Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

25 Mackay Ave

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal to construct interior alterations within the existing single detached dwelling and finished basement.

    Applied Aug 23, 2016 · issued Sep 23, 2016 · completed May 3, 2017 · Permit 16 211644 PLB

    Closed
  • Small residential project · Interior alterations

    Proposal for interior alterations within the existing single detached dwelling and finished basement.

    Applied Aug 23, 2016 · issued Sep 23, 2016 · completed May 3, 2017 · Permit 16 211644 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 93 Mackay Ave · Minor variance

    To alter the existing one-storey ancillary building (detached garage, in the rear yard, abutting the laneway) by constructing a complete second storey addition for the purposes of constructing one laneway suite. The existing parking space will be maintained.

    200 m away · filed Jan 15, 2024 · Approved

  • 26 Mackay Ave · Minor variance

    To legalize and to maintain the existing rear detached garage which was constructed without the benefit of a permit.

    60 m away · filed May 10, 2022 · Approved

  • 45 Via Italia · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front basement walkout in order to provide direct access to the secondary suite within the basement.

    240 m away · filed Apr 7, 2022 · Approved

  • 156 Rosemount Ave · Minor variance

    To legalize and maintain a front basement walkout of the existing 2½-storey semi-detached dwelling.

    60 m away · filed Oct 5, 2021 · Approved

  • 43 Norton Ave · Minor variance

    To construct a rear detached garage.

    190 m away · filed Aug 25, 2021 · Refused

  • 1626 Dufferin St · Minor variance

    To convert the existing triplex into a fourplex. The proposal includes constructing a fourth storey addition with front and rear balconies. Also, the garage will be converted for bicycle parking spaces.

    130 m away · filed Jun 18, 2021 · Approved

  • 1640 Dufferin St · Minor variance

    To convert the existing single family, two-storey detached dwelling into a two-unit, three-storey detached dwelling by constructing a rear two-storey addition, a full third-storey addition, a rear basement walkout, a rear ground floor deck, and rear second and third storey balconies. A new rear detached garage will also be constructed.

    100 m away · filed Apr 15, 2021 · Approved

  • 32 Peterborough Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition and to convert the one-unit building to a two-unit building.

    240 m away · filed Mar 23, 2021 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.