Toronto address · Ward 13, Toronto Centre
20 Front St W
The City of Toronto has 10 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Heating and ventilation
HVAC - Using modular partitions to create temporary classrooms in a previously open concept office
Applied Aug 25, 2022 · completed Nov 3, 2022 · Permit 22 186647 HVA
- Cancelled
Addition or alteration · Interior alterations
Proposal for interior alterations to convert existing office uses on the 2nd to 14th floor levels to proposed post-secondary school uses for new tenant - 'George Brown College'. GBC will be using modular partitions to create temporary classrooms & will be the only tenant on floors 2-14. (GBC will be using this space temporarily due to a fire at one of GBC's buildings. Partitions will be removed when their lease is up and they move back into their building.)
Applied Aug 5, 2022 · completed Nov 3, 2022 · Permit 22 186647 BLD
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to the storage area of an existing restaurant - "The Bottom Line".Convenience addres is 22 Front St W
Applied Nov 7, 2017 · issued Dec 11, 2017 · completed Feb 28, 2019 · Permit 17 258904 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to unit 200 in existing office - "Brookfield Global Integrated Solutions" Convenience address is 22 Front St W.
Applied Aug 10, 2015 · issued Aug 24, 2015 · completed Nov 24, 2025 · Permit 15 204366 HVA
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to unit 200 in existing office - "Brookfield Global Integrated Solutions" Convenience address is 22 Front St W.
Applied Aug 10, 2015 · issued Aug 20, 2015 · Permit 15 204366 BLD
- Closed
Addition or alteration · Interior alterations
Interior alterations on floor 3, scope of work includes minor architectural, mechanical, and electrical work.
Applied Jul 23, 2014 · issued Aug 8, 2014 · completed Mar 28, 2018 · Permit 14 195667 BLD
- Closed
Heating and ventilation
HVAC - Interior alterations on floor 3, scope of work includes minor architectural, mechanical, and electrical work.
Applied Jul 23, 2014 · issued Aug 8, 2014 · completed Mar 28, 2018 · Permit 14 195667 HVA
- Inspections under way
Heating and ventilation
HVAC - Make alterations to 2nd through 9th floors for modifications to rooftop mechanical equipment.
Applied May 18, 2006 · issued May 29, 2006 · Permit 06 137080 HVA
- Inspections under way
Addition or alteration · Other
Make alterations to 2nd through 9th floors for modifications to rooftop mechanical equipment.
Applied May 18, 2006 · issued May 24, 2006 · Permit 06 137080 BLD
- Closed
Heating and ventilation
HVAC - install registers, grilles & diffusers on 2nd and 14th floors for office use. Tenant: CIBC Tech & OPS HISTORICAL -(also includes 22 front st w) Cost included in BP02-175324(not yet)
Applied Sep 23, 2002 · issued Nov 4, 2002 · completed Apr 11, 2023 · Permit 02 175324 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
40 storeys · 480 homes · Mixed use
20 m away · Site plan · Under appeal · filed Aug 9, 2023
- Approved
- Under review
187-199 Bay Street, 18-30 Wellington Street West and 3 other streets
64 storeys · Residential
160 m away · Site plan · Under review · filed Aug 26, 2021
- Under review
60 storeys · 256 homes · Mixed use
160 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
65 storeys · 649 homes · Mixed use
170 m away · Site plan · Under review · filed Apr 7, 2025
- Under review
68 storeys · 836 homes · Residential
180 m away · Rezoning · Under review · filed Oct 21, 2024
Neighbours’ Committee of Adjustment files within 250 m
20 Wellington St E · Consent
To obtain consent to sever a portion of the land for the purpose of a lot addition and to create new easements/rights-of-ways (some stratified).
190 m away · filed Apr 16, 2025 · Approved
200 Bay St · Minor variance
To expand the existing mezzanine floor located on the 12 ½ floor level of the North Tower within the existing 26-storey commercial office building to provide additional office space.
160 m away · filed Feb 5, 2020 · Application withdrawn
141 Bay St · Minor variance
To alter the development plan approved under Site Specific By-Law 1104-2016 permitting the construction of a 50 storey office building with a seven-storey retail podium by altering the building envelope, podium and parapet height, mechanical penthouse height and roof coverage, parking space quantity and size, and the P1 level vehicular ramp.
120 m away · filed Oct 31, 2019 · Approved
55 Yonge St · Minor variance
To convert vacant office space into a medical/dental office on the ground floor of the existing twelve-storey commercial and retail building.
200 m away · filed Jul 31, 2019 · Approved
22 The Esplanade · Minor variance
To modify the redevelopment proposal approved under Site-specific By-law 26-2007(OMB) for a mixed use development with two residential condominium towers and retail uses at grade by obstructing the required continuous weather protection feature through the construction of an outdoor patio associated with the existing eating establishment along The Esplanade frontage.
220 m away · filed Dec 12, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.