Toronto address · Ward 13, Toronto Centre
209 Victoria St
Keenan Research Centre
The City of Toronto has 28 building permits since 2017 (10 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Renovations to existing storage space to create new procedure space including new architectural finishes, mechanical, electrical and fire protection distribution
Applied Sep 9, 2024 · issued Sep 19, 2024 · completed Dec 16, 2025 · Permit 24 210024 HVA
- Closed
Addition or alteration · Interior alterations
Renovations to existing storage space to create new procedure space including new architectural finishes, mechanical, electrical and fire protection distribution
Applied Sep 9, 2024 · issued Sep 12, 2024 · completed Dec 18, 2025 · Permit 24 210024 BLD
- Closed
Plumbing
Plumbing - Renovations to existing storage space to create new procedure space including new architectural finishes, mechanical, electrical and fire protection distribution
Applied Sep 9, 2024 · issued Sep 19, 2024 · completed Dec 16, 2025 · Permit 24 210024 PLB
- Inspections under way
Addition or alteration · Interior alterations
Renovation of existing Starbucks space
Applied Jan 30, 2024 · issued Mar 5, 2024 · Permit 24 109633 BLD
- Inspections under way
Plumbing
Plumbing - Renovation of existing Starbucks space
Applied Jan 30, 2024 · issued Mar 14, 2024 · Permit 24 109633 PLB
- Permit issued
Heating and ventilation
HVAC - Renovation of existing Starbucks space
Applied Jan 30, 2024 · issued Mar 14, 2024 · Permit 24 109633 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alteration to refit research lab.
Applied Feb 22, 2022 · issued Mar 7, 2022 · completed Mar 28, 2023 · Permit 22 116250 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alteration to accommodate new research labs.
Applied Feb 22, 2022 · issued Mar 25, 2022 · completed Mar 17, 2023 · Permit 22 116250 HVA
- Inspections under way
Plumbing
Plumbing - Proposal for interior alteration to accommodate new research labs.
Applied Feb 22, 2022 · issued Mar 25, 2022 · Permit 22 116250 PLB
- Closed
Heating and ventilation
Revision 01. HVAC - New steam line PRV station - lvl B1 and P1
Applied Feb 8, 2022 · issued Mar 18, 2022 · completed Jan 20, 2023 · Permit 21 248737 HVA (revision 01)
- Closed
Heating and ventilation
HVAC - New steam line PRV station - lvl B1 and P1
Applied Dec 15, 2021 · issued Jan 13, 2022 · completed Jan 20, 2023 · Permit 21 248737 HVA
- Closed
Addition or alteration · Interior alterations
New steam line PRV station - lvl B1 and P1
Applied Dec 15, 2021 · issued Jan 4, 2022 · completed Jan 11, 2023 · Permit 21 248737 BLD
Show 16 more permits
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to the entrance area of the ground floor of existing hospital. St. Michael's Hospital.
Applied Aug 4, 2017 · issued Sep 18, 2017 · completed Jun 20, 2025 · Permit 17 211210 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to the entrance area of the ground floor of existing hospital. St. Michael's Hospital.
Applied Aug 4, 2017 · issued Sep 18, 2017 · completed Jun 24, 2025 · Permit 17 211210 HVA
- Cancelled
Designated structure · Sign building permit related
To erect and display a static copy illuminated ground sign at the westerly frontage of the property in conjunction with an existing parking facility within St Michael's Hospital. **St Mikes Hospital**
Applied Apr 10, 2013 · completed Oct 16, 2018 · Permit 13 147648 DST
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to ground floor unit for new cafeteria, greater than 30 seats in existing hospital.
Applied Aug 17, 2011 · issued Sep 2, 2011 · completed Jun 17, 2025 · Permit 11 258506 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal for interior alterations to ground floor unit for new cafeteria, greater than 30 seats in existing hospital.
Applied Aug 17, 2011 · issued Sep 2, 2011 · Permit 11 258506 HVA
- Closed
New building
REVISION TO EXISTING BUILDING PERMIT - REVISION TO CHANGE PARTITION LAYOUT IN BASEMENT OF NEW HOSPITAL BUILDING - SIMULATION CENTRE.Proposal to construct a new nine-storey hospital building with below grade parking (in conjunction to St. Michael's Hospital). Office, Admin., & Research Building. 26 & 38 Shuter Street, 209 Victoria Street and portion of Victoria Street Lane. Also, demolish an existing three-storey parking garage and office building. See Final & Binding - A0307/06TEY
Applied Feb 25, 2011 · issued Mar 4, 2011 · completed Jul 21, 2026 · Permit 07 114980 BLD (revision 02)
- Revision issued
Heating and ventilation
REVISION TO HVAC PERMIT DO TO CHANGES IN BUILDING PERMIT - REVISIONS IN BASEMENTHVAC - SEE BUILDING PERMIT FILE FOR PLANS AND OTHER REVIEW INFORMATIONProposal to construct a new nine-storey hospital building with below grade parking (in conjunction to St. Michael's Hospital). Office, Admin., & Research Building. 26 & 38 Shuter Street, 209 Victoria Street and portion of Victoria Street Lane. Also, demolish an existing three-storey parking garage and office building. See Final & Binding - A0307/06TEY
Applied Feb 25, 2011 · issued Mar 9, 2011 · Permit 07 114980 HVA (revision 01)
- Application on hold
Fire and security upgrade
FS - Sprinkler Shop Drawing - Permit for pedistrian bridge to connect 209 Victoria with 30 Bond St. Bridge to Cross Shuter Street - See 08 173116 STE 27 SA for Site Plan review, and 08 173110 ZPR for PPR. Please see 07 114980 BLD for building permit for new Hospital wing. Review in conjuction with 07-114980 FSU
Applied Apr 29, 2010 · Permit 09 190866 FSU
- Closed
Addition or alteration · Other
Permit for pedistrian bridge to connect 209 Victoria with 30 Bond St. Bridge to Cross Shuter Street - See 08 173116 STE 27 SA for Site Plan review, and 08 173110 ZPR for PPR. Please see 07 114980 BLD for building permit for new Hospital wing.
Applied Nov 24, 2009 · issued May 4, 2010 · completed Jul 21, 2026 · Permit 09 190866 BLD
- Closed
Fire and security upgrade · Electromagnetic locks
Permit for 16 maglocks - throughout the building
Applied Jun 20, 2008 · issued Jul 4, 2008 · completed Jul 17, 2026 · Permit 08 173198 FSU
- Closed
New building
Revision for 2nd phase of shoring to allow construction of Lika Shing Knowledge Institute of St Michaels Hospital (Research & Education Facility)
Applied Jan 21, 2008 · issued Jan 24, 2008 · completed Jul 21, 2026 · Permit 07 114980 BLD (revision 01)
- Inspections under way
Plumbing
SEE BUILDING PERMIT FILE FOR PLANS Plumbing - Proposal to construct a new nine-storey hospital building with below grade parking (in conjunction to St. Michael's Hospital). Office, Admin., & Research Building. 26 & 38 Shuter Street, 209 Victoria Street and portion of Victoria Street Lane. Also, demolish an existing three-storey parking garage and office building. See Final & Binding - A0307/06TEY
Applied Jan 11, 2008 · issued Jan 15, 2008 · Permit 07 114980 PLB
- Inspections under way
Drains and site services
Drain - Proposal to construct a new nine-storey hospital building with below grade parking (in conjunction to St. Michael's Hospital). Office, Admin., & Research Building. 26 & 38 Shuter Street, 209 Victoria Street and portion of Victoria Street Lane. Also, demolish an existing three-storey parking garage and office building. See Final & Binding - A0307/06TEY
Applied Jan 11, 2008 · issued Jan 15, 2008 · Permit 07 114980 DRN
- Closed
Demolition
Demolition of 2 existing 6 storey buildings operated as Offices/Research Facilities, known as #209 Victoria St on North East corner of Victoria and Shuter and #26 and #38 Shuter St ( under 1 building) on North side of Shuter.
Applied May 16, 2007 · issued Jun 19, 2007 · completed Jun 17, 2025 · Permit 07 217851 DEM
- Closed
New building
Proposal to construct a new nine-storey hospital building with below grade parking (in conjunction to St. Michael's Hospital). Office, Admin., & Research Building. 26 & 38 Shuter Street, 209 Victoria Street and portion of Victoria Street Lane. Also, demolish an existing three-storey parking garage and office building. See Final & Binding - A0307/06TEY
Applied Mar 12, 2007 · issued Jan 15, 2008 · completed Jul 21, 2026 · Permit 07 114980 BLD
- Inspections under way
Heating and ventilation
REVISION TO HVAC PERMIT DO TO CHANGES IN BUILDING PERMIT - REVISIONS IN BASEMENTHVAC - SEE BUILDING PERMIT FILE FOR PLANS AND OTHER REVIEW INFORMATIONProposal to construct a new nine-storey hospital building with below grade parking (in conjunction to St. Michael's Hospital). Office, Admin., & Research Building. 26 & 38 Shuter Street, 209 Victoria Street and portion of Victoria Street Lane. Also, demolish an existing three-storey parking garage and office building. See Final & Binding - A0307/06TEY
Applied Mar 12, 2007 · issued Jan 15, 2008 · Permit 07 114980 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
- Under review
24 storeys · 256 homes · Residential
80 m away · Site plan · Under review · filed Sep 1, 2022
- Under review
67 storeys · 774 homes · Mixed use
110 m away · Site plan · Under review · filed Jan 8, 2025
- Under review
- Under review
71 storeys · 565 homes · Mixed use
150 m away · Site plan · Under review · filed Sep 16, 2022
- Approved
53 storeys · 591 homes · Mixed use
240 m away · Site plan · Approved · filed Aug 31, 2021
Neighbours’ Committee of Adjustment files within 250 m
30 Bond St · Minor variance
To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).
170 m away · filed Nov 14, 2025 · Approved
247 Yonge St · Minor variance
To permit a place of amusement (arcade) use on this subject lot.
110 m away · filed Aug 9, 2024 · Approved
244 Church St · Minor variance
To alter the development standards (approved by Site Specific Zoning By-law 517-2021 and 518-2021), for a 52-storey mixed-use building, with four levels of underground parking, by reducing the required retail/visitor parking spaces.
170 m away · filed Oct 17, 2023 · Approved
244 Church St · Consent
To obtain consent to create a new easement/right-of-way for pedestrian access.
170 m away · filed Feb 27, 2023 · Approved
65 Dundas St E · Minor variance
To convert the existing hotel building into an apartment building with a total of 280 affordable housing units.
130 m away · filed Aug 16, 2022 · Approved
111 Bond St · Minor variance
To construct a new five-storey administrative building associated with Ryerson University.
250 m away · filed May 22, 2020 · Withdrawn
15 Shuter St · Minor variance
To alter, the historic Massey Hall concert venue, by constructing, an eight storey rear addition with passerelles, along the east and west elevations of the building.
100 m away · filed Mar 27, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.