Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

21 Burlington St

The City of Toronto has 5 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - PROPOSED: Interior renovations to create 3 bedroom units on each floor. Separate entrance for ground floor unit created as well in rear of house

    Applied Jun 15, 2020 · issued Jul 8, 2020 · completed Aug 5, 2020 · Permit 17 278260 HVA (revision 01)

    Closed
  • Plumbing

    Plumbing - PROPOSED: Interior renovations to create 3 bedroom units on each floor. Separate entrance for ground floor unit created as well in rear of house

    Applied Dec 21, 2017 · issued Jan 24, 2018 · Permit 17 278260 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - PROPOSED: Interior renovations to create 3 bedroom units on each floor. Separate entrance for ground floor unit created as well in rear of house

    Applied Dec 21, 2017 · issued Jan 24, 2018 · completed Aug 5, 2020 · Permit 17 278260 HVA

    Closed
  • Small residential project · Multiple projects

    PROPOSED: Interior renovations to create 3-bedroom unit on each floor of an existing triplex building. Separate entrance for ground floor unit created as well in the rear of the building.

    Applied Dec 21, 2017 · issued Jan 24, 2018 · completed Aug 5, 2020 · Permit 17 278260 BLD

    Closed
  • Drains and site services · Back water valve (Sewer only)

    Proposal to install back water valve

    Applied Nov 17, 2017 · issued Nov 17, 2017 · completed Dec 8, 2017 · Permit 17 263990 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 47 Victoria St · Minor variance

    To construct a second storey addition above the existing dwelling and to create a new dwelling unit in the basement. The altered dwelling will be a duplex.

    90 m away · filed Apr 4, 2025 · Deferred

  • 21 Louisa St · Minor variance

    To construct a third floor addition in order to accommodate four additional dwelling units that will create a total of 10 dwelling units within the existing building.

    190 m away · filed Jan 25, 2024 · Approved

  • 24 Stanley Ave · Minor variance

    To construct a rear sun room addition.

    110 m away · filed Sep 6, 2023 · Approved

  • 2300 Lake Shore Blvd W · Minor variance

    To permit a temporary vehicle parking lot. A previous Committee of Adjustment application (A0518/17EYK) approved a variance related to permitting a vehicle parking lot.

    130 m away · filed Jun 17, 2022 · Approved

  • 20 Louisa St · Minor variance

    To construct a third floor addition. The existing residential unit in the basement will be relocated to the proposed third floor. The existing six residential units will be maintained.

    150 m away · filed Aug 19, 2020 · Approved

  • 19 Burlington St · Minor variance

    To construct a new duplex.

    0 m away · filed Jun 21, 2019 · Approved

  • 2308 Lake Shore Blvd W · Minor variance

    To construct a south-side addition to the existing one-storey building.

    80 m away · filed May 10, 2018 · Approved

  • 2300 Lake Shore Blvd W · Minor variance

    To permit a temporary vehicle parking lot.

    130 m away · filed Jun 8, 2017 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.