Toronto address · Ward 9, Davenport
154 Symington Ave
The City of Toronto has 7 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Proposal for interior alterations for a secondary unit.
Applied Apr 5, 2019 · issued May 3, 2019 · completed Jul 11, 2022 · 1 home added · Permit 19 136154 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations for a secondary unit, new verandah and walkout.
Applied Apr 5, 2019 · issued May 3, 2019 · completed Jul 14, 2022 · Permit 19 136154 PLB
- Closed
Small residential project · Other
Proposal to install solar panels on roof of existing detached single family dwelling.
Applied Aug 9, 2018 · issued Aug 15, 2018 · completed Oct 2, 2025 · Permit 18 206880 BLD
- Closed
Small residential project · Multiple projects
Rev01: Revision to underpinning for bench footingOrig: Proposal to underpin the basement, construct a front basement walk-out and for interior alterations to the basement) -- single family dwelling.
Applied Jun 13, 2018 · issued Jun 15, 2018 · completed Mar 13, 2019 · Permit 18 136475 BLD (revision 01)
- Closed
Small residential project · Multiple projects
Proposal to underpin the basement, construct a front basement walk-out and for interior alterations to the basement) -- single family dwelling.
Applied Mar 29, 2018 · issued Apr 20, 2018 · completed Mar 13, 2019 · Permit 18 136475 BLD
- Closed
Plumbing
Plumbing - Proposal to underpin the basement, construct a front basement walk-out and for interior alterations to the basement to convert to a secondary suite to convert to a 2 unit dwelling.
Applied Mar 29, 2018 · issued Apr 20, 2018 · completed Mar 13, 2019 · Permit 18 136475 PLB
- Closed
Drains and site services
Drain - Proposal to underpin the basement, construct a front basement walk-out and for interior alterations to the basement to convert to a secondary suite to convert to a 2 unit dwelling.
Applied Mar 29, 2018 · issued Apr 20, 2018 · completed Mar 13, 2019 · Permit 18 136475 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
224-258 Wallace Avenue and 80-90 Ward Street
Mixed use
370 m away · Rezoning · Under review · filed May 14, 2026
- Under review
29 storeys · 288 homes · Mixed use
400 m away · Site plan · Under review · filed Jul 25, 2024
- Under review
42 storeys · 56 homes · Not stated in the file
410 m away · Site plan · Under review · filed Jun 27, 2025
- Under review
21 storeys · 861 homes · Residential
450 m away · Site plan · Under review · filed Nov 7, 2024
- Under review
1423-1437 Bloor Street West and 278 Sterling Road
18 storeys · 197 homes · Mixed use
470 m away · Site plan · Under review · filed Aug 20, 2021
- Under review
19 storeys · 325 homes · Mixed use
470 m away · Condominium · Under review · filed Nov 8, 2021
Neighbours’ Committee of Adjustment files within 250 m
209 Symington Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (including a basement level) with a covered deck and stairs.
210 m away · filed Jul 28, 2026 · Approved
261 Perth Ave · Minor variance
To alter the existing semi-detached dwelling by constructing a partial rear second storey addition (that will partially be cantilevered), and a front basement walkout with stairs. There are two residential dwelling units in this dwelling.
120 m away · filed Jul 7, 2026 · Approved
193 Rankin Cres · Minor variance
To alter the existing three-storey semi-detached dwelling by enclosing the rear third storey rooftop deck.
200 m away · filed May 6, 2025 · Approved
182 Symington Ave · Minor variance
To construct a one-storey ancillary building (detached garage) in the rear yard, abutting Royce Lane.
100 m away · filed Nov 7, 2024 · Approved
105 Campbell Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor addition, rear and south side second storey additions, a complete third storey addition, a new rear basement walkout, and rear external stairs on all levels. There will be a total of three residential units in this dwelling.
180 m away · filed Jan 17, 2024 · Refused
104 Campbell Ave · Minor variance
To legalize and to maintain the rear ground level addition (enclosed basement walkout entrance) and the above rear second floor walkout deck that were constructed without an authorized building permit.
210 m away · filed Dec 12, 2023 · Approved
89 Symington Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear third storey deck, and a rear ground floor deck. Also, to construct a one-storey ancillary building (garden suite) in the rear yard.
150 m away · filed Oct 30, 2023 · Approved
5 Ruskin Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch, a rear two-storey addition, a partial third storey addition with a rooftop deck (located on the east side), and a rear ground floor deck.
240 m away · filed Aug 8, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.