Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 4, Parkdale-High Park

16 Melbourne Ave

The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal for basement underpinning, interior alterations on all floors, and a new suite in the basement.

    Applied Jan 28, 2022 · issued Oct 25, 2022 · Permit 22 108455 PLB

    Inspections under way
  • Small residential project · Multiple projects

    Proposal for basement underpinning, interior alterations on all floors, and a new suite in the basement.

    Applied Jan 28, 2022 · issued Oct 25, 2022 · 1 home added · Permit 22 108455 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 1229 Queen St W · Minor variance

    To alter the existing two-storey building (Community Centre) by constructing stepped four to seven-storey additions. This altered mixed-use building will contain an expansion of healthcare services and there will be a total number of 55 affordable residential dwelling units within the building on this lot. Also, to reduce the required parking spaces to 14 parking spaces (located at grade abutting Milkyway Lane). No visitor parking spaces will be provided.

    150 m away · filed Sep 13, 2024 · Approved

  • 6 Noble St · Minor variance

    To alter the development standards for an 8-storey (33 m) mixed-use building (approved under Site Specific Zoning By-law 862-2021(OLT)) by increasing the building height to 11-storey (43 m, including a mechanical penthouse), as well as the total gross floor area (from 9,500 m² to 12,110 m²), and to reduce the mechanical penthouse building setback (east and south lot lines).

    240 m away · filed Nov 27, 2023 · Approved

  • 69 Elm Grove Ave · Consent

    To obtain consent to sever a portion of land for the purpose of a lot addition.

    170 m away · filed Jan 17, 2023 · Approved

  • 44 Gwynne Ave · Minor variance

    To alter the existing two-storey towhouse dwelling by constructing a new two-storey rear addition.

    60 m away · filed Oct 13, 2022 · Approved

  • 15 Elm Grove Ave · Minor variance

    To construct four secondary suites and to maintain one primary suite, within the existing two-and-one-half-storey detached dwelling, for a total of 5 residential units. Also, to provide three parking pads at the rear of the property, abutting the laneway.

    170 m away · filed Jan 20, 2022 · Approved

  • 87 Milky Way · Minor variance

    To permit a Community Garden by constructing: planting areas, raised gardens, composting areas/bins, a one-storey green house, a pergola structure, modular container grow farm, storage shed, and rainwater storage containers.

    230 m away · filed Jun 8, 2021 · Approved

  • 7 Gwynne Ave · Minor variance

    To construct a front walkout for a basement secondary suite.

    150 m away · filed Jun 24, 2020 · Approved

  • 12 Elm Grove Ave · Minor variance

    To alter the existing four storey residential building by converting storage space on the first storey into a two-bedroom suite.

    230 m away · filed Jun 15, 2020 · Approved

Everything planned in Parkdale-High Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.