Toronto address · Ward 10, Spadina-Fort York
16 Harbour St
The City of Toronto has 3 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposal to replace backflow preventer - existing premise needs replacement
Applied Nov 5, 2023 · issued Dec 7, 2023 · completed Jun 3, 2024 · Permit 23 222393 PSA
- Permit issued
Addition or alteration · Interior alterations
Adding a new room (parcel room) at the garbage room area.
Applied Jul 17, 2023 · issued Sep 8, 2023 · Permit 23 175606 BLD
- Closed
Designated structure · Sign building permit related
Proposal to erect and display two illuminated wall signs displaying static copy on the first storey of the northerly elevation, one measuring 4.88 m by 0.86 m at a height of 4.88 m, and one measuring 5.18 m by 0.84 m at a height of 4.88 m. **RE/MAX****SUNDEEP BAHL & TIM YEW**
Applied Jun 13, 2018 · issued Jun 25, 2018 · completed Sep 12, 2018 · Permit 18 176578 DST
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
85 storeys · 2,406 homes · Residential
220 m away · Rezoning · Under review · filed Oct 15, 2025
- Approved
- Under appeal
- Under review
95 storeys · Not stated in the file
220 m away · Site plan · Under review · filed Oct 25, 2022
- Under review
45 storeys · 449 homes · Residential
310 m away · Site plan · Under review · filed Apr 21, 2021
- Approved
Neighbours’ Committee of Adjustment files within 250 m
7 Yonge St · Minor variance
To alter the development standards for a 92-storey mixed-use building (Tower 2), as approved under Site Specific Zoning By-law 1250-2023 (By-law 249-2020(LPAT)), by increasing the number of storeys and building height from 92-storeys (289 m) to 95-storeys (306.4 m). There will be a total of 1,014 residential dwelling units within this tower.
200 m away · filed Jul 15, 2025 · Approved
7 Yonge St · Minor variance
To alter the development standards for a 105-storey mixed-use building (as approved under Site Specific Zoning By-law 1250-2023) by increasing the building height and to permit an emergency generator on the roof of the building to exceed the maximum permitted building height. The new 106-storey mixed-use building will contain a total of 958 residential dwelling units, retail uses located on the ground floor, and a hotel use located on the 1st to 12th levels.
200 m away · filed Feb 27, 2025 · Approved
20 Bay St · Minor variance
To alter the existing 25-storey building (Unit 108/108A and Unit 109) by permitting a side (north) ground level patio and associated structures (tables and planters) within the colonnade.
180 m away · filed Oct 31, 2024 · Approved
7 Yonge St · Consent
To obtain consent to sever a portion of the land for the purpose of a lot addition, and to create new easements/rights-of-way.
200 m away · filed Sep 8, 2022 · Approved
7 Yonge St · Consent
To obtain consent to the discharge of a mortgage over a partially stratified strip of land of property, municipally known as 7 Yonge Street.
200 m away · filed Sep 6, 2022 · Approved
7 Yonge St · Consent
To obtain consent to establish an easement/right-of-way on a consolidated lot consisting of Parts 1, 3, 4, 5, 6, 8 and 9, Draft-R Plan, as described in Application B0055/20TEY.
200 m away · filed Jan 21, 2021 · Approved with conditions
7 Yonge St · Consent
To obtain consent to sever the property to create three lots and various easements/rights-of-way.
200 m away · filed Sep 25, 2020 · Approved
1 Yonge St · Minor variance
To modify the phased mixed-use development scheme approved under Site Specific Zoning By-law 249-2020 (LPAT) for Phases 2 and 3, by altering the permitted location of the building and canopies and increasing building height.
230 m away · filed Aug 27, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.