Toronto address · Ward 10, Spadina-Fort York
208 Niagara St
The City of Toronto has 43 building permits since 2017 (12 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Plumbing · Other
Interior alteration to existing master bathroom. Replace existing Kitec water distribution and plumbing rough-ins in existing fixture locations only. No fixture relocation. No structural wall removal. No slab cutting. Plumbing rough-in to be inspected prior to closing walls.
Applied Jul 13, 2026 · issued Aug 11, 2026 · Permit 26 200867 PSA
- Permit issued
Addition or alteration · Re-Roofing/Re-Cladding
Proposal to remove existing exterior cladding system and install new EIFS wall assembly including air/water barrier, insulation, flashings, trims, sealants and associated exterior building envelope rehabilitation work.
Applied May 20, 2026 · issued Jun 18, 2026 · Permit 26 163393 BLD
- Closed
Plumbing · Other
Proposal to replace kitech piping.
Applied May 8, 2026 · issued May 13, 2026 · completed Jun 4, 2026 · Permit 26 157603 PSA
- Closed
Plumbing · Other
Proposal to replace kitech piping.
Applied May 6, 2026 · issued May 7, 2026 · completed May 14, 2026 · Permit 26 156169 PSA
- Closed
Plumbing · Other
Kitec pipe replacement to Unit 6 in existing residential townhouse
Applied Feb 4, 2026 · issued Feb 10, 2026 · completed Feb 20, 2026 · Permit 26 113202 PSA
- Cancelled
Plumbing · Other
Proposal for replacement of kitec plumbing, exact replacement of current plumbing, no new fixtures added.
Applied Jun 10, 2025 · completed Jun 30, 2025 · Permit 25 175266 PSA
- Closed
Plumbing · Piping: other buildings
Proposal to replace the kitec plumbing (pipe) in existing townhouse as part of a condo townhouse complex - UNIT 10
Applied Apr 25, 2024 · issued May 6, 2024 · completed May 31, 2024 · Permit 24 140481 PSA
- Inspections under way
Plumbing · Piping: other buildings
Proposed replacement of in-suite kitec domestic water piping - unit 38.
Applied Mar 13, 2024 · issued Apr 5, 2024 · Permit 24 125050 PSA
- Inspections under way
Plumbing · Other
Proposal to replace existing piping with Kitec piping
Applied Feb 13, 2023 · issued Feb 24, 2023 · Permit 23 113483 PSA
- Inspections under way
Plumbing · Piping: other buildings
Proposed replacement of the exisiting kitec piping serving the suite with uponor aquapex.
Applied Dec 13, 2022 · issued Jan 9, 2023 · Permit 22 239223 PSA
- Closed
Plumbing · Other
Replacement of KTEC plumbing
Applied Aug 2, 2022 · issued Aug 12, 2022 · completed Sep 6, 2022 · Permit 22 184899 PSA
- Closed
Plumbing · Other
Replacement of domestic, in-suite Kitec piping with Uponor piping.
Applied May 19, 2022 · issued Jul 27, 2022 · completed Aug 31, 2022 · Permit 22 148766 PSA
Show 31 more permits
- Revocation pending
Plumbing · Piping: other buildings
Replacement of kitec plumbing (pipe) in existing townhouse - Unit 10
Applied May 2, 2022 · issued May 11, 2022 · Permit 22 140593 PSA
- Closed
Plumbing · Other
Proposal to replace insuite domestic Kitec piping with Uponor Piping.
Applied Feb 16, 2022 · issued Mar 3, 2022 · completed Mar 28, 2022 · Permit 22 114749 PSA
- Closed
Plumbing · Other
Proposal for the replace of existing kitec piping with uponor piping
Applied Aug 7, 2021 · issued Aug 26, 2021 · completed Sep 8, 2021 · Permit 21 195022 PSA
- Closed
Plumbing · Piping: SFD/Semi
Replace in-suite kite plumbing to Townhouse unit 92
Applied Jul 24, 2021 · issued Aug 16, 2021 · completed Dec 2, 2021 · Permit 21 189164 PSA
- Closed
Plumbing · Fixtures/Roof Drains: SFD
To replace existing plumbing fixtures in kitchen and main bathroom, new bar sink on roof top patio - Unit 70
Applied May 25, 2021 · issued Jun 2, 2021 · completed Jan 28, 2022 · Permit 21 160033 PSA
- Inspections under way
Plumbing · Other
Proposal for the replacement of insute kitec piping.
Applied May 18, 2021 · issued Jun 4, 2021 · Permit 21 156447 PSA
- Closed
Plumbing · Other
Proposal to replace the kitec piping with Uponor piping in an existing townhouse as part of a larger complex. Plumbing fixtures to remain the same - UNIT 19
Applied Apr 15, 2021 · issued May 3, 2021 · completed Jul 31, 2021 · Permit 21 141022 PSA
- Closed
Plumbing · Piping: SFD/Semi
Proposed to replace in-suite Kitec with uponor pex piping in existing Condo Townhouse.
Applied Mar 15, 2021 · issued Mar 23, 2021 · completed Apr 4, 2021 · Permit 21 127450 PSA
- Closed
Plumbing · Piping: SFD/Semi
Proposal to replace the kitec plumbing installed in unit 7.
Applied Feb 1, 2021 · issued Feb 10, 2021 · completed Feb 18, 2021 · Permit 21 111341 PSA
- Closed
Plumbing · Piping: SFD/Semi
replace kitec plumbing within house
Applied Oct 21, 2020 · issued Oct 26, 2020 · completed Nov 23, 2020 · Permit 20 209369 PSA
- Inspections under way
Plumbing · Fixtures/Roof Drains: other
Proposal to replace all Kitec piping with Uponor piping in an existing residential townhouse as part of a condo complex - UNIT 85
Applied Oct 6, 2020 · issued Oct 15, 2020 · Permit 20 203355 PSA
- Closed
Plumbing · Piping: SFD/Semi
Replacement of kitec piping in the existing townhouse complex, Unit 50
Applied Oct 1, 2020 · issued Oct 7, 2020 · completed Jul 13, 2026 · Permit 20 201260 PSA
- Closed
Plumbing · Other
Proposed to replace Kitec Plumbing for unit 82
Applied Feb 12, 2020 · issued Feb 26, 2020 · completed Jul 24, 2026 · Permit 20 115118 PSA
- Closed
Plumbing · Piping: SFD/Semi
Proposal for KITEC plumbing replacement
Applied Jan 27, 2020 · issued Mar 2, 2020 · completed Aug 12, 2020 · Permit 20 108985 PSA
- Revocation pending
Plumbing · Piping: SFD/Semi
Proposal to replace kitec plumbing in existing sfd-townhouse.
Applied Jan 24, 2020 · issued Jan 27, 2020 · Permit 20 108574 PSA
- Closed
Plumbing · Other
Proposal for replacement of kitec piping for unit 13 in the existing townhouse complex
Applied Nov 7, 2019 · issued Nov 20, 2019 · completed Nov 22, 2019 · Permit 19 246875 PSA
- Closed
Plumbing · Piping: SFD/Semi
Proposal to replace kitec piping in existing single family dwelling townhouse.
Applied Nov 5, 2019 · issued Nov 5, 2019 · completed Nov 14, 2019 · Permit 19 245495 PSA
- Closed
Plumbing · Other
Proposal to replace KITEC Pipes in townhouse unit 104 in the existing townhouse complex.
Applied Sep 26, 2019 · issued Oct 8, 2019 · completed Nov 7, 2019 · Permit 19 227652 PSA
- Closed
Plumbing · Other
Proposal for KITEC Replacement in unit 60 of the existing SFD - Townhouse Complex.
Applied Aug 9, 2019 · issued Aug 22, 2019 · completed Sep 17, 2019 · Permit 19 203451 PSA
- Closed
Plumbing · Other
Proposal to replace KITEC Pipes in unit TH57 in the existing townhouse complex.
Applied Jul 15, 2019 · issued Jul 26, 2019 · completed Aug 1, 2019 · Permit 19 189141 PSA
- Inspections under way
Plumbing · Piping: other buildings
Proposed Kitec plumbing replacement in an existing apartment building condo. unit.
Applied May 21, 2019 · issued Jun 21, 2019 · Permit 19 157011 PSA
- Closed
Plumbing · Piping: SFD/Semi
Proposal to replace kitec piping in unit 71 of existing townhouse development.
Applied Mar 20, 2019 · issued Apr 2, 2019 · completed Apr 18, 2019 · Permit 19 128155 PSA
- Inspections under way
Plumbing · Piping: other buildings
Remove all hot and cold kitec lines and replace with new pex lines
Applied Dec 12, 2018 · issued Jan 7, 2019 · Permit 18 267551 PSA
- Closed
Small residential project · Interior alterations
Proposal for interior alterations to the ground and 2nd floor of the existing single family dwelling, work to take place in condo unit 114.
Applied Dec 6, 2018 · issued Jan 2, 2019 · completed Feb 12, 2019 · Permit 18 265394 BLD
- Cancelled
Plumbing · Other
Proposal to replace ki-tec pipes with Uponor AquaPEX® polyethylene cross linked (PEX) tubing and Uponor ProPex® fittings system.
Applied Sep 11, 2018 · issued Sep 24, 2018 · completed Nov 10, 2025 · Permit 18 223527 PSA
- Closed
Plumbing · Piping: other buildings
Replacement of kitec plumbing (pipe) in existing townhouse - Unit 103
Applied Nov 14, 2017 · issued Nov 16, 2017 · completed Dec 1, 2017 · Permit 17 262315 PSA
- Inspections under way
Plumbing · Piping: SFD/Semi
Remove existing KITEC piping water pipes included in bathrooms, kitchen and laundry room. Reinstall all plumbing with copper pipes for all areas
Applied Jan 25, 2017 · issued Jan 30, 2017 · Permit 17 108671 PSA
- Cancelled
Drains and site services · Inside and outside drains
Proposal to install 1/2 sanitary/ 50" piping
Applied Oct 31, 2016 · completed Aug 14, 2020 · Permit 16 245051 STS
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposal to install a back flow prevention device in the existing townhouse complex.
Applied Mar 25, 2014 · issued Mar 27, 2014 · completed May 30, 2017 · Permit 14 132849 PSA
- Inspections under way
Plumbing
Plumbing - Interior alteratiions to repair fire damage in suite 8 of existing rowhouse. Prop manager - Abbey - 416-846-5366MRDD FEES
Applied Dec 23, 2009 · issued Dec 23, 2009 · Permit 09 179982 PLB
- Inspections under way
Small residential project · Interior alterations
Interior alteratins to repair fire damage in suite 8 of existing rowhouse. Prop manager - Abbey - 416-846-5366MRDD FEES
Applied Oct 19, 2009 · issued Oct 28, 2009 · Permit 09 179982 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Refused
18 storeys · 342 homes · Mixed use
90 m away · Site plan · Refused · filed Aug 11, 2023
- Under review
125-133 Niagara Street and 2 Tecumseth Street
40 storeys · 1,225 homes · Mixed use
300 m away · Site plan · Under review · filed Nov 19, 2021
- Under review
18 storeys · Not stated in the file
320 m away · Site plan · Under review · filed Oct 11, 2022
- Under review
21 storeys · 166 homes · Mixed use
340 m away · Site plan · Under review · filed Sep 15, 2022
- Under review
13 storeys · Mixed use
360 m away · Site plan · Under review · filed Dec 24, 2021
- Approved
938-950 King Street West and 95-99 Strachan Avenue
18 storeys · 229 homes · Mixed use
380 m away · Site plan · Approved · filed Aug 4, 2021
Neighbours’ Committee of Adjustment files within 250 m
823 Adelaide St W · Minor variance
To construct a new three-and-one-half-storey semi-detached houseplex (duplex) with a front porch with stairs, a front basement entrance with stairs, a rear ground floor deck with stairs, and a rear fourth storey rooftop deck platform. Also, to construct a new one-storey ancillary building (detached garage containing an undersized parking space with a green roof) in the rear yard, with vehicular access from the abutting public lane (Stanley Terrace) along the (side) east lot line. There will be a total of two dwelling units on this lot.
240 m away · filed Apr 27, 2026 · Approved
734 Adelaide St W · Minor variance
To construct a new one-storey ancillary building (to contain a yoga studio), in the rear yard of the existing two-storey townhouse dwelling. This new ancillary building will not be used for habitable space. The existing rear storage shed will be demolished.
130 m away · filed Sep 29, 2025 · Approved
5 Stanley Ave · Minor variance
To legalize and maintain the conversion of the row house into a townhouse with two dwelling units, as well as a portion of the rear second storey deck (while removing/reducing a portion of the existing deck depth) which was constructed without an authorized building permit on the existing two-storey dwelling (maintaining the third storey loft). There will be a total of two residential dwelling units on this lot (one unit occupying the first level, and one unit occupying the second level and third level loft area.
90 m away · filed Aug 14, 2025 · Approved
115 Walnut Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear second-storey addition with a deck, and a complete third storey addition with a front deck and a rooftop deck. There will be a total of two residential dwelling units on this lot (one unit to occupy the basement and ground levels, and one unit to occupy the second and third levels).
120 m away · filed Mar 7, 2025 · Approved
677 Wellington St W · Minor variance
To legalize and to maintain the location of the prefabricated building (Building 1), abutting Wellington Street West.
230 m away · filed Feb 5, 2025 · Approved
793 Adelaide St W · Minor variance
To construct a new three-storey detached dwelling (triplex) with a covered front porch with stairs, a rear ground floor deck with stairs, a rear second floor balcony, a rear third floor balcony, and a front basement walkout. There will be a total of three dwelling units on the lot.
160 m away · filed Nov 4, 2024 · Approved
49 Michener Crt · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a new rear elevated deck (above the ground floor walkout area).
230 m away · filed Jul 5, 2024 · Approved
791 Adelaide St W · Minor variance
To construct a new four-storey, attached apartment building with front balconies (located on the ground floor, second floor, and third floor), a fourth floor rooftop deck, and front and rear canopies. There will be a total of four residential dwelling units on this site.
150 m away · filed Jun 7, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.