Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

143 Campbell Ave

The City of Toronto has 6 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    REV 01: Revision to recognize changes to basement underpinning, foundation wall and bay window.Proposal for second storey addition, interior alterations and underpinning.

    Applied Jan 7, 2026 · issued Jan 20, 2026 · Permit 25 201160 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposal for second storey addition, interior alterations and underpinning.

    Applied Jul 28, 2025 · issued Aug 14, 2025 · Permit 25 201160 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Proposal for second storey addition, interior alterations and underpinning.

    Applied Jul 28, 2025 · issued Aug 14, 2025 · Permit 25 201160 BLD

    Inspections under way
  • Drains and site services

    Drain - Proposal for second storey addition, interior alterations and underpinning.

    Applied Jul 28, 2025 · issued Aug 14, 2025 · Permit 25 201160 DRN

    Inspections under way
  • Plumbing

    Plumbing - Proposal for second storey addition, interior alterations and underpinning.

    Applied Jul 28, 2025 · issued Aug 14, 2025 · Permit 25 201160 PLB

    Inspections under way
  • Small residential project · Party wall admin permits

    Party wall admin permit for proposed underpinning of basement foundation for existing single family semi-detached dwelling at 145 Campbell Ave.

    Applied Oct 23, 2017 · issued Nov 22, 2017 · completed Feb 24, 2023 · Permit 17 251972 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 261 Perth Ave · Minor variance

    To alter the existing semi-detached dwelling by constructing a partial rear second storey addition (that will partially be cantilevered), and a front basement walkout with stairs. There are two residential dwelling units in this dwelling.

    230 m away · filed Jul 7, 2026 · Approved

  • 193 Rankin Cres · Minor variance

    To alter the existing three-storey semi-detached dwelling by enclosing the rear third storey rooftop deck.

    80 m away · filed May 6, 2025 · Approved

  • 182 Symington Ave · Minor variance

    To construct a one-storey ancillary building (detached garage) in the rear yard, abutting Royce Lane.

    180 m away · filed Nov 7, 2024 · Approved

  • 105 Campbell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor addition, rear and south side second storey additions, a complete third storey addition, a new rear basement walkout, and rear external stairs on all levels. There will be a total of three residential units in this dwelling.

    90 m away · filed Jan 17, 2024 · Refused

  • 104 Campbell Ave · Minor variance

    To legalize and to maintain the rear ground level addition (enclosed basement walkout entrance) and the above rear second floor walkout deck that were constructed without an authorized building permit.

    160 m away · filed Dec 12, 2023 · Approved

  • 89 Symington Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear third storey deck, and a rear ground floor deck. Also, to construct a one-storey ancillary building (garden suite) in the rear yard.

    130 m away · filed Oct 30, 2023 · Approved

  • 105 Campbell Ave · Minor variance

    To convert the existing two-storey semi-detached dwelling from two dwelling units into three dwelling units by constructing a third storey addition and a rear three-storey addition. Also, to construct a new rear basement walkout, as well as a rear exterior three-storey staircase.

    90 m away · filed Jun 1, 2023 · Approved

  • 166 Campbell Ave · Minor variance

    To construct a new two-storey ancillary building (garage with laneway suite) in the rear yard of the property, abutting the laneway.

    100 m away · filed Mar 2, 2023 · Refused

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.