Toronto address · Ward 4, Parkdale-High Park
14 Gwynne Ave
The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing · Backflow prevention devices (Water only)
permit for one backflow valve for existing converted dwelling
Applied Oct 14, 2009 · issued Oct 16, 2009 · Permit 09 178641 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
145 Cowan Avenue and 1304 King Street West
18 storeys · 230 homes · Residential
210 m away · Rezoning · Under appeal · filed Oct 12, 2023
- Under review
29 storeys · 768 homes · Mixed use
240 m away · Site plan · Under review · filed Aug 31, 2022
- Approved
10 storeys · 92 homes · Residential
320 m away · Site plan · Approved · filed May 26, 2025
- Under review
37 storeys · Mixed use
330 m away · Rezoning · Under review · filed Jun 12, 2026
- Approved
27 storeys · 362 homes · Mixed use
360 m away · Site plan · Approved · filed Apr 21, 2023
- Approved
Neighbours’ Committee of Adjustment files within 250 m
72 Melbourne Ave · Minor variance
To construct a new three-storey detached apartment building (fronting Cowan Avenue) with a rear rooftop deck. No vehicular or bicycle parking spaces will be provided.There will be twelve dwelling units on the lot.
230 m away · filed Dec 6, 2023 · Application withdrawn
72 Melbourne Ave · Minor variance
To alter the existing two-storey detached dwelling (a rooming house containing 6 dwelling rooms and 1 dwelling unit) by constructing a rear three-storey addition (containing 11 dwelling (studio) units). Also, to construct a one-storey ancillary structure (to contain waste storage and 5 long-term bicycle parking spaces) in the rear yard. There will be a total of 12 dwelling units and 6 dwelling rooms (for a total of 18) on this lot.
230 m away · filed Dec 6, 2023 · Approved
72 Melbourne Ave · Consent
To obtain consent to sever the property into two (2) residential lots.
230 m away · filed Nov 27, 2023 · Application withdrawn
44 Gwynne Ave · Minor variance
To alter the existing two-storey towhouse dwelling by constructing a new two-storey rear addition.
100 m away · filed Oct 13, 2022 · Approved
163 Cowan Ave · Minor variance
To alter the existing three-storey detached dwelling by replacing the existing rear one-storey addition with a larger one-storey addition and to construct a new rear deck. Also, to construct a new one-storey ancillary building (detached garage) in the rear yard.
210 m away · filed Jul 26, 2022 · Approved
15 Elm Grove Ave · Minor variance
To construct four secondary suites and to maintain one primary suite, within the existing two-and-one-half-storey detached dwelling, for a total of 5 residential units. Also, to provide three parking pads at the rear of the property, abutting the laneway.
70 m away · filed Jan 20, 2022 · Approved
118 Tyndall Ave · Minor variance
To alter the existing apartment building, containing 93 residential dwelling units, by converting one of the ground-floor locker storage rooms into two residential dwelling units, for a total of 95 residential dwelling units, and by constructing a long-term bike storage area within the basement parking level and short-term bike storage on the south side of the existing apartment building. Also, to renovate the other locker storage room in order to provide a new locker storage area.
200 m away · filed Dec 17, 2020 · Approved
7 Gwynne Ave · Minor variance
To construct a front walkout for a basement secondary suite.
60 m away · filed Jun 24, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.