Toronto address · Ward 9, Davenport
1968 Dufferin St
The City of Toronto has 9 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Small residential project · Other
Proposal to convert the basement into a third dwelling unit.
Applied Jul 29, 2020 · completed Jun 14, 2023 · 1 home added · Permit 20 174535 BLD
- Closed
Heating and ventilation
Revision 01: Location of HRV's on every level, and spacing inbetween radiant heatingHVAC - Underpin and finish basement
Applied Jul 4, 2017 · issued Jul 5, 2017 · completed Dec 19, 2017 · Permit 16 155230 HVA (revision 01)
- Closed
Heating and ventilation
HVAC - Underpin and finish basement
Applied May 23, 2017 · issued Jun 13, 2017 · completed Dec 19, 2017 · Permit 16 155230 HVA
- Closed
Small residential project · Multiple projects
Revision #2: Changes to floor framing as existing is deteriorated. Reconfigure layout to 1st and 2nd floors and increase bedroom.. Changes to roof members.Revision to basement layout
Applied Oct 26, 2016 · issued Apr 3, 2017 · completed Dec 19, 2017 · Permit 16 155230 BLD (revision 02)
- Closed
Plumbing
Revision #1: for changes to building permitPlumbing - Underpin and finish basement
Applied Oct 26, 2016 · issued Nov 4, 2016 · completed Dec 19, 2017 · Permit 16 155230 PLB (revision 01)
- Closed
Small residential project · Multiple projects
Revision to basement layout
Applied Jul 19, 2016 · issued Aug 10, 2016 · completed Dec 19, 2017 · Permit 16 155230 BLD (revision 01)
- Closed
Drains and site services
Drain - Underpin and finish basement
Applied May 13, 2016 · issued May 31, 2016 · completed Dec 19, 2017 · Permit 16 155230 DRN
- Closed
Plumbing
Plumbing - Underpin and finish basement
Applied May 13, 2016 · issued May 31, 2016 · completed Dec 19, 2017 · Permit 16 155230 PLB
- Closed
Small residential project · Multiple projects
Underpin and finish basement
Applied May 13, 2016 · issued May 31, 2016 · completed Dec 19, 2017 · Permit 16 155230 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a two-storey front addition.
Decision: Approved (hearing Feb 23, 2017)
Filed Dec 8, 2016 · File A0950/16EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
75 Sellers Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear basement walkout, a rear one-storey addition with a rear ground floor deck and stairs, and a rear second storey balcony. Also, to construct a new one-storey ancillary building (two-car garage), in the rear yard, abutting the laneway. This garage will be in full compliance with the zoning by-law(s).
130 m away · filed Nov 4, 2025 · Approved
3 Rosecliffe Ave · Minor variance
To legalize and to maintain the rear one-storey addition (abutting the west portion of the existing rear one-storey east side addition), as well as the complete second storey addition. There will be a rear ground level deck with stairs. Also, to legalize and to maintain the new one-storey detached ancillary building (one-car garage) in the rear yard. These additions have been constructed without an authorized building permit(s).
120 m away · filed May 2, 2025 · Approved
135 Sellers Ave · Minor variance
To alter the existing one-and-one-half-storey detached dwelling by constructing a rear two-storey addition with entrance stairs on the ground floor and a complete third storey addition.
70 m away · filed May 2, 2025 · Postponed
95 Day Ave · Minor variance
To legalize and to maintain the existing rear ground floor deck with canopy and stairs, which was constructed without an authorized building permit.
140 m away · filed Jan 13, 2025 · Approved
2012 Dufferin St · Minor variance
To convert the existing three-storey, four-unit, dwelling into a three-storey, six-unit apartment building by constructing a front two-storey addition (above the existing ground floor enclosed porch), enlarging the existing third storey (ceiling space), a new rear three-storey addition, and a rear ground floor deck with stairs.
150 m away · filed Sep 10, 2024 · Approved
2004 Dufferin St · Minor variance
To convert the existing one-storey ancillary building (detached garage in the rear yard, abutting the laneway), into one two-storey laneway suite by constructing a complete second storey and a ground floor terrace (on the east side).
130 m away · filed Aug 8, 2024 · Approved
86 Day Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition and a rear third storey addition. The existing rear basement walkout will be reconstructed and the existing rear deck will be demolished.
190 m away · filed Jun 12, 2024 · Approved
164 Day Ave · Minor variance
To permit the existing one-storey detached dwelling by converting the enclosed front porch into habitable space, and to construct a new covered front porch and stairs.
240 m away · filed May 27, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.