Toronto address · Ward 9, Davenport
27 Mackay Ave
The City of Toronto has 4 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revocation pending
Plumbing
Plumbing - Proposal to construct a second storey addition.
Applied Mar 28, 2022 · issued Apr 20, 2022 · Permit 22 127791 PLB
- Permit issued
Small residential project · Addition(s)
Proposal to construct a second storey addition (over ex. rear one storey portion)
Applied Mar 28, 2022 · issued Apr 20, 2022 · Permit 22 127791 BLD
- Revocation pending
Heating and ventilation
HVAC - Proposal to construct a second storey addition.
Applied Mar 28, 2022 · issued Apr 20, 2022 · Permit 22 127791 HVA
- Closed
Small residential project · Garage
Construct a detached garage at rear of property
Applied Aug 4, 2004 · issued Aug 4, 2004 · completed May 28, 2018 · Permit 04 163119 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
93 Mackay Ave · Minor variance
To alter the existing one-storey ancillary building (detached garage, in the rear yard, abutting the laneway) by constructing a complete second storey addition for the purposes of constructing one laneway suite. The existing parking space will be maintained.
200 m away · filed Jan 15, 2024 · Approved
26 Mackay Ave · Minor variance
To legalize and to maintain the existing rear detached garage which was constructed without the benefit of a permit.
60 m away · filed May 10, 2022 · Approved
45 Via Italia · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front basement walkout in order to provide direct access to the secondary suite within the basement.
230 m away · filed Apr 7, 2022 · Approved
156 Rosemount Ave · Minor variance
To legalize and maintain a front basement walkout of the existing 2½-storey semi-detached dwelling.
60 m away · filed Oct 5, 2021 · Approved
43 Norton Ave · Minor variance
To construct a rear detached garage.
190 m away · filed Aug 25, 2021 · Refused
1626 Dufferin St · Minor variance
To convert the existing triplex into a fourplex. The proposal includes constructing a fourth storey addition with front and rear balconies. Also, the garage will be converted for bicycle parking spaces.
130 m away · filed Jun 18, 2021 · Approved
1640 Dufferin St · Minor variance
To convert the existing single family, two-storey detached dwelling into a two-unit, three-storey detached dwelling by constructing a rear two-storey addition, a full third-storey addition, a rear basement walkout, a rear ground floor deck, and rear second and third storey balconies. A new rear detached garage will also be constructed.
110 m away · filed Apr 15, 2021 · Approved
32 Peterborough Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition and to convert the one-unit building to a two-unit building.
240 m away · filed Mar 23, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.