Toronto address · Ward 14, Toronto-Danforth
195 Boulton Ave
The City of Toronto has 6 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposed underpinning, interior alteration to the basement, new rear yard basement walkout stairs and new rear yard ground floor deck.
Applied Jun 9, 2021 · issued Jun 16, 2021 · completed Jan 27, 2023 · Permit 21 100318 HVA
- Closed
Plumbing
Plumbing - Interior alteration to the basement and rear deck
Applied Jan 4, 2021 · issued Feb 2, 2021 · completed Apr 26, 2023 · Permit 21 100318 PLB
- Closed
Small residential project · Multiple projects
Proposed underpinning, interior alteration to the basement, new rear yard basement walkout stairs and new rear yard ground floor deck.
Applied Jan 4, 2021 · issued Feb 2, 2021 · completed Jan 27, 2023 · Permit 21 100318 BLD
- Closed
Small residential project · Party wall admin permits
Admin permit for work in conjunction with 197 Boulton Ave. - Permit Number: 18-262154 BLD
Applied Dec 11, 2018 · issued Jan 17, 2019 · completed Jun 30, 2022 · Permit 18 267201 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations to an existing 2 storey SFD-semi dwelling.
Applied Oct 7, 2014 · issued Nov 3, 2014 · completed Sep 17, 2026 · Permit 14 233769 PLB
- Closed
Small residential project · Interior alterations
Proposal for interior alterations to an existing 2 storey SFD-semi dwelling.
Applied Oct 7, 2014 · issued Nov 3, 2014 · completed Sep 17, 2026 · Permit 14 233769 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
51 homes · Residential
420 m away · Site plan · Under review · filed Apr 24, 2024
Neighbours’ Committee of Adjustment files within 250 m
195 De Grassi St · Minor variance
To legalize and to maintain the existing rear ground floor L-shaped deck with stairs, and a rear third floor rooftop deck (including a hot tub and a shower). This was all constructed without an authorized building permit, to the existing three-storey semi-detached dwelling.
80 m away · filed May 20, 2026 · Approved
162 Boulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a side (south) third floor balcony.
60 m away · filed Apr 17, 2026 · Approved
242 Boulton Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch (for habitable space).
160 m away · filed Sep 8, 2025 · Approved
674 Gerrard St E · Minor variance
To convert the existing two-storey mixed-use building into a hotel.
240 m away · filed Oct 16, 2024 · Approved
666 Gerrard St E · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear three-storey addition, a front basement walkout, a side (east) third storey balcony, and rear second and third storey terraces. This building will contain a total of five residential dwelling units.
240 m away · filed Apr 18, 2024 · Approved
109 Boulton Ave · Minor variance
To construct a new three-storey semi-detached dwelling with a front third storey terrace and one parking space on the north side yard of the property.
220 m away · filed Jan 24, 2024 · Approved
109 Boulton Ave · Consent
To obtain consent to sever an existing residential lot into three residential lots (of which two will be undersized), and to create an easement/right-of-way.
220 m away · filed Jan 24, 2024 · Approved
109 Boulton Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a new south side basement walkout. Also, to remove the on-site parking space.
220 m away · filed Jan 24, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.