Toronto address · Ward 14, Toronto-Danforth
197 Boulton Ave
The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposed interior alterations to all levels of existing dwelling and new secondary suite.
Applied Oct 24, 2019 · issued Dec 18, 2019 · completed Nov 30, 2020 · Permit 19 240408 HVA
- Closed
Plumbing
Plumbing - Proposed interior alterations to all levels of existing dwelling and new secondary suite.
Applied Oct 24, 2019 · issued Dec 18, 2019 · completed Nov 30, 2020 · Permit 19 240408 PLB
- Closed
Small residential project · Interior alterations
Proposed interior alterations to all levels of existing dwelling to add one (1) new secondary suite on the existing second and third floors for a total of two (2) dwelling units.
Applied Oct 24, 2019 · issued Dec 18, 2019 · completed Jun 1, 2022 · 1 home added · Permit 19 240408 BLD
- Closed
Small residential project · Multiple projects
Proposed underplinning, front porch modifications and new basement walk out for an existing single family semi-detached dwelling.
Applied Nov 28, 2018 · issued Jan 17, 2019 · completed Jun 24, 2022 · Permit 18 262154 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing 2 ½ semi-detached dwelling by creating two secondary suites for a total of three dwelling units and constructing a front yard basement walkout.
Decision: Withdrawn (hearing Jul 31, 2019)
Filed Mar 26, 2019 · File A0304/19TEY
What’s planned nearby
Development sites within 500 m
- Under review
51 homes · Residential
410 m away · Site plan · Under review · filed Apr 24, 2024
Neighbours’ Committee of Adjustment files within 250 m
195 De Grassi St · Minor variance
To legalize and to maintain the existing rear ground floor L-shaped deck with stairs, and a rear third floor rooftop deck (including a hot tub and a shower). This was all constructed without an authorized building permit, to the existing three-storey semi-detached dwelling.
80 m away · filed May 20, 2026 · Approved
162 Boulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a side (south) third floor balcony.
60 m away · filed Apr 17, 2026 · Approved
242 Boulton Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch (for habitable space).
150 m away · filed Sep 8, 2025 · Approved
674 Gerrard St E · Minor variance
To convert the existing two-storey mixed-use building into a hotel.
220 m away · filed Oct 16, 2024 · Approved
666 Gerrard St E · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear three-storey addition, a front basement walkout, a side (east) third storey balcony, and rear second and third storey terraces. This building will contain a total of five residential dwelling units.
230 m away · filed Apr 18, 2024 · Approved
109 Boulton Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a new south side basement walkout. Also, to remove the on-site parking space.
230 m away · filed Jan 24, 2024 · Approved
109 Boulton Ave · Minor variance
To construct a new three-storey semi-detached dwelling with a front third storey terrace and one parking space on the north side yard of the property.
230 m away · filed Jan 24, 2024 · Approved
109 Boulton Ave · Consent
To obtain consent to sever an existing residential lot into three residential lots (of which two will be undersized), and to create an easement/right-of-way.
230 m away · filed Jan 24, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.