Toronto address · Ward 10, Spadina-Fort York
141 Bay St
The City of Toronto has 116 building permits since 2017 (66 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Designated structure · Sign building permit related
1 roof sign as per SMP 2026 145686 ZMP 00 ZR**CIBC**
Applied Sep 14, 2026 · issued Sep 16, 2026 · Permit 26 237137 DST
- Under review
Addition or alteration · Interior alterations
Proposal for Interior Alterations on 49th and 50th floor for Tenant Occupancy
Applied Sep 10, 2026 · Permit 26 235310 BLD
- Under review
Plumbing
Plumbing - Proposal for Interior Alterations on 49th and 50th floor for Tenant Occupancy
Applied Sep 10, 2026 · Permit 26 235310 PLB
- Under review
Heating and ventilation
HVAC - Proposal for Interior Alterations on 49th and 50th floor for Tenant Occupancy
Applied Sep 10, 2026 · Permit 26 235310 HVA
- Permit issued
Plumbing
Plumbing - Proposal for interior alterations for new meeting rooms, lounge spaces, wellness room & pantry.
Applied Aug 11, 2026 · issued Sep 9, 2026 · Permit 26 217588 PLB
- Permit issued
Heating and ventilation
HVAC - Proposal for interior alterations for new meeting rooms, lounge spaces, wellness room & pantry.
Applied Aug 11, 2026 · issued Sep 9, 2026 · Permit 26 217588 HVA
- Permit issued
Addition or alteration · Interior alterations
Proposal for interior alterations for new meeting rooms, lounge spaces, wellness room & pantry.
Applied Aug 11, 2026 · issued Aug 14, 2026 · Permit 26 217588 BLD
- Cancelled
Designated structure · Sign building permit related
To erect and display one illuminated roof sign.***CIBC***
Applied Aug 10, 2026 · completed Aug 13, 2026 · Permit 26 217038 DST
- Cancelled
Designated structure · Sign building permit related
To erect and display one illuminated roof sign.***CIBC***
Applied Jul 17, 2026 · completed Jul 22, 2026 · Permit 26 204009 DST
- Approved
Alternative solution
Alternative solution for the use of a 3M Emat fire wrap product to protect a Toronto Hydro duct bank, in connection with 141 Bay Street - 20 105721 BLD 03
Applied Jul 15, 2026 · completed Jul 27, 2026 · Permit 26 202405 ALT
- Revision issued
Heating and ventilation
REV02: Proposed revision for addition of exhaust fanRevision to HVAC - 47th floor: Proposed new interior alterations to include new open work space, enclosed offices and meeting rooms, cafe stations
Applied Jul 10, 2026 · issued Jul 22, 2026 · Permit 26 100635 HVA (revision 02)
- Revision issued
Heating and ventilation
REV01: Proposed revision relocating FPTU from elevator lobby to corridor on L41-45. Addition of exhaust fanHVAC - Proposed interior alterations - New interior construction to include new open work space, enclosed offices and meeting rooms, cafe stations from level 41 to 45th. And new stair opening on level 46th. Scope of work does not alter existing building exterior skin, existing building height, existing building area, existing building exit access/ exit stairs/ exit discharge configuration or capacity. Project does not change occupancy classification and user group.
Applied Jul 10, 2026 · issued Jul 17, 2026 · Permit 25 206587 HVA (revision 01)
Show 104 more permits
- Closed
Heating and ventilation
Rev 03: proposal to revise hvac layoutsHVAC - Interior Alterations - Fit-out on floors 5 through 25 to accommodate tenant (CIBC)
Applied Jun 22, 2026 · issued Jul 6, 2026 · completed Sep 2, 2026 · Permit 24 111021 HVA (revision 03)
- Revision issued
Addition or alteration · Interior alterations
Rev 03: Revision to LEVEL 06 - EASTA new demising partition is added to the original room 0650, dividing it into rooms 0649-1 and0650,Interior Alterations - Fit-out on floors 5 through 25 to accommodate tenant (CIBC)
Applied Jun 22, 2026 · issued Jul 13, 2026 · Permit 24 111021 BLD (revision 03)
- Revision issued
Addition or alteration · Interior alterations
Revision 01 - Revision to Relocated FEVC from corridor wall 47408 to corridor wall 47405 new breakout area. FVC distance also revised. Revised tag and combined FVC& Fe to FEVC near filling 47201: Proposed new interior alterations to include new open work space, enclosed offices and meeting rooms, cafe stations
Applied Jun 4, 2026 · issued Jun 29, 2026 · Permit 26 100635 BLD (revision 01)
- Revision issued
New building
Revision: see cover letter attached
Applied Jun 3, 2026 · issued Jul 27, 2026 · Permit 20 105721 BLD (revision 03)
- Permit issued
Fire and security upgrade · Electromagnetic locks
Proposal to install six electromagnetic locks.
Applied May 12, 2026 · issued May 13, 2026 · Permit 26 159236 FSU
- Closed
Heating and ventilation
Revision 01: Proposal to revise hvacHVAC - Proposal for interior alterations over 10 floors for a new Group D office tenant (CPP) in an existing high-rise. Scope includes structural, HVAC, electrical, and plumbing work to support the new layout.
Applied May 8, 2026 · issued May 27, 2026 · completed Aug 25, 2026 · Permit 25 205668 HVA (revision 01)
- Inspections under way
Fire and security upgrade · Electromagnetic locks
Proposal for 80 electromagnetic locks on 10 floors (Floors 31-40).
Applied May 8, 2026 · issued Jun 9, 2026 · Permit 26 157193 FSU
- Cancelled
Plumbing
Revision to Relocated FEVC from corridor wall 47408 to corridor wall 47405 newr breakout area. FVC distance also revised. Revised tag and combined FVC& Fe to FEVC near filling 47201Plumbing - 47th floor: Proposed new interior alterations to include new open work space, enclosed offices and meeting rooms, cafe stations
Applied Apr 29, 2026 · issued Jun 3, 2026 · completed Jun 4, 2026 · Permit 26 100635 PLB (revision 01)
- Revision issued
Plumbing
Revision - Added general note 9 for kitch equiment clarifying hvac design assumptions and confirming no grease vapours, fumes, smoke COC's fire alarm or migrating odours will be generated. also added note 11 for detail no.2 L46 Piping detail for catering 46404Plumbing - Proposed interior alterations to include new open work space, enclosed offices and meeting rooms, and cafe stations of 46th level.
Applied Apr 29, 2026 · issued Jun 4, 2026 · Permit 25 258886 PLB (revision 01)
- Cancelled
Heating and ventilation
Revision to HVAC - 47th floor: Proposed new interior alterations to include new open work space, enclosed offices and meeting rooms, cafe stations
Applied Apr 29, 2026 · completed May 15, 2026 · Permit 26 100635 HVA (revision 01)
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alteration (Fit out for multi tenant corridor- Level 48)
Applied Apr 22, 2026 · issued Jun 8, 2026 · Permit 26 148235 BLD
- Permit issued
Heating and ventilation
HVAC - Proposal for interior alteration (Fit out for multi tenant corridor- Level 48)
Applied Apr 22, 2026 · issued Jun 8, 2026 · Permit 26 148235 HVA
- Closed
Heating and ventilation
Revision 01: Application for revision to reduce the scope of work for food and beverage area on 4th floor (in connection with permit no. 24 208250 BLD/PLB & HVA ) HVAC - Proposal for interior alterations for food and beverage area on 4th floor, Levels P1, 02 and 03 for miscellaneous use. (In connection with building application 20 105721 BLD 00 NB)
Applied Mar 17, 2026 · issued Apr 2, 2026 · completed Sep 1, 2026 · Permit 24 208250 HVA (revision 01)
- Closed
Plumbing
Revision 01: Application for revision to reduce the scope of work for food and beverage area on 4th floor (in connection with permit no. 24 208250 BLD/PLB & HVA )Plumbing - Proposal for interior alterations for food and beverage area on 4th floor, Levels P1, 02 and 03 for miscellaneous use. (In connection with building application 20 105721 BLD 00 NB)
Applied Mar 17, 2026 · issued Apr 2, 2026 · completed Jul 6, 2026 · Permit 24 208250 PLB (revision 01)
- Revision issued
Addition or alteration · Interior alterations
Revision 01: Application for revision to reduce the scope of work for food and beverage area on 4th floor (in connection with permit no. 24 208250 BLD/PLB & HVA )Proposal for interior alterations for food and beverage area on 4th floor, and certain spaces on Levels P1, 02 and 03 for miscellaneous use. (In connection with building application 20 105721 BLD 00 NB)
Applied Mar 17, 2026 · issued Apr 16, 2026 · Permit 24 208250 BLD (revision 01)
- Approved
Alternative solution
Proposed aternative solution to assign the principal entrance to the Main Entrance, in lieu of the North Portal entrance
Applied Feb 12, 2026 · completed Feb 18, 2026 · Permit 26 116763 ALT
- Permit issued
Fire and security upgrade · Electromagnetic locks
Proposal to install four (4) maglocks on 46th floor.
Applied Feb 6, 2026 · issued May 7, 2026 · Permit 26 114191 FSU
- Approved
Alternative solution
Alternative solution proposal to use a listed firewrap product in lieu of installing the standpipes in a traditional rated gypsum board shaft construction.
Applied Feb 4, 2026 · completed Feb 18, 2026 · Permit 26 112904 ALT
- Permit issued
Fire and security upgrade · Electromagnetic locks
Proposal for maglock doors on 41st floor quantity 7,42nd floor quantity 7, 43rd floor quantity 7, 44th floor quantity 8,45th floor quantity 10 and 46th floor quanity 6
Applied Jan 29, 2026 · issued May 6, 2026 · Permit 26 110328 FSU
- Inspections under way
Addition or alteration · Interior alterations
47th floor: Proposed new interior alterations to include new open work space, enclosed offices and meeting rooms, cafe stations
Applied Jan 5, 2026 · issued Feb 2, 2026 · Permit 26 100635 BLD
- Inspections under way
Plumbing
Plumbing - 47th floor: Proposed new interior alterations to include new open work space, enclosed offices and meeting rooms, cafe stations
Applied Jan 5, 2026 · issued Feb 2, 2026 · Permit 26 100635 PLB
- Inspections under way
Heating and ventilation
HVAC - 47th floor: Proposed new interior alterations to include new open work space, enclosed offices and meeting rooms, cafe stations
Applied Jan 5, 2026 · issued Feb 2, 2026 · Permit 26 100635 HVA
- Inspections under way
Heating and ventilation
HVAC - Proposal for new offices for Alamos Gold Inc.
Applied Dec 17, 2025 · issued Jan 27, 2026 · Permit 25 267333 HVA
- Inspections under way
Plumbing
Plumbing - Proposal for new offices for Alamos Gold Inc.
Applied Dec 17, 2025 · issued Jan 27, 2026 · Permit 25 267333 PLB
- Closed
Addition or alteration · Interior alterations
Proposal for new offices for Alamos Gold Inc.
Applied Dec 17, 2025 · issued Jan 27, 2026 · completed Aug 7, 2026 · Permit 25 267333 BLD
- Closed
Fire and security upgrade
FS - Sprinkler Shop Drawing - Proposed interior alterations to include new open work space, enclosed offices and meeting rooms, and cafe stations of 46th level.
Applied Dec 15, 2025 · issued Apr 27, 2026 · completed Apr 27, 2026 · Permit 25 258886 FSU
- Cancelled
Fire and security upgrade · Electromagnetic locks
Proposal to install Seventy-three (73) maglocks on Floors 31 to 40
Applied Dec 4, 2025 · completed May 4, 2026 · Permit 25 262216 FSU
- Revision issued
New building
REV 02:Revision to drawing set (see attached cover letter)Proposal to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; L02 connection to Metrolinx rail platform #3; Pedestrian bridge connections to union station and 1 Esplanade at L02 (City of Toronto Path System; Overbuild Sky park at L04)
Applied Nov 28, 2025 · issued Jan 15, 2026 · Permit 20 105721 BLD (revision 02)
- Revision issued
Heating and ventilation
REV 03:Revision to mechanical drawing set (see attached cover letter)REV 02: Revised drawing set (refer to cover letter attached).REV 01: Revised drawing set (refer to cover letter attached).HVAC - Proposal to to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; l02 connection to metrolinx rail platform #3; pedestrian bridge connections to union station and 1 esplanade at l02 (city of toronto path system; overbuild skypark at l04)
Applied Nov 28, 2025 · issued Jan 2, 2026 · Permit 20 105721 HVA (revision 03)
- Inspections under way
Heating and ventilation
HVAC - Proposed interior alterations to include new open work space, enclosed offices and meeting rooms, and cafe stations of 46th level.
Applied Nov 26, 2025 · issued Dec 31, 2025 · Permit 25 258886 HVA
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior alterations to include new open work space, enclosed offices and meeting rooms, and cafe stations of 46th level.
Applied Nov 26, 2025 · issued Dec 15, 2025 · Permit 25 258886 BLD
- Inspections under way
Plumbing
Plumbing - Proposed interior alterations to include new open work space, enclosed offices and meeting rooms, and cafe stations of 46th level.
Applied Nov 26, 2025 · issued Dec 31, 2025 · Permit 25 258886 PLB
- Approved
Alternative solution
the alternative solution proposal prepared to address the provisions of floor opening and discuss the features which are designed to protect the floor opening of the communication stair
Applied Nov 4, 2025 · completed Dec 3, 2025 · Permit 25 249066 ALT
- Inspections under way
Heating and ventilation
HVAC - Proposal for interior alterations - New stair opening within slab and new stair connecting level 46th to 47th.
Applied Nov 4, 2025 · issued Dec 3, 2025 · Permit 25 249056 HVA
- Permit issued
Addition or alteration · Interior alterations
Proposal for interior alterations - New stair opening within slab and new stair connecting level 46th to 47th.
Applied Nov 4, 2025 · issued Dec 3, 2025 · Permit 25 249056 BLD
- Revision issued
Heating and ventilation
REV 02: Revised drawing set (refer to cover letter attached).REV 01: Revised drawing set (refer to cover letter attached).HVAC - Proposal to to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; l02 connection to metrolinx rail platform #3; pedestrian bridge connections to union station and 1 esplanade at l02 (city of toronto path system; overbuild skypark at l04)
Applied Oct 14, 2025 · issued Oct 20, 2025 · Permit 20 105721 HVA (revision 02)
- Revision issued
Addition or alteration · Interior alterations
Rev 02: proposal to revise life safety plan for room 1515,1521,1522Revision 01: proposal to revise electromagnetic locking devices, means of egress and proposed turnstiles and doors.Interior Alterations - Fit-out on floors 5 through 25 to accommodate tenant (CIBC)
Applied Sep 15, 2025 · issued Sep 17, 2025 · Permit 24 111021 BLD (revision 02)
- Closed
Heating and ventilation
Rev 02: proposal to revise hvac layoutsRevision 01: Proposal to revise hvac layout HVAC - Interior Alterations - Fit-out on floors 5 through 25 to accommodate tenant (CIBC)
Applied Sep 15, 2025 · issued Oct 3, 2025 · completed Sep 2, 2026 · Permit 24 111021 HVA (revision 02)
- Closed
Fire and security upgrade
FS - Sprinkler Shop Drawing - Proposed interior alterations - New interior construction to include new open work space, enclosed offices and meeting rooms, cafe stations from level 41 to 45th. Scope of work does not alter existing building exterior skin, existing building height, existing building area, existing building exit access/ exit stairs/ exit discharge configuration or capacity. Project does not change occupancy classification and user group.
Applied Sep 2, 2025 · issued Feb 13, 2026 · completed Feb 13, 2026 · Permit 25 206587 FSU
- Inspections under way
Heating and ventilation
HVAC - Proposed interior alterations - New interior construction to include new open work space, enclosed offices and meeting rooms, cafe stations from level 41 to 45th. And new stair opening on level 46th. Scope of work does not alter existing building exterior skin, existing building height, existing building area, existing building exit access/ exit stairs/ exit discharge configuration or capacity. Project does not change occupancy classification and user group.
Applied Aug 7, 2025 · issued Sep 2, 2025 · Permit 25 206587 HVA
- Inspections under way
Plumbing
Plumbing - Proposed interior alterations - New interior construction to include new open work space, enclosed offices and meeting rooms, cafe stations from level 41 to 45th. And new stair opening on level 46th. Scope of work does not alter existing building exterior skin, existing building height, existing building area, existing building exit access/ exit stairs/ exit discharge configuration or capacity. Project does not change occupancy classification and user group.
Applied Aug 7, 2025 · issued Sep 2, 2025 · Permit 25 206587 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior alterations - New interior construction to include new open work space, enclosed offices and meeting rooms, cafe stations from level 41 to 45th. Scope of work does not alter existing building exterior skin, existing building height, existing building area, existing building exit access/ exit stairs/ exit discharge configuration or capacity. Project does not change occupancy classification and user group.
Applied Aug 7, 2025 · issued Sep 2, 2025 · Permit 25 206587 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations over 10 floors for a new Group D office tenant (CPP) in an existing high-rise. Scope includes structural, HVAC, electrical, and plumbing work to support the new layout.
Applied Aug 6, 2025 · issued Sep 10, 2025 · completed Aug 20, 2026 · Permit 25 205668 PLB
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations over 10 floors for a new Group D office tenant (CPP) in an existing high-rise. Scope includes structural, HVAC, electrical, and plumbing work to support the new layout.
Applied Aug 6, 2025 · issued Sep 10, 2025 · completed Aug 25, 2026 · Permit 25 205668 HVA
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations over 10 floors for a new Group D office tenant (CPP) in an existing high-rise. Scope includes structural, HVAC, electrical, and plumbing work to support the new layout. UNITS 3100 - 4000.
Applied Jul 30, 2025 · issued Sep 10, 2025 · Permit 25 205668 BLD
- Inspections under way
Designated structure · Sign building permit related
A proposal to erect and display 4 Wall Signs and 5 Ground Signs all displaying static copy. Already approved according to the signage master plan #19-183
Applied Jul 23, 2025 · issued Nov 6, 2025 · Permit 25 198831 DST
- Revision issued
Plumbing
REV 01: Revised drawing set (refer to cover letter attached).Plumbing - Proposal to to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; l02 connection to metrolinx rail platform #3; pedestrian bridge connections to union station and 1 esplanade at l02 (city of toronto path system; overbuild skypark at l04)
Applied Jun 6, 2025 · issued Jul 16, 2025 · Permit 20 105721 PLB (revision 01)
- Revision issued
Heating and ventilation
REV 01: Revised drawing set (refer to cover letter attached).HVAC - Proposal to to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; l02 connection to metrolinx rail platform #3; pedestrian bridge connections to union station and 1 esplanade at l02 (city of toronto path system; overbuild skypark at l04)
Applied Jun 6, 2025 · issued Jul 14, 2025 · Permit 20 105721 HVA (revision 01)
- Revision issued
New building
REV 01: Revised drawing set (refer to cover letter attached).Proposal to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; L02 connection to Metrolinx rail platform #3; Pedestrian bridge connections to union station and 1 Esplanade at L02 (City of Toronto Path System; Overbuild Sky park at L04)
Applied Jun 6, 2025 · issued Jul 23, 2025 · Permit 20 105721 BLD (revision 01)
- Inspections under way
Designated structure · Sign building permit related
7 illuminated wall signs displaying static copy that were approved as part of ZMP 19-189110Sign 9 is located on the 3rd Storey, North ElevationSign 12 and 13 are located on the 7th storey, East and South Elevations of the signs are located on the 7th storey ( South and East elevations) Signs 14, 15, 16, 17 are located on the upper level storey on North, East, South and West elevations **CIBC**
Applied Apr 8, 2025 · issued Apr 29, 2025 · Permit 25 141094 DST
- Closed
Fire and security upgrade · Electromagnetic locks
Maglock Permit on 10th floor for Tenant Fit out.
Applied Feb 5, 2025 · issued Apr 11, 2025 · completed Apr 13, 2026 · Permit 25 112887 FSU
- Inspections under way
Fire and security upgrade · Electromagnetic locks
Maglock Permit on 6th & 7th floors for Tenant Fit out.
Applied Feb 5, 2025 · issued Apr 1, 2025 · Permit 25 112877 FSU
- Inspections under way
Fire and security upgrade · Electromagnetic locks
Maglock Permit on 8th & 9th floor for Tenant Fit out.
Applied Feb 5, 2025 · issued Mar 20, 2025 · Permit 25 112884 FSU
- Closed
Fire and security upgrade · Electromagnetic locks
Maglock Permit on the 5th floor for Tenant Fit out UPS rooms only. Remainder of 5th floor excluded.
Applied Feb 5, 2025 · issued Apr 1, 2025 · completed Aug 10, 2026 · Permit 25 112862 FSU
- Closed
Fire and security upgrade · Electromagnetic locks
Maglock Permit on Floors 11, 12 & 14 for Tenant Fit out.
Applied Feb 5, 2025 · issued Apr 11, 2025 · completed Apr 13, 2026 · Permit 25 112896 FSU
- Closed
Fire and security upgrade · Electromagnetic locks
Maglock Permit on floors 15, 16 & 17 for Tenant Fit out.
Applied Feb 5, 2025 · issued Apr 2, 2025 · completed Jun 25, 2026 · Permit 25 112947 FSU
- Closed
Fire and security upgrade · Electromagnetic locks
Maglock Permit on floors 18 , 19 & 20 for Tenant Fit out.
Applied Feb 5, 2025 · issued Apr 11, 2025 · completed Jun 25, 2026 · Permit 25 112958 FSU
- Closed
Fire and security upgrade · Electromagnetic locks
Maglock Permit on floors 21, 22 & 23 for Tenant Fit out.
Applied Feb 5, 2025 · issued Apr 11, 2025 · completed Jun 25, 2026 · Permit 25 112968 FSU
- Closed
Fire and security upgrade · Electromagnetic locks
Maglock Permit on floors 24 & 25 for Tenant Fit out.
Applied Feb 5, 2025 · issued Apr 11, 2025 · completed Jun 25, 2026 · Permit 25 112974 FSU
- Approved
Alternative solution
Alternative Solution for floor openings of 18.5 m2 for the communication stairs in Group D occupancies between the 31st to 39th, floors within the building located at 141 Bay St.THE PROPOSED DESIGN OF TENANT SPACE INCLUDES CONSTRUCTION OF THREE OPEN CONVENIENCE STAIRS BETWEEN 31ST AND 33RD FLOORS; 34TH AND 36TH FLOORS; AND 37TH AND 39TH FLOORS. EACH CONVENIENCE STAIR WILL CONNECT THREE STOREYS THROUGH TWO STAIR FLIGHTS. OPENINGS ARE NOT PROPOSED AT 34TH AND 37TH FLOOR ASSEMBLIES. THE PROPOSED CONVENIENCE STAIRS CREATE THREE SEPARATE INTERCONNECTED FLOOR SPACES WITHIN THE BUILDING. THE ALTERNA…
Applied Dec 16, 2024 · completed Jan 21, 2025 · Permit 24 250883 ALT
- Closed
Addition or alteration · Interior alterations
New interconnecting stairs between the following floors 32-33, 34-35-36, 37-38-39. Scope of work includes selective demolition of existing mechanical (ducts and sprinklers) to coordinate with the new plan. Scope of work does not alter existing building exterior skin, existing building height, existing building area, existing building exit access/exit stairs/exit discharge configuration or capacity. Project does not change occupancy classification and use group.Refer to Approved # 24 250883 ALT 00 AS
Applied Dec 11, 2024 · issued Jan 22, 2025 · completed Sep 2, 2026 · Permit 24 249500 BLD
- Closed
Heating and ventilation
HVAC - New interconnecting stairs between the following floors 32-33, 34-35-36, 37-38-39. Scope of work includes selective demolition of existing mechanical (ducts and sprinklers) to coordinate with the new plan. Scope of work does not alter existing building exterior skin, existing building height, existing building area, existing building exit access/exit stairs/exit discharge configuration or capacity. Project does not change occupancy classification and use group.
Applied Dec 11, 2024 · issued Jan 22, 2025 · completed Sep 14, 2026 · Permit 24 249500 HVA
- Closed
Plumbing
Plumbing - Proposal for interior alterations for food and beverage area on 4th floor, Levels P1, 02 and 03 for miscellaneous use. (In connection with building application 20 105721 BLD 00 NB)
Applied Sep 5, 2024 · issued Oct 17, 2024 · completed Jul 6, 2026 · Permit 24 208250 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations for food and beverage area on 4th floor, and certain spaces on Levels P1, 02 and 03 for miscellaneous use. (In connection with building application 20 105721 BLD 00 NB)
Applied Sep 5, 2024 · issued Oct 17, 2024 · Permit 24 208250 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations for food and beverage area on 4th floor, Levels P1, 02 and 03 for miscellaneous use. (In connection with building application 20 105721 BLD 00 NB)
Applied Sep 5, 2024 · issued Oct 17, 2024 · completed Sep 1, 2026 · Permit 24 208250 HVA
- Closed
Plumbing
Plumbing - Interior tenant alterations of level 2 & 3 fitness centre (to include multipurpose studios, open workout area. office, locker rooms, showers),
Applied Aug 12, 2024 · issued Oct 17, 2024 · completed Apr 27, 2026 · Permit 24 196778 PLB
- Closed
Addition or alteration · Interior alterations
Interior tenant alterations of level 2 & 3 fitness centre (to include multipurpose studios, open workout area. office, locker rooms, showers),
Applied Aug 12, 2024 · issued Oct 17, 2024 · completed Apr 23, 2026 · Permit 24 196778 BLD
- Closed
Heating and ventilation
HVAC - Interior tenant alterations of level 2 & 3 fitness centre (to include multipurpose studios, open workout area. office, locker rooms, showers),
Applied Aug 12, 2024 · issued Apr 16, 2025 · completed May 8, 2026 · Permit 24 196778 HVA
- Inspections under way
Fire and security upgrade · Electromagnetic locks
Proposal to install 12 mag locks located in Podium East/West (Levels 1, 2, 4 and 5) and High Rise Overrun Tower (Level 51).
Applied Jul 16, 2024 · issued Sep 26, 2024 · Permit 24 181261 FSU
- Closed
Heating and ventilation
Revision 01: Proposal to revise hvac layout HVAC - Interior Alterations - Fit-out on floors 5 through 25 to accommodate tenant (CIBC)
Applied Jun 13, 2024 · issued Jul 12, 2024 · completed Sep 2, 2026 · Permit 24 111021 HVA (revision 01)
- Revision issued
Plumbing
Proposal to revise plumbing layout.Plumbing - Interior Alterations - Fit-out on floors 5 through 25 to accommodate tenant (CIBC)
Applied Jun 13, 2024 · issued Jul 12, 2024 · Permit 24 111021 PLB (revision 01)
- Revision issued
Addition or alteration · Interior alterations
Revision 01: proposal to revise electromagnetic locking devices, means of egress and proposed turnstiles and doors.Interior Alterations - Fit-out on floors 5 through 25 to accommodate tenant (CIBC)
Applied Jun 13, 2024 · issued Jul 3, 2024 · Permit 24 111021 BLD (revision 01)
- Closed
Heating and ventilation
Hvac - proposal to construct interior alterations - fit-out on floors p1 and p2 to accommodate tenant (cibc)
Applied May 17, 2024 · issued Jun 7, 2024 · completed Mar 11, 2026 · Permit 24 150570 HVA
- Closed
Addition or alteration · Interior alterations
Proposal to construct interior alterations - fit-out on floors p1 and p2 to accommodate tenant (cibc)
Applied May 17, 2024 · issued May 31, 2024 · completed Apr 7, 2026 · Permit 24 150570 BLD
- Closed
Plumbing
Plumbing - PROPOSAL TO CONSTRUCT INTERIOR ALTERATIONS - FIT-OUT ON FLOORS P1 AND P2 TO ACCOMMODATE TENANT (CIBC)
Applied May 17, 2024 · issued Jun 7, 2024 · completed Mar 20, 2026 · Permit 24 150570 PLB
- Approved
Alternative solution
Alternative Solution (Interconnected Floor Space - flor openings exceeeding 10 SM - 3.2.8.1.(5)) - related to 24 111021 BLD 00 BA - Fit-out on floors 5 through 25 to accommodate tenant (CIBC)
Applied Feb 15, 2024 · completed Feb 22, 2024 · Permit 24 115828 ALT
- Approved
Alternative solution
Alternative Solution (Automatic Turnstiles) related to 24 111021 BLD 00BA - Fit-out on floors 5 through 25 to accommodate tenant (CIBC)
Applied Feb 15, 2024 · completed Feb 23, 2024 · Permit 24 115839 ALT
- Closed
Heating and ventilation
HVAC - Interior Alterations - Fit-out on floors 5 through 25 to accommodate tenant (CIBC)
Applied Feb 2, 2024 · issued Mar 13, 2024 · completed Sep 2, 2026 · Permit 24 111021 HVA
- Inspections under way
Addition or alteration · Interior alterations
Interior Alterations - Fit-out on floors 5 through 25 to accommodate tenant (CIBC)
Applied Feb 2, 2024 · issued Mar 5, 2024 · Permit 24 111021 BLD
- Inspections under way
Plumbing
Plumbing - Interior Alterations - Fit-out on floors 5 through 25 to accommodate tenant (CIBC)
Applied Feb 2, 2024 · issued Mar 13, 2024 · Permit 24 111021 PLB
- Closed
Partial permit · Partial permit - structural framing
REVISION - to include claddingPart Permit - Proposal to to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; l02 connection to metrolinx rail platform #3; pedestrian bridge connections to union station and 1 esplanade at l02 (city of toronto path system; overbuild skypark at l04)
Applied Oct 3, 2023 · issued Oct 27, 2023 · completed Aug 2, 2024 · Permit 20 105721 STR (revision 01)
- Closed
Fire and security upgrade
FS - Sprinkler Shop Drawing - Proposal to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; L02 connection to Metrolinx rail platform #3; Pedestrian bridge connections to union station and 1 Esplanade at L02 (City of Toronto Path System; Overbuild Sky park at L04)
Applied Jul 7, 2023 · completed Dec 16, 2025 · Permit 20 105721 FSU
- Approved
Alternative solution
It is proposed to install five (5) sets of turnstiles on level 1 and five (5) sets of turnstiles on level 4 of the building at 141 Bay Street. Turnstiles are located at the entrances to the passenger elevator banks only. Each set of turnstiles includes will include the SLIMLANE 950 model. The SLIMLANE 950 model has clear opening width of 950 mm. The automatic turnstiles are optical portal gates designated SlimLane SLIM950 produced by Automatic Systems America Inc. 141 Bay Street intends to use the SlimLane Optical Portals to provide secure access capabilities to the building office floors.
Applied May 31, 2023 · completed Oct 25, 2023 · Permit 23 153616 ALT
- Closed
Partial permit · Partial permit - structural framing
Part Permit - Alterations to construct a new pedestrian bridge across Bay Street connecting 141 Bay Street Office to 65 Front Street (Union Bridge) ( see also Permit No. 22-214132 )
Applied May 10, 2023 · issued Oct 5, 2023 · completed Dec 12, 2023 · Permit 22 214102 STR
- Cancelled
Partial permit · Partial permit - structural framing
Part Permit - Alterations to construct a new pedestrian bridge across Bay Street connecting 141 Bay Street Office to to 1 The Esplanade
Applied May 10, 2023 · completed Jul 24, 2024 · Permit 22 214165 STR
- Approved
Alternative solution
Alternative Solution Proposal for the installation of grease interceptor equipment as per the attached worksheet and report.
Applied May 1, 2023 · completed Aug 10, 2023 · Permit 23 139951 ALT
- Closed
Addition or alteration · Addition(s)
Alterations to construct a new pedestrian bridge across Bay Street connecting 141 Bay Street Office to to 1 The Esplanade
Applied Oct 6, 2022 · issued Jul 24, 2024 · completed Aug 5, 2026 · Permit 22 214165 BLD
- Closed
Addition or alteration · Addition(s)
Alterations to construct a new pedestrian bridge across Bay Street connecting 141 Bay Street Office to 65 Front Street (Union Bridge) ( see also Permit No. 22-214132 )
Applied Oct 6, 2022 · issued Dec 12, 2023 · completed Aug 14, 2026 · Permit 22 214102 BLD
- Cancelled
Conditional permit · Partial permit - structural framing
Conditional Permit - Part Permit - Proposal to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; l02 connection to Metrolinx rail platform #3; pedestrian bridge connections to union station and 1 esplanade at l02 (City of Toronto path system; overbuild skypark at l04)
Applied Jan 7, 2022 · issued Apr 29, 2022 · completed Sep 8, 2023 · Permit 20 105721 STR
- Closed
Fire and security upgrade
Fire Service Upgrade (FSU) regarding Sprinkler shop drawings in connection with permit application 20-105721 to construct a 50 storey office and retail building with 5 levels below grade parking
Applied Dec 7, 2021 · issued Jan 11, 2022 · completed Jan 11, 2022 · Permit 21 245751 FSU
- Cancelled
Conditional permit · Partial permit - foundation
Conditional Permit - Part Permit - Proposal to to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; l02 connection to Metrolinx rail platform #3; pedestrian bridge connections to union station and 1 esplanade at l02 (City of Toronto path system; overbuild Skypark at l04)
Applied Sep 27, 2021 · issued Nov 4, 2021 · completed Apr 29, 2022 · Permit 20 105721 FND
- Approved
Alternative solution
AS-FIRE DEPARTMENT ACCESSProposal to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; L02 connection to Metrolinx rail platform #3; Pedestrian bridge connections to union station and 1 Esplanade at L02 (City of Toronto Path System; Overbuild Sky park at L04)
Applied May 4, 2021 · completed Jul 14, 2021 · Permit 21 150116 ALT
- Cancelled
Conditional permit · Partial permit - shoring
Conditional Permit - Part Permit - Proposal to to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; l02 connection to metrolinx rail platform #3; pedestrian bridge connections to union station and 1 esplanade at l02 (city of toronto path system; overbuild skypark at l04)
Applied Feb 18, 2021 · issued Mar 5, 2021 · completed Nov 4, 2021 · Permit 20 105721 SHO
- Closed
Heating and ventilation
HVAC - New structural work including installation of micropiles, pile caps, steel columns, steel beam and concrete support are required to be installed prior to the main demo work.
Applied Jan 27, 2021 · issued Feb 18, 2021 · completed Jun 27, 2024 · Permit 20 168942 HVA
- Closed
Plumbing
Plumbing - New structural work including installation of micropiles, pile caps, steel columns, steel beam and concrete support are required to be installed prior to the main demo work.
Applied Jan 27, 2021 · issued Mar 8, 2021 · completed Jul 12, 2024 · Permit 20 168942 PLB
- Closed
Addition or alteration · Interior alterations
REV - 01 Revisions to include creating condenser closet and associated mechanical work as per drawingsNew structural work including installation of micropiles, pile caps, steel columns, steel beam and concrete support are required to be installed prior to the main demo work.
Applied Jan 27, 2021 · issued Mar 8, 2021 · completed Oct 31, 2024 · Permit 20 168942 BLD (revision 01)
- Approved
Alternative solution
Alternative Solution to permit the use of 65 mm standpipe hose valves in exit stairs in lieu of fire hose cabinets containing 65 mm and 38 mm hose valves, with 38 mm fire hoses within floor areas.
Applied Sep 9, 2020 · completed Nov 18, 2020 · Permit 20 191340 ALT
- Approved
Alternative solution
Alternative Solution to interconnect the ground floor and the Sky Lobby (Level 4) of the 141 Bay Street development.
Applied Sep 9, 2020 · completed Jul 11, 2025 · Permit 20 191345 ALT
- Closed
Addition or alteration · Interior alterations
New structural work including installation of micropiles, pile caps, steel columns, steel beam and concrete support are required to be installed prior to the main demo work.
Applied Jul 17, 2020 · issued Aug 18, 2020 · completed Oct 31, 2024 · Permit 20 168942 BLD
- Closed
Demolition
Demolition of the existing Metrolinx GO Bus Terminal and Partial Removal and Modificaitons to the east end of Union Station, Platform 3 (Northeast corner of the Train Shed).
Applied Jun 12, 2020 · issued Aug 18, 2020 · completed Oct 30, 2024 · Permit 20 155649 DEM
- Inspections under way
New building
Proposal to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; L02 connection to Metrolinx rail platform #3; Pedestrian bridge connections to union station and 1 Esplanade at L02 (City of Toronto Path System; Overbuild Sky park at L04)
Applied Jan 17, 2020 · issued Aug 2, 2024 · Permit 20 105721 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal to to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; l02 connection to metrolinx rail platform #3; pedestrian bridge connections to union station and 1 esplanade at l02 (city of toronto path system; overbuild skypark at l04)
Applied Jan 17, 2020 · issued Oct 5, 2022 · Permit 20 105721 HVA
- Inspections under way
Plumbing
Plumbing - Proposal to to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; l02 connection to metrolinx rail platform #3; pedestrian bridge connections to union station and 1 esplanade at l02 (city of toronto path system; overbuild skypark at l04)
Applied Jan 17, 2020 · issued Oct 5, 2022 · Permit 20 105721 PLB
- Closed
Drains and site services
Drain - Proposal to to construct a 50 storey office and retail building with 5 levels below grade parking 271 spaces and 528 bicycle parking; l02 connection to metrolinx rail platform #3; pedestrian bridge connections to union station and 1 esplanade at l02 (city of toronto path system; overbuild skypark at l04)
Applied Jan 17, 2020 · issued Nov 4, 2021 · completed Jun 19, 2026 · Permit 20 105721 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To alter the development plan approved under Site Specific By-Law 1104-2016 permitting the construction of a 50 storey office building with a seven-storey retail podium by altering the building envelope, podium and parapet height, mechanical penthouse height and roof coverage, parking space quantity and size, and the P1 level vehicular ramp.
Decision: Approved (hearing Jul 8, 2020)
Filed Oct 31, 2019 · File A1121/19TEY
What’s planned nearby
Development sites within 500 m
- Approved
- Under appeal
40 storeys · 480 homes · Mixed use
120 m away · Site plan · Under appeal · filed Aug 9, 2023
- Under review
187-199 Bay Street, 18-30 Wellington Street West and 3 other streets
64 storeys · Residential
280 m away · Site plan · Under review · filed Aug 26, 2021
- Under review
60 storeys · 256 homes · Mixed use
280 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
65 storeys · 649 homes · Mixed use
290 m away · Site plan · Under review · filed Apr 7, 2025
- Approved
39 storeys · 630 homes · Mixed use
290 m away · Site plan · Approved · filed Dec 29, 2021
Neighbours’ Committee of Adjustment files within 250 m
71 Front St W · Minor variance
To alter the existing Union Station (railway station) by constructing a new South Platform, Tracks Q and R, Concourse Extension from York Street to Bay Street, and Single Canopy Structure.
230 m away · filed Dec 12, 2022 · Approved
200 Bay St · Minor variance
To expand the existing mezzanine floor located on the 12 ½ floor level of the North Tower within the existing 26-storey commercial office building to provide additional office space.
190 m away · filed Feb 5, 2020 · Application withdrawn
22 The Esplanade · Minor variance
To modify the redevelopment proposal approved under Site-specific By-law 26-2007(OMB) for a mixed use development with two residential condominium towers and retail uses at grade by obstructing the required continuous weather protection feature through the construction of an outdoor patio associated with the existing eating establishment along The Esplanade frontage.
240 m away · filed Dec 12, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.