25 Mabelle Ave

The City of Toronto has 14 building permits since 2017 (10 still open) and 4 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Garage Repair/Reconstruction

    Proposal for Garage Repairs including stairwells and playground construction

    Applied Aug 19, 2026 · issued Sep 24, 2026 · Permit 26 222239 BLD

    Permit issued
  • Addition or alteration · Other

    REV: Revision to Permit #22 101323 BLD 01 BA to include details regarding the overhead height restrictor.Proposal for new vehicle driveway, new entrance ramp, new retaining wall, and new concrete stair to existing 3 level underground parking garage.

    Applied Nov 17, 2025 · issued Dec 11, 2025 · Permit 22 101323 BLD (revision 02)

    Revision issued
  • Addition or alteration · Fire damage

    Structural fire damage repairs for the new window wall system and balcony at Unit 2703.

    Applied Feb 22, 2024 · issued Apr 12, 2024 · completed Sep 10, 2025 · Permit 24 117720 BLD

    Closed
  • Addition or alteration · Other

    REV 01 - Revision to Permit #22 101323 BLD 00 BA to include front entrance canopy that was to remain, however was damaged during the demolition of the remainder of the canopy. Proposal for new vehicle driveway, new entrance ramp, new retaining wall, and new concrete stair to existing 3 level underground parking garage.

    Applied Feb 6, 2024 · issued Mar 6, 2024 · Permit 22 101323 BLD (revision 01)

    Revision issued
  • Addition or alteration · Canopy w/o enclosure

    New canopy entrance

    Applied Sep 29, 2023 · completed May 29, 2024 · Permit 23 208821 BLD

    Cancelled
  • Addition or alteration · Multiple projects

    Installation of the new garage foundation wall. Construction of new required vent shafts and exit stair. Construction of new temporary garbage storage area. Modification of the garage mechanical/sprinkler systems, including installation of new sump pits. Foundation wall length: 82m. Concrete garage repairs: 95m2 each level, 285m2 total.

    Applied Aug 24, 2022 · issued Jan 30, 2023 · Permit 22 195379 BLD

    Inspections under way
  • Addition or alteration · Other

    Proposal for new vehicle driveway, new entrance ramp, new retaining wall, and new concrete stair to existing 3 level underground parking garage.

    Applied Jan 6, 2022 · issued Feb 2, 2023 · Permit 22 101323 BLD

    Inspections under way
  • Addition or alteration · Garage Repair/Reconstruction

    Localized concrete repairs to underground parking garage

    Applied Feb 27, 2021 · issued Apr 7, 2021 · Permit 21 120962 BLD

    Inspections under way
  • Addition or alteration · Garage Repair/Reconstruction

    Proposal for the replacement of the garage roof deck expansion joint seals

    Applied Jul 9, 2019 · issued Aug 8, 2019 · completed Mar 5, 2020 · Permit 19 185791 BLD

    Closed
  • Addition or alteration · Balcony/Guard repairs

    Proposal for localized repairs to the balconies

    Applied Jul 9, 2019 · issued Aug 8, 2019 · Permit 19 185800 BLD

    Inspections under way
  • Fire and security upgrade · Fire alarm

    Proposal to replace fire alarm panel and provide elevator modification features for existing apartment building.

    Applied Oct 26, 2018 · issued Dec 3, 2018 · Permit 18 248612 FSU

    Inspections under way
  • Heating and ventilation · HVAC: other group C buildings

    Chiller replacement to an existing apartment building.

    Applied Jan 13, 2012 · issued Feb 8, 2012 · Permit 12 105945 MSA

    Permit issued
Show 2 more permits
  • Addition or alteration · Balcony/Guard repairs

    Proposed balcony slab repairs and guard replacement to 416 balconies on existing apartment building.

    Applied May 27, 2010 · issued Jun 15, 2010 · completed Apr 9, 2019 · Permit 10 182928 BLD

    Closed
  • Addition or alteration · Garage Repair/Reconstruction

    Underground parking garage repairs to Apartment Builing.

    Applied Jan 25, 2002 · issued Mar 4, 2002 · Permit 02 106069 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To modify the development standards outlined in By-law 80-2023(OLT) to accomodate a 53-storey residential building containing a total of 685 dwelling units.

    Decision: Approved (hearing Sep 24, 2026)

    Filed Aug 12, 2026 · File A0261/26EYK

    Approved
  • Consent · Sever lot

    To obtain consent to create an easement.

    Decision: Approved (hearing Aug 29, 2024)

    Filed Mar 18, 2024 · File B0016/24EYK

    Approved with conditions
  • Consent · Create new Easement/ROW

    To obtain consent to create an easement/right-of-way.

    Decision: Approved (hearing Dec 12, 2023)

    Filed Nov 13, 2023 · File B0047/23EYK

    Closed
  • Consent · Sever lot

    To obtain consent to sever the lot into two properties and to create easements/rights-of-way.

    Decision: Approved (hearing May 11, 2023)

    Filed Feb 2, 2022 · File B0011/22EYK

    Closed

What’s planned nearby

Development sites within 500 m

  • 25 Mabelle Avenue

    49 storeys · 580 homes · Mixed use

    20 m away · Site plan · Under appeal · filed Sep 21, 2022

    Under appeal
  • 3326 Bloor Street West and 1226 Islington Avenue

    Mixed use

    190 m away · Subdivision · Under review · filed Dec 16, 2021

    Under review
  • 3411-3429 Bloor Street West

    18 storeys · Not stated in the file

    210 m away · Site plan · Approved · filed Jun 17, 2021

    Approved
  • 1243 Islington Avenue

    61 storeys · 702 homes · Residential

    230 m away · Rezoning · Approved · filed Oct 24, 2025

    Approved
  • 1276 Islington Avenue

    35 storeys · 375 homes · Residential

    240 m away · Site plan · Under review · filed Jan 9, 2026

    Under review
  • 12-20 Cordova Avenue

    27 storeys · 325 homes · Residential

    330 m away · Condominium · Under review · filed Oct 22, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 20 Clissold Rd · Minor variance

    To permit a temporary parking pad in the front yard during the laneway closure to facilitate the development at 3429 Bloor St W.

    240 m away · filed Jun 26, 2026 · Approved

  • 24 Mabelle Ave · Minor variance

    To permit a doctor's office within Unit 1 of the existing mixed use building.

    120 m away · filed Jan 28, 2026 · Approved

  • 3429 Bloor St W · Minor variance

    To modify the development standards outlined in By-law 885-2021(OLT) to accomodate 31 additional dwelling units within the Senior Citizens' Retirement Home Facility. A total of 126 dwelling rooms and 59 dwelling units will be provided.

    200 m away · filed Jul 9, 2025 · Approved

  • 20 Clissold Rd · Minor variance

    To permit a temporary ashphalt driveway in the front yard for a period of three years.

    240 m away · filed Mar 31, 2023 · Approved

  • 1226 Islington Ave · Minor variance

    To permit a bus terminal.

    200 m away · filed May 3, 2022 · Approved

  • 3326 Bloor St W · Minor variance

    To permit an existing temporary off-site sales office which will be used for the purposes of marketing and sales related to a proposed condominium development at 64 and 70 Cordova Avenue.

    140 m away · filed Sep 6, 2019 · Approved

  • 64 Cordova Ave · Minor variance

    To modify the gross floor area and height requirements of the site specific By-law 110-2016.

    170 m away · filed Mar 17, 2017 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.