Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

200 Victoria St

The City of Toronto has 9 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Other

    Proposal to install one new 3 inch floor drain in the 45th Floor Mechanical Room

    Applied Jan 20, 2026 · issued Jan 23, 2026 · completed Mar 9, 2026 · Permit 26 106990 PSA

    Closed
  • Addition or alteration · Interior alterations

    Proposal to remove 2 Fluid Coolers, and replace with 4 Fluid Coolers, Heat Exchangers, Pumps, Expansion Tanks.

    Applied Dec 15, 2025 · issued Sep 15, 2026 · Permit 25 266294 BLD

    Permit issued
  • Heating and ventilation · HVAC: other group C buildings

    Proposal to remove 2 Fluid Coolers, and replace with 4 Fluid Coolers, Heat Exchangers, Pumps, Expansion Tanks

    Applied Oct 14, 2025 · issued Dec 29, 2025 · Permit 25 239212 MSA

    Inspections under way
  • Plumbing

    Plumbing - Interior alteratios to 5th floor of existing hotel/condo building to convert existing spa into 10 hotel suites. Pantages Hotel. See active interior alterations/demo 17 224289 BLD.

    Applied Nov 7, 2017 · issued Dec 15, 2017 · Permit 17 259164 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alteratios to 5th floor of existing hotel/condo building to convert existing spa into 10 hotel suites. Pantages Hotel. See active interior alterations/demo 17 224289 BLD.

    Applied Nov 7, 2017 · issued Dec 15, 2017 · completed May 31, 2019 · Permit 17 259164 HVA

    Closed
  • Addition or alteration · Interior alterations

    Interior alteratios to 5th floor of existing hotel/condo building to convert existing spa into 10 hotel suites. Pantages Hotel. See active interior alterations/demo 17 224289 BLD.

    Applied Nov 7, 2017 · issued Apr 19, 2018 · completed Jun 6, 2019 · Permit 17 259164 BLD

    Closed
  • Addition or alteration · Interior demolition

    Proposed interior demolition to portion of the existing spa on the 5th floor. This permit is for demolition only.

    Applied Aug 28, 2017 · issued Sep 21, 2017 · completed May 31, 2019 · Permit 17 224289 BLD

    Closed
  • Addition or alteration · Other

    Alter plans as approved under file 05 - 167488 by changing occupant load to conference room on 3rd floor to 335.

    Applied Aug 17, 2005 · issued Aug 18, 2005 · Permit 05 167488 BLD (revision 01)

    Revision issued
  • Addition or alteration · Other

    Occupant load increase to conference room on 3rd floor to 360 people.

    Applied Aug 4, 2005 · issued Aug 8, 2005 · Permit 05 167488 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 56-66 Bond Street

    6 storeys · Residential

    70 m away · Site plan · Under review · filed Dec 1, 2021

    Under review
  • 239-247 Yonge Street

    67 storeys · 774 homes · Mixed use

    90 m away · Site plan · Under review · filed Jan 8, 2025

    Under review
  • 237 Victoria Street

    24 storeys · 256 homes · Residential

    110 m away · Site plan · Under review · filed Sep 1, 2022

    Under review
  • 15 Richmond Street East

    71 storeys · 565 homes · Mixed use

    120 m away · Site plan · Under review · filed Sep 16, 2022

    Under review
  • 33 Dundas Street East

    Residential

    160 m away · Condominium · Under review · filed Oct 1, 2025

    Under review
  • 483-491 Bay Street and 20 Albert Street

    Not stated in the file

    270 m away · Subdivision · Under review · filed Sep 24, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 30 Bond St · Minor variance

    To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).

    150 m away · filed Nov 14, 2025 · Approved

  • 247 Yonge St · Minor variance

    To permit a place of amusement (arcade) use on this subject lot.

    90 m away · filed Aug 9, 2024 · Approved

  • 244 Church St · Minor variance

    To alter the development standards (approved by Site Specific Zoning By-law 517-2021 and 518-2021), for a 52-storey mixed-use building, with four levels of underground parking, by reducing the required retail/visitor parking spaces.

    220 m away · filed Oct 17, 2023 · Approved

  • 244 Church St · Consent

    To obtain consent to create a new easement/right-of-way for pedestrian access.

    220 m away · filed Feb 27, 2023 · Approved

  • 65 Dundas St E · Minor variance

    To convert the existing hotel building into an apartment building with a total of 280 affordable housing units.

    180 m away · filed Aug 16, 2022 · Approved

  • 15 Shuter St · Minor variance

    To alter, the historic Massey Hall concert venue, by constructing, an eight storey rear addition with passerelles, along the east and west elevations of the building.

    60 m away · filed Mar 27, 2018 · Approved

  • 2 Queen St W · Minor variance

    To alter the two 6 ½-storey buildings by constructing: a one-storey addition which will contain office and retail use, a green roof, and to remove the metal over-cladding from the buildings.

    220 m away · filed Apr 6, 2017 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.