Toronto address · Ward 8, Eglinton-Lawrence
18 Chudleigh Ave
The City of Toronto has 4 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Revision 01 - Revision to covert crawl space to a new storage room.-----------------------------------------------------------------Interior alteration to the existing single family dwelling, relocate kitchen, remove non-load bearing walls on the first floor, and make crawl space.
Applied Mar 12, 2025 · issued Apr 14, 2025 · completed Apr 22, 2025 · Permit 18 213659 BLD (revision 01)
- Closed
Small residential project · Deck
Proposal for a new rear deck
Applied Dec 13, 2019 · issued Jan 20, 2020 · completed Sep 5, 2025 · Permit 19 260874 BLD
- Closed
Plumbing
Plumbing - Interior alteration to the existing single family dwelling, relocate kitchen, remove non-load bearing walls on the first floor, and make crawl space.
Applied Aug 22, 2018 · issued Sep 20, 2018 · completed Apr 23, 2025 · Permit 18 213659 PLB
- Closed
Small residential project · Multiple projects
Interior alteration to the existing single family dwelling, relocate kitchen, remove non-load bearing walls on the first floor, and make crawl space.
Applied Aug 22, 2018 · issued Sep 20, 2018 · completed Apr 22, 2025 · Permit 18 213659 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
9 storeys · 40 homes · Residential
380 m away · Rezoning · Under appeal · filed Mar 3, 2023
- Under review
109 homes · Residential
430 m away · Condominium · Under review · filed Oct 29, 2021
- Approved
4 storeys · 16 homes · Residential
440 m away · Site plan · Approved · filed Jun 30, 2022
- Under review
Neighbours’ Committee of Adjustment files within 250 m
37 Unsworth Ave · Minor variance
To alter the existing semi-detached dwelling and convert into a duplex by constructing a rear two-storey addition with a new rear deck.
170 m away · filed Jan 14, 2026 · Approved
30 Chudleigh Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a two-storey rear addition and a new rear deck. Please note, this application was previously deferred at the September 11, 2025 Committee of Adjustment Hearing.
60 m away · filed Jun 17, 2025 · Approved
27 Cortland Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a two-storey rear addition, with a basement walk-up and a new deck. Please note, the application was previously deferred by the Committee of Adjustment on July 24, 2025.
100 m away · filed Jun 6, 2025 · Approved
28 Chatsworth Dr · Minor variance
To legalize and maintain the pool cabana in the rear yard and the front and rear yard landscaping.
230 m away · filed Mar 24, 2025 · Approved
33 Chudleigh Ave · Minor variance
To construct a two-storey addition to the rear of the existing dwelling, in conjunction with other interior and exterior alterations.
70 m away · filed Sep 13, 2023 · Approved
39 Chudleigh Ave · Minor variance
Proposal to construct new two storey dwelling with a rear deck, rear walkout, covered porch and window projection on the east wall.
100 m away · filed Jun 13, 2023 · Approved
39 Chudleigh Ave · Minor variance
Proposal to construct new 2 storey detached house with integrated basement and garage
100 m away · filed Apr 21, 2023 · Refused
15 Chudleigh Ave · Minor variance
Proposal to construct a two storey rear addition, a one storey front extension, a rear deck, and a detached rear yard garage and shed to the existing dwelling.
50 m away · filed Oct 17, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.