Toronto address · Ward 9, Davenport
241 Bartlett Ave
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Underpinning
Partial underpining of existing concrete deck at rear as a result of construction on 239 Bartlett Ave.
Applied May 8, 2014 · issued May 13, 2014 · completed Feb 21, 2018 · Permit 14 153766 BLD
- Closed
Small residential project · Underpinning
****ADMIN FOR UNDERPINNING 239 Bartlett Ave****
Applied Feb 9, 2012 · issued Feb 10, 2012 · completed Feb 21, 2018 · Permit 12 119910 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Approved
Neighbours’ Committee of Adjustment files within 250 m
195 Hallam St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition with a rear balcony.
120 m away · filed Jan 15, 2026 · Approved
815 Gladstone Ave · Minor variance
To alter the existing two-storey detached dwelling (duplex) by converting the existing front integral garage into habitable space. Also, to install a front yard parking pad (to replace the existing reverse slope driveway, which will be filled in), abutting Gladstone Avenue.
130 m away · filed Apr 17, 2025 · Application withdrawn
725 Gladstone Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear second storey addition above the existing rear one-storey addition with a Juliet balcony, that will cantilever over the existing rear basement walkout. The existing ancillary building (detached garage), in the rear yard, abutting the laneway, will be maintained and unaltered.
220 m away · filed Jun 7, 2024 · Approved
205 Westmoreland Ave · Minor variance
To convert the existing two-and-one-half-storey semi-detached dwelling into a duplex by constructing a rear two-storey addition, a rear ground floor deck, a covered front porch with a second storey balcony. Also, to construct a new two-storey ancillary building (one car lift from a basement level and one laneway suite with a second storey balcony), in the rear yard, abutting the laneway. There will be a total of three residential dwelling units on this lot (two units within the main dwelling and one unit within the ancillary building).
250 m away · filed Apr 2, 2024 · Approved
181 Hallam St · Minor variance
To alter the existing two-storey townhouse dwelling by reconstructing and enlarging the rear one-storey addition with a rear ground floor deck and reconstructing the rear basement walkout.
170 m away · filed Jan 23, 2024 · Approved
216 Westmoreland Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear third storey addition with a rear third storey deck.
220 m away · filed Nov 16, 2023 · Approved
208 Bartlett Ave · Minor variance
To construct a new four-storey detached apartment building with front and rear balconies on the second, third and fourth storeys, as well as two parking spaces in the rear yard (accessed from Hallam Street). There will be a total of 8 dwelling units (seven one-bedroom and one two-bedroom units) on this lot. All existing buildings will be demolished.
110 m away · filed Nov 2, 2023 · Approved
314 Westmoreland Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling (currently under construction, as approved by Minor Variance Application Number A1089/21TEY) by constructing a rear exterior staircase (three levels). Also, to install a secondary suite on the second and third storeys.
230 m away · filed Oct 30, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.