Toronto address · Ward 9, Davenport
151 Earlscourt Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Second suite (New)
Proposed construction of a new basement walk-out stair
Applied Apr 30, 2020 · issued May 20, 2020 · completed Oct 20, 2020 · Permit 20 140920 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
133 Boon Ave · Minor variance
To legalize and to maintain the rear fourth storey addition with a rooftop terrace (on the roof of the third storey), of the existing three-and-one-half-storey semi-detached dwelling (basement level is considered the first storey), that was constructed without an authorized building permit. Also, to permit the rear two-storey addition (located at the rear of the second and third storeys of the dwelling) that was constructed beyond the limits of an authorized building permit (19 212470 BLD 00 SR).
200 m away · filed Jun 4, 2026 · Approved
188 Nairn Ave · Minor variance
150 m away · filed May 12, 2026 · Postponed
95 Day Ave · Minor variance
To legalize and to maintain the existing rear ground floor deck with canopy and stairs, which was constructed without an authorized building permit.
240 m away · filed Jan 13, 2025 · Approved
86 Day Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition and a rear third storey addition. The existing rear basement walkout will be reconstructed and the existing rear deck will be demolished.
190 m away · filed Jun 12, 2024 · Approved
195 Nairn Ave · Minor variance
To convert the existing one-storey detached dwelling (one unit) into a three-storey detached dwelling (duplex) by constructing a rear one-storey addition with a ground floor deck, and second and third storey additions. Also, to reconstruct the front porch, the front basement walk-out, and the rear one-storey ancillary building (detached garage, abutting the laneway). There will be a total of two residential dwelling units on this lot.
120 m away · filed Feb 5, 2024 · Approved
142 Earlscourt Ave · Minor variance
To permit the existing one-and-one-half-storey ancillary structure (carport roof structure with storage space above) in the rear yard. The existing two-storey semi-detached dwelling will be maintained and unaltered.
90 m away · filed Jun 1, 2023 · Approved
17 Day Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition and new stairs.
230 m away · filed Apr 25, 2023 · Withdrawn
137 Morrison Ave · Minor variance
To alter the existing two-storey detached dwelling by enclosing the existing front porch and to construct new front stairs.
200 m away · filed Apr 18, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.