Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

24 Saybrook Ave

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Construct second strorey addition to the existing bugalow, one storey rear extension and interior renovation. New covered front porch .Added new ground floor 51.64 m2, seond floor 171.52 m2.

    Applied Apr 24, 2019 · issued May 8, 2019 · completed Feb 1, 2021 · Permit 18 271687 HVA

    Closed
  • Plumbing

    Plumbing - Construct second strorey addition to the existing bugalow, one storey rear extension and interior renovation. New covered front porch .Added new ground floor 51.64 m2, seond floor 171.52 m2.

    Applied Dec 23, 2018 · issued Feb 6, 2019 · completed Feb 1, 2021 · Permit 18 271687 PLB

    Closed
  • Small residential project · Multiple projects

    Construct second strorey addition to the existing bugalow, one storey rear extension and interior renovation. New covered front porch .Added new ground floor 51.64 m2, seond floor 171.52 m2.

    Applied Dec 23, 2018 · issued Feb 5, 2019 · completed Feb 1, 2021 · Permit 18 271687 BLD

    Closed
  • Drains and site services

    Drain - Construct second strorey addition to the existing bugalow, one storey rear extension and interior renovation. New covered front porch .Added new ground floor 51.64 m2, seond floor 171.52 m2.

    Applied Dec 23, 2018 · issued Feb 6, 2019 · completed Oct 1, 2020 · Permit 18 271687 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a one-storey rear addition, a new covered front porch and a second storey addition above the existing dwelling.

    Decision: Approved (hearing Jul 18, 2018)

    Filed May 3, 2018 · File A0371/18EYK

    Closed

What’s planned nearby

Development sites within 500 m

  • 1138 Islington Avenue

    6 storeys · Residential

    380 m away · Rezoning · Approved · filed Sep 19, 2022

    Approved
  • 1040-1048 Islington Avenue

    10 storeys · 175 homes · Residential

    490 m away · Site plan · Under review · filed Apr 28, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 11 Stockbridge Ave · Minor variance

    To contrsuct a second storey addition above the existing dwelling, a two-storey south side addition and a new covered rear yard deck.

    170 m away · filed May 6, 2026 · Approved

  • 1081 Islington Ave · Minor variance

    180 m away · filed Feb 23, 2026 · Application withdrawn

  • 1081 Islington Ave · Consent

    180 m away · filed Feb 23, 2026 · Application withdrawn

  • 1081 Islington Ave · Minor variance

    180 m away · filed Feb 23, 2026 · Application withdrawn

  • 134 Lothian Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    110 m away · filed Nov 21, 2024 · Approved

  • 115 Lothian Ave · Minor variance

    To construct a second storey addition.

    70 m away · filed Nov 7, 2024 · Approved

  • 9 Cardigan Rd · Minor variance

    To construct a partial two-storey west side addition, a complete second storey addition above the existing dwelling, a covered front porch, and a covered deck in the rear yard. The altered building will be a duplex.

    120 m away · filed Jul 8, 2024 · Approved

  • 49 Cardigan Rd · Minor variance

    To construct a new detached dwelling with an attached garage, and a deck in the rear yard.

    200 m away · filed Jun 26, 2024 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.