Toronto address · Ward 15, Don Valley West
225 Redpath Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Demolition
Proposal to demolish existing semi-detached house.
Applied Dec 1, 2020 · issued Apr 6, 2021 · completed Feb 9, 2026 · 2 homes removed · Permit 20 224527 DEM
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
5 storeys · Not stated in the file
50 m away · Site plan · Under review · filed Feb 3, 2026
- Under review
36 storeys · 86 homes · Not stated in the file
90 m away · Condominium · Under review · filed Oct 19, 2021
- Under review
31 storeys · 322 homes · Residential
100 m away · Site plan · Under review · filed Apr 6, 2022
- Approved
- Under review
36 storeys · 86 homes · Not stated in the file
130 m away · Condominium · Under review · filed Nov 4, 2021
- Under review
35 storeys · 377 homes · Residential
200 m away · Site plan · Under review · filed Sep 19, 2022
Neighbours’ Committee of Adjustment files within 250 m
170 Roehampton Ave · Minor variance
To alter the development standards for the 50-storey mixed-use building (approved under Site-Specific Zoning By-law 1133-2023) by permitting a non-residential use (eating establishment/take-out eating establishment with an outdoor patio abutting Redpath Avenue) at-grade and increasing the total number of small vehicle parking spaces to 8 parking spaces. This building will contain 599 residential dwelling units including 15 rental replacement units.
190 m away · filed Feb 9, 2026 · Approved
241 Redpath Ave · Minor variance
To alter the development standards (as approved through Site-Specific By-law No. 82-2023(OLT)) for the proposed 43-storey apartment building, to increase the gross floor area, building height, and number of storeys, and to permit encroachments into the required side yard setbacks and encroachments above the maximum building height, as well as to reduce the required amenity space and parking space rates. Please note a previous Minor Variance application (File No. A0163/25NY) for the subject property was before the Committee of Adjustment on June 12, 2025, which was approved on condition.
60 m away · filed Jan 19, 2026 · Approved
110 Broadway Ave · Minor variance
To permit the reduction in the required number of residential parking spaces and remove the requirement for a non-residential parking space(s).
50 m away · filed Sep 23, 2025 · Application withdrawn
220 Redpath Ave · Minor variance
To convert the existing amenity space into apartments within the existing building.
60 m away · filed Jun 20, 2025 · Deferred
241 Redpath Ave · Minor variance
To increase gross floor area, encroachments to side yard setback, building height and number of storeys, and reduce parking space and the amenity space per dwelling.
60 m away · filed Apr 9, 2025 · Approved
120 Broadway Ave · Minor variance
To request relief from parking space size requirements and reduce the indoor amenity space requirement.
80 m away · filed Apr 9, 2025 · Approved
117 Broadway Ave · Minor variance
To permit 21 undersized parking spaces within the existing 39-storey building (North Tower) and the 38-storey building (South Tower) on this lot (as approved under Site Specific By-Law 974-2020(LPAT), and as amended by Minor Variance Decision Number A1140/22TEY), which is currently under construction. There will be a total of 258 parking spaces on-site (246 residential parking spaces and 12 visitor parking spaces).
110 m away · filed Oct 3, 2024 · Approved
110 Broadway Ave · Consent
To obtain a delegated consent to create a number of easements on the property. This is a Delegated Consent, there is no public hearing.
50 m away · filed Aug 7, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.