Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

172 Pape Ave

The City of Toronto has 3 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Interior alterations

    Replace two existing windows on the north elevation of the home with 45 minute FRR glazing assembly to make them code compliant

    Applied May 12, 2026 · issued May 15, 2026 · Permit 26 159124 BLD

    Inspections under way
  • Small residential project · Addition(s)

    Proposal to enclose part of existing front porch (unheated)

    Applied Dec 29, 2022 · issued Jan 31, 2023 · completed Aug 1, 2024 · Permit 22 243040 BLD

    Closed
  • Small residential project · Garage

    Repairs to existing garage structure - support existing walls, new walls and new roof structure

    Applied Aug 24, 2018 · issued Nov 12, 2018 · Permit 18 214965 BLD

    Permit issued

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-storey semi-detached dwelling by enclosing a portion of the front porch.

    Decision: Approved (hearing Apr 27, 2022)

    Filed May 22, 2021 · File A0709/21TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 929 Queen Street East

    9 storeys · 78 homes · Mixed use

    350 m away · Site plan · Approved · filed May 3, 2023

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 27 Brooklyn Ave · Minor variance

    220 m away · filed Aug 21, 2026 · Postponed

  • 12 Audley Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a rear ground floor addition and a rear deck with stairs.

    220 m away · filed Jun 17, 2026 · Approved

  • 64 Brooklyn Ave · Minor variance

    To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).

    160 m away · filed Apr 23, 2026 · Approved

  • 188 Pape Ave · Minor variance

    To construct a new one-storey detached ancillary building (containing a two-car garage), in the rear yard, abutting the laneway.

    60 m away · filed Mar 2, 2026 · Approved

  • 137 Boston Ave · Minor variance

    To construct a two-storey ancillary building (one-car garage and elevator on the main level, and one laneway suite on the second level), in the rear yard, abutting the laneway.

    180 m away · filed Jul 17, 2025 · Approved

  • 188 Pape Ave · Minor variance

    To alter the existing two-storey detached dwelling by reconstructing a side (south) basement walkout, and to construct a rear two-storey addition with basement (replaces the existing one-storey). There will be a total of two residential dwelling units on the lot (one unit occupying the main dwelling and one unit occupying the laneway suite proposed as of right/not part of this application). The existing rear detached garage will be demolished.

    60 m away · filed Jun 5, 2025 · Approved

  • 14 Blong Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.

    110 m away · filed Apr 22, 2025 · Approved

  • 326 Carlaw Ave · Minor variance

    To alter the existing four-storey mixed-use building by constructing a one-storey rooftop addition (including a deck) above the residential condominium unit (Unit 109), as well as to construct a mezzanine addition within Unit 109.

    240 m away · filed Apr 3, 2025 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.