Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

17 Evergreen Ave

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposal to install back water valve.

    Applied Mar 15, 2019 · issued Mar 15, 2019 · completed Mar 20, 2019 · Permit 19 126186 DRN

    Closed
  • Heating and ventilation

    HVAC - Construction of a second storey stucco addition above existing 1-storey frame building.

    Applied Aug 10, 2018 · issued Aug 21, 2018 · completed Feb 13, 2019 · Permit 18 120089 HVA

    Closed
  • Small residential project · Multiple projects

    REV: Revised floor plans and elevation drawings for construction of a second storey stucco addition above existing 1-storey frame building.Construction of a second storey stucco addition above existing 1-storey frame building.

    Applied Jun 8, 2018 · issued Jun 20, 2018 · completed Mar 21, 2019 · Permit 18 120089 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - Construction of a second storey stucco addition above existing 1-storey frame building.

    Applied Feb 22, 2018 · issued Apr 9, 2018 · completed Feb 13, 2019 · Permit 18 120089 PLB

    Closed
  • Small residential project · Multiple projects

    Construction of a second storey stucco addition above existing 1-storey frame building.

    Applied Feb 22, 2018 · issued Apr 9, 2018 · completed Mar 21, 2019 · Permit 18 120089 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a two-storey front addition which will include an attached garage, a second storey addition above the existing one-storey portion of the dwelling, a new front porch, and a second storey front platform.

    Decision: Approved (hearing Jan 11, 2018)

    Filed Oct 19, 2017 · File A0906/17EYK

    Closed

What’s planned nearby

Development sites within 500 m

  • 80 Thirtieth Street

    4 storeys · Residential

    440 m away · Site plan · Approved · filed Mar 12, 2024

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 86 Laburnham Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    220 m away · filed Jan 8, 2026 · Approved

  • 86 Laburnham Ave · Minor variance

    To construct a new detached dwelling with an attached garage and a secondary suite.

    220 m away · filed Jan 8, 2026 · Approved

  • 86 Laburnham Ave · Minor variance

    To construct a new detached dwelling with an attached garage and a secondary suite.

    220 m away · filed Jan 8, 2026 · Approved

  • 76 Twenty Fourth St · Minor variance

    To construct a new fourplex

    240 m away · filed Aug 5, 2025 · Approved

  • 35 Laburnham Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    100 m away · filed Jun 3, 2025 · Approved

  • 35 Laburnham Ave · Minor variance

    To construct a new semi-detached fourplex.

    100 m away · filed Jun 3, 2025 · Approved

  • 35 Laburnham Ave · Minor variance

    To construct a new semi-detached fourplex.

    100 m away · filed Jun 3, 2025 · Approved

  • 35 Elder Ave · Minor variance

    To construct a new multiplex containing 4 units and a two-storey garden suite in the rear yard.

    200 m away · filed Mar 11, 2025 · Refused

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.