Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 21, Scarborough Centre

2388 Eglinton Ave E

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Revision 01 - Relocating of existing furnace and interior alterations revision as per bubbled drawings.Proposal for interior alterations for new medical office and pharmacy on ground floor of existing multiple unit building.

    Applied May 22, 2018 · issued Jun 18, 2018 · completed Aug 31, 2018 · Permit 18 128255 BLD (revision 01)

    Closed
  • Heating and ventilation

    Revision 01 - Relocating of existing furnace and interior alterations revision as per bubbled drawings.HVAC - Proposal for interior alterations for new medical office and pharmacy on ground floor of existing multiple unit building.

    Applied May 22, 2018 · issued Jun 18, 2018 · completed Sep 21, 2018 · Permit 18 128255 HVA (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations for new medical office and pharmacy on ground floor of existing multiple unit building.

    Applied Mar 12, 2018 · issued Apr 20, 2018 · completed Aug 31, 2018 · Permit 18 128255 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations for new medical office and pharmacy on ground floor of existing multiple unit building.

    Applied Mar 12, 2018 · issued Apr 24, 2018 · completed Sep 21, 2018 · Permit 18 128255 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations for new medical office and pharmacy on ground floor of existing multiple unit building.

    Applied Mar 12, 2018 · issued Apr 24, 2018 · completed Feb 22, 2022 · Permit 18 128255 PLB

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 2428 Eglinton Ave E · Consent

    To obtain consent to create an easement/right-of-way. Cross-reference Consent Applications B0012/25SC and B0013/25SC.

    220 m away · filed Mar 7, 2025 · Approved

  • 6 Rensburg Dr · Minor variance

    To demolish the existing dwelling and to construct a new two storey detached dwelling.

    110 m away · filed Jul 29, 2024 · Approved

  • 807 Kennedy Rd · Minor variance

    Interior renovations to add 5 dwelling units to the existing 5-storey building. This application was previously deferred at the June 5th, 2024 hearing.

    240 m away · filed Mar 26, 2024 · Approved

  • 43 Rensburg Dr · Minor variance

    To construct a new two-storey detached dwelling with integral garage.

    230 m away · filed Jun 27, 2021 · Approved

  • 806 Kennedy Rd · Minor variance

    To add vehicle and bicycle parking spaces with exterior alterations to the landscape. To convert existing storage, laundry and parking to residential suites with interior alterations.

    150 m away · filed Apr 30, 2021 · Approved

  • 2416 Eglinton Ave E · Minor variance

    To permit interior alterations to an existing commercial building to allow for two residential dwelling units.

    80 m away · filed Mar 25, 2021 · Approved

  • 2356 Eglinton Ave E · Minor variance

    To permit the construction of two new dwelling units on the ground floor of the existing 5-storey apartment building and a shared outdoor amenity area with the adjacent apartment building located at 2354 Eglinton Ave E.

    230 m away · filed Feb 22, 2019 · Deferred

  • 29 Rensburg Dr · Minor variance

    Proposal to construct a new, two-storey detached house.

    140 m away · filed Dec 7, 2017 · Approved

Everything planned in Scarborough Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.