Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

2 Station Rd

Wesley Mimico United Church

The City of Toronto has 9 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Revision #01 - Changes to interior alterations, as per attached.Make interior alteration to change from Place of Worshop to Montessori School.

    Applied Jan 29, 2018 · issued Mar 7, 2018 · completed Apr 23, 2018 · Permit 17 134738 BLD (revision 01)

    Closed
  • Heating and ventilation

    Revision #01 - Changes to interior alterations, as per attached.HVAC - Make interior alteration to change from Place of Worshop to Montessouri School.

    Applied Jan 29, 2018 · issued Feb 1, 2018 · completed Jul 3, 2026 · Permit 17 134738 HVA (revision 01)

    Closed
  • Alternative solution

    45min FRR assembly for HVAC ductwork thorugh floor having a fire rated underneath (existing plaster celing)

    Applied Nov 7, 2017 · completed Jan 4, 2018 · Permit 17 259090 ALT

    Refused
  • Plumbing

    Plumbing - Make interior alteration to change from Place of Worshop to Montessouri School.

    Applied Mar 27, 2017 · issued May 12, 2017 · Permit 17 134738 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Make interior alteration to change from Place of Worshop to Montessori School.

    Applied Mar 27, 2017 · issued Sep 11, 2017 · completed Apr 23, 2018 · Permit 17 134738 BLD

    Closed
  • Heating and ventilation

    HVAC - Make interior alteration to change from Place of Worshop to Montessouri School.

    Applied Mar 27, 2017 · issued May 12, 2017 · completed Jul 3, 2026 · Permit 17 134738 HVA

    Closed
  • Addition or alteration · Multiple projects

    Proposal to renovate existing church, add a new sanctuary to the south and new apartments to the north and above and conversion of the basement to an underground parking garage.

    Applied Jun 22, 2015 · completed Mar 14, 2017 · 30 homes added · Permit 15 178483 BLD

    Cancelled
  • Plumbing

    Plumbing - Proposal to renovate existing church, add a new sanctuary to the south and new apartments to the north and above and conversion of the basement to an underground parking garage.

    Applied Jun 22, 2015 · completed Mar 14, 2017 · Permit 15 178483 PLB

    Cancelled
  • Heating and ventilation

    HVAC - Proposal to renovate existing church, add a new sanctuary to the south and new apartments to the north and above and conversion of the basement to an underground parking garage.

    Applied Jun 22, 2015 · completed Mar 14, 2017 · Permit 15 178483 HVA

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 40 Mimico Ave · Minor variance

    To maintain an existing enclosed porch and parking space located in the front yard.

    210 m away · filed Sep 10, 2024 · Approved

  • 120 Wheatfield Rd · Minor variance

    To permit a soft landscaping deficiency in the rear yard.

    70 m away · filed Oct 12, 2023 · Refused

  • 63 Queens Ave · Minor variance

    To construct a one-storey front addition, a second and third storey addition above the existing dwelling and to convert the basement into a secondary suite.

    230 m away · filed Mar 6, 2023 · Approved

  • 92 George St · Minor variance

    To legalize and maintain the existing driveway. A previous Committee of Adjustment application (A0359/18EYK) approved variances related to side yard setback and parking space location.

    240 m away · filed Jan 3, 2023 · Approved

  • 61 Queens Ave · Minor variance

    To construct a one-storey rear addition and a two-storey addition above the existing dwelling. The existing detached garage in the rear yard will be maintained.

    230 m away · filed Oct 20, 2022 · Approved

  • 37 Elizabeth St · Minor variance

    To construct a new detached dwelling with an attached garage.

    180 m away · filed Apr 26, 2022 · Approved

  • 132 Queens Ave · Minor variance

    To construct a one-storey rear addition with a new rear deck.

    140 m away · filed Jan 17, 2022 · Approved

  • 98 George St · Minor variance

    To construct a two-storey rear addition, a second storey addition above the existing dwelling, a new front porch and a rear yard deck with a basement walk-out.

    220 m away · filed Sep 30, 2021 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.