Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

182 Pape Ave

The City of Toronto has 1 Committee of Adjustment file on record for this address.

Building permits

The City lists no building permits for this address since 2017, and none still open from before.

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-storey semi-detached dwelling by converting the attic into habitable space and constructing a rear third storey addition with a rear third storey balcony.

    Decision: Approved (hearing Jun 19, 2019)

    Filed Mar 20, 2019 · File A0292/19TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 929 Queen Street East

    9 storeys · 78 homes · Mixed use

    390 m away · Site plan · Approved · filed May 3, 2023

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 27 Brooklyn Ave · Minor variance

    220 m away · filed Aug 21, 2026 · Postponed

  • 12 Audley Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a rear ground floor addition and a rear deck with stairs.

    180 m away · filed Jun 17, 2026 · Approved

  • 64 Brooklyn Ave · Minor variance

    To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).

    150 m away · filed Apr 23, 2026 · Approved

  • 188 Pape Ave · Minor variance

    To construct a new one-storey detached ancillary building (containing a two-car garage), in the rear yard, abutting the laneway.

    20 m away · filed Mar 2, 2026 · Approved

  • 137 Boston Ave · Minor variance

    To construct a two-storey ancillary building (one-car garage and elevator on the main level, and one laneway suite on the second level), in the rear yard, abutting the laneway.

    160 m away · filed Jul 17, 2025 · Approved

  • 188 Pape Ave · Minor variance

    To alter the existing two-storey detached dwelling by reconstructing a side (south) basement walkout, and to construct a rear two-storey addition with basement (replaces the existing one-storey). There will be a total of two residential dwelling units on the lot (one unit occupying the main dwelling and one unit occupying the laneway suite proposed as of right/not part of this application). The existing rear detached garage will be demolished.

    20 m away · filed Jun 5, 2025 · Approved

  • 1230 Dundas St E · Consent

    To obtain consent to sever a portion of the lands within the existing building for a lot addition (stratified) and to maintain existing easements/rights-of-way. Note: 1230 and 1220 Dundas Street East are contiguous properties, under the same ownership and share a building envelope (with separate entrances) with modifiable demising walls. The adjacent property at 1210 Dundas Street East is occupied by Crow¿'s Theatre.

    230 m away · filed Apr 23, 2025 · Approved

  • 14 Blong Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.

    110 m away · filed Apr 22, 2025 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.