Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

15 Lappin Ave

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Garage

    wood frame in lieu of masonry

    Applied Jun 1, 2009 · issued Jun 2, 2009 · completed Jan 13, 2026 · Permit 09 142208 BLD (revision 01)

    Closed
  • Small residential project · Garage

    proposed rear detached garage

    Applied May 27, 2009 · issued May 27, 2009 · completed Jan 13, 2026 · Permit 09 142208 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 45 Armstrong Ave · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing extensions to the upper and lower ground floor decks, and a new rooftop access staircase (within the attic space). Also, to permit the existing rooftop deck which was constructed without an authorized building permit. The existing rear one-storey addition (vestibule leading to the basement level) and rooftop access stairs will be demolished.

    220 m away · filed May 15, 2026 · Approved

  • 80 Armstrong Ave · Minor variance

    To alter the existing rear one-storey detached ancillary building (two-car garage, abutting the laneway) by constructing a complete second storey addition (cantilevered at the south side of the building), to contain one laneway suite. There will be a total of four residential dwelling units on this lot (three units within the main dwelling and one unit within the ancillary building).

    210 m away · filed Mar 3, 2026 · Approved

  • 10 Millicent St · Minor variance

    To alter the existing rear one-storey detached ancillary building (one-car garage), by constructing a one-storey addition along a portion of the south side wall, to contain a lounge area and bathroom.

    60 m away · filed Dec 4, 2025 · Approved

  • 815 Gladstone Ave · Minor variance

    To alter the existing two-storey detached dwelling (duplex) by converting the existing front integral garage into habitable space. Also, to install a front yard parking pad (to replace the existing reverse slope driveway, which will be filled in), abutting Gladstone Avenue.

    240 m away · filed Apr 17, 2025 · Application withdrawn

  • 27 Millicent St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a ground floor covered deck (green rooftop on second level) and stairs, a complete third storey addition, and a front second storey deck. Also, to construct a new two-storey ancillary building (containing a garage on the ground level and one laneway suite on the second level), in the rear yard, abutting the laneway. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).

    110 m away · filed Apr 2, 2025 · Approved

  • 98 Millicent St · Minor variance

    To legalize and to maintain the existing two-storey ancillary building (containing two laneway suites), abutting the laneway, which was constructed beyond the limits of the authorized building permit. The ground level garage within the ancillary building was converted into an additional residential dwelling unit. There will be a total of four residential dwelling units on this lot (two units within the main dwelling and two units within the ancillary building).

    210 m away · filed Jan 27, 2025 · Postponed

  • 83 Millicent St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with basement extension below, and a rear ground floor deck. The existing ancillary building (detached garage) in the rear yard, abutting the laneway, will be maintained and unaltered.

    210 m away · filed Jun 22, 2024 · Approved

  • 21 Lappin Ave · Minor variance

    To construct a two-storey semi-detached ancillary building (laneway suite) in the rear yard of the three-storey semi-detached triplex currently under construction, as approved by Minor Variance Decision A1149/19TEY. There will be a total of four dwelling units on the lot (three units within the main house (triplex) and one unit within the laneway suite. This current application is necessitated to correctly identify variances for the laneway suite not included in the previous Minor Variance Decision.

    20 m away · filed Sep 21, 2023 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.