2020 · issued Jan 7, 2021 · Permit 20 225107 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations for structural work, HVAC and life safety, ie new columns, beams and structural work, new sprinkler heads and branch piping, and new fresh air intake.

    Applied Jan 30, 2018 · issued Mar 1, 2018 · completed Aug 28, 2025 · Permit 16 120286 PLB

    Closed
  • Addition or alteration · Interior alterations

    Revision # 01 - Due to installation of supporting columns at concourse level.Proposal for interior alterations for removal of existing fare gate and installation of new Presto fare gates. TTC Islington station.

    Applied Aug 23, 2017 · issued Sep 6, 2017 · completed Mar 29, 2019 · Permit 17 209584 BLD (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations for removal of existing fare gate and installation of new Presto fare gates. TTC Islington station.

    Applied Aug 1, 2017 · issued Aug 21, 2017 · completed Mar 29, 2019 · Permit 17 209584 BLD

    Closed
  • Addition or alteration · Interior alterations

    Revision #1 - for fire protection modificationsProposal for interior alterations for structural work, HVAC and life safety, ie new columns, beams and structural work, new sprinkler heads and branch piping, and new fresh air intake.

    Applied Apr 25, 2016 · issued May 19, 2016 · Permit 16 120286 BLD (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations for structural work, HVAC and life safety, ie new columns, beams and structural work, new sprinkler heads and branch piping, and new fresh air intake.

    Applied Feb 24, 2016 · issued Mar 23, 2016 · Permit 16 120286 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Proposal for interior alterations for structural work, HVAC and life safety, ie new columns, beams and structural work, new sprinkler heads and branch piping, and new fresh air intake.

    Applied Feb 24, 2016 · issued Mar 23, 2016 · Permit 16 120286 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Interior aesthetic renovations to an existing restaurant within the subway station **CAFE on the Go**.

    Applied May 10, 2006 · issued May 16, 2006 · Permit 06 133912 BLD

    Inspections under way
  • Addition or alteration · Other

    T t c - structural revision to b-73663

    Applied Aug 15, 1995 · issued Sep 14, 1995 · completed Jun 8, 2026 · Permit 95 083540 BLD

    Closed (dormant)
  • Heating and ventilation

    Islington station-roadway rehabilitation

    Applied May 31, 1994 · issued Jul 6, 1994 · completed Jun 8, 2026 · Permit 94 083572 HVA

    Closed (dormant)
  • Addition or alteration · Other

    Islington station-roadway rehabilitation

    Applied May 31, 1994 · issued Jul 6, 1994 · completed Jun 8, 2026 · Permit 94 083572 BLD

    Closed (dormant)

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To permit a bus terminal.

    Decision: Approved (hearing Jul 14, 2022)

    Filed May 3, 2022 · File A0265/22EYK

    Closed

What’s planned nearby

Development sites within 500 m

  • 3326 Bloor Street West and 1226 Islington Avenue

    Mixed use

    20 m away · Subdivision · Under review · filed Dec 16, 2021

    Under review
  • 1243 Islington Avenue

    61 storeys · 702 homes · Residential

    70 m away · Rezoning · Approved · filed Oct 24, 2025

    Approved
  • 3411-3429 Bloor Street West

    18 storeys · Not stated in the file

    140 m away · Site plan · Approved · filed Jun 17, 2021

    Approved
  • 25 Mabelle Avenue

    49 storeys · 580 homes · Mixed use

    220 m away · Site plan · Under appeal · filed Sep 21, 2022

    Under appeal
  • 1276 Islington Avenue

    35 storeys · 375 homes · Residential

    320 m away · Site plan · Under review · filed Jan 9, 2026

    Under review
  • 12-20 Cordova Avenue

    27 storeys · 325 homes · Residential

    480 m away · Condominium · Under review · filed Oct 22, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 30 Clissold Rd · Minor variance

    To construct a new duplex with an attached garage, and a new garden suite in the rear yard.

    210 m away · filed Sep 14, 2026 · Hearing scheduled

  • 25 Mabelle Ave · Minor variance

    To modify the development standards outlined in By-law 80-2023(OLT) to accomodate a 53-storey residential building containing a total of 685 dwelling units.

    200 m away · filed Aug 12, 2026 · Approved

  • 20 Clissold Rd · Minor variance

    To permit a temporary parking pad in the front yard during the laneway closure to facilitate the development at 3429 Bloor St W.

    160 m away · filed Jun 26, 2026 · Approved

  • 1205 Islington Ave · Minor variance

    To construct a second storey addition above the existing dwelling and a two-storey rear and south side addition. The altered dwelling will contain a total of two residential units.

    230 m away · filed Jun 18, 2026 · Approved

  • 3429 Bloor St W · Minor variance

    To modify the development standards outlined in By-law 885-2021(OLT) to accomodate 31 additional dwelling units within the Senior Citizens' Retirement Home Facility. A total of 126 dwelling rooms and 59 dwelling units will be provided.

    170 m away · filed Jul 9, 2025 · Approved

  • 1201 Islington Ave · Consent

    To obtain consent to create a reciprocal easement / right-of-way for the purpose of maintenance and vehicular and pedestrian access.

    250 m away · filed Aug 15, 2024 · Approved

  • 1201 Islington Ave · Minor variance

    To construct a new detached triplex and a new detached garage with a garden suite above, in the rear yard.

    250 m away · filed Aug 15, 2024 · Approved

  • 25 Mabelle Ave · Consent

    To obtain consent to create an easement.

    200 m away · filed Mar 18, 2024 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.