Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

2873 Lake Shore Blvd W

The City of Toronto has 6 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Revision to layout.HVAC - Interior alterations to create a Fitness Centre.

    Applied Sep 18, 2017 · issued Oct 6, 2017 · Permit 17 106032 HVA (revision 02)

    Revision issued
  • Heating and ventilation

    Rvise as per plans. HVAC - Interior alterations to create a Fitness Centre.

    Applied Aug 10, 2017 · completed Sep 1, 2017 · Permit 17 106032 HVA (revision 01)

    Cancelled
  • Designated structure · Sign building permit related

    Proposal to erect and display four illuminated wall signs displaying static copy, three on first storey of the northerly elevation measuring 1.63 m by 3.05 m, 1.63 m by 4.32 m, and 1.63 m by 3.05 m, and one on the first storey of the north-easterly elevation measuring 1.22 m by 1.22 m, all at a height of 7.0 m. **VIVE FITNESS**

    Applied Apr 4, 2017 · issued May 9, 2017 · completed Aug 31, 2017 · Permit 17 138997 DST

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to create a Fitness Centre.

    Applied Jan 20, 2017 · issued Jul 21, 2017 · Permit 17 106032 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to create a Fitness Centre.(Industrial to fitness club see cofa decision)

    Applied Jan 18, 2017 · issued Jul 21, 2017 · completed Aug 15, 2017 · Permit 17 106032 BLD

    Closed
  • Plumbing

    Plumbing - Interior alterations to create a Fitness Centre.

    Applied Jan 18, 2017 · issued Jul 21, 2017 · completed Aug 4, 2017 · Permit 17 106032 PLB

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To construct a fitness centre on the ground floor of the existing commercial building.

    Decision: Approved (hearing Jun 29, 2017)

    Filed May 4, 2017 · File A0408/17EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 140 Fourth St · Minor variance

    To construct a new ancillary building (detached garage) in the rear yard.

    220 m away · filed Apr 25, 2025 · Approved

  • 38 Third St · Minor variance

    To construct a new duplex with an attached garage.

    220 m away · filed Dec 27, 2024 · Approved

  • 38 Third St · Minor variance

    To construct a new duplex with an attached garage.

    220 m away · filed Dec 27, 2024 · Approved

  • 38 Third St · Consent

    To obtain consent to sever the property into two undersized residential lots.

    220 m away · filed Dec 24, 2024 · Approved

  • 150 Sixth St · Minor variance

    To construct a new laneway house in the rear yard.

    190 m away · filed Sep 18, 2024 · Approved

  • 108 Fourth St · Minor variance

    To construct a second storey addition above the existing dwelling and a second storey rear addition.

    130 m away · filed Jun 10, 2024 · Approved

  • 168 Fifth St · Minor variance

    To construct a new detached dwelling with an attached garage.

    220 m away · filed Feb 5, 2024 · Approved

  • 118 Fifth St · Minor variance

    To legalize and to maintain the garden suite that is currently under construction.

    70 m away · filed Dec 4, 2023 · Refused

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.